B02C19/00

Asphalt shingle waste roofing materials and related methods

Non-limiting embodiments of the present disclosure relate to a method comprising: obtaining asphalt shingle waste (ASW) and performing grinding, screening, and separating steps on the ASW. In some embodiments, granules are removed from the ASW. In some embodiments, the method transforms ASW into ASW powder. In some embodiments, the ASW powder is formed into a plurality of briquettes. In some embodiments, at least one of: the ASW powder, the plurality of briquettes, or any combination thereof is fed into a mixing process that results in an ASW powder filled coating.

ASPHALT SHINGLE WASTE POWDERS AND RELATED METHODS

Non-limiting embodiments of the present disclosure relate to a method comprising: obtaining asphalt shingle waste (ASW) and performing grinding, screening, and separating steps on the ASW. In some embodiments, granules are removed from the ASW. In some embodiments, the method transforms ASW into ASW powder. In some embodiments, the ASW powder is formed into a plurality of briquettes. In some embodiments, at least one of: the ASW powder, the plurality of briquettes, or any combination thereof is fed into a mixing process that results in an ASW powder filled coating.

METHODS OF FORMING ASPHALT COATINGS FROM ASPHALT SHINGLE WASTE

Non-limiting embodiments of the present disclosure relate to a method comprising: obtaining asphalt shingle waste (ASW) and performing grinding, screening, and separating steps on the ASW. In some embodiments, granules are removed from the ASW. In some embodiments, the method transforms ASW into ASW powder. In some embodiments, the ASW powder is formed into a plurality of briquettes. In some embodiments, at least one of: the ASW powder, the plurality of briquettes, or any combination thereof is fed into a mixing process that results in an ASW powder filled coating.

ASPHALT SHINGLE WASTE ROOFING MATERIALS AND RELATED METHODS

Non-limiting embodiments of the present disclosure relate to a method comprising: obtaining asphalt shingle waste (ASW) and performing grinding, screening, and separating steps on the ASW. In some embodiments, granules are removed from the ASW. In some embodiments, the method transforms ASW into ASW powder. In some embodiments, the ASW powder is formed into a plurality of briquettes. In some embodiments, at least one of: the ASW powder, the plurality of briquettes, or any combination thereof is fed into a mixing process that results in an ASW powder filled coating.

Methods of forming an asphalt shingle waste powder from asphalt shingle waste

Non-limiting embodiments of the present disclosure relate to a method comprising: obtaining asphalt shingle waste (ASW) and performing grinding, screening, and separating steps on the ASW. In some embodiments, granules are removed from the ASW. In some embodiments, the method transforms ASW into ASW powder. In some embodiments, the ASW powder is formed into a plurality of briquettes. In some embodiments, at least one of: the ASW powder, the plurality of briquettes, or any combination thereof is fed into a mixing process that results in an ASW powder filled coating.

A plant for shredding metal waste and a method for the use thereof
20220297134 · 2022-09-22 ·

A plant for shredding metal waste, comprising at least one working chamber, means for shredding metal waste and motor means operatively connected to the shredding means. The plant further comprising sensor means operatively associated with the motor means and/or shredding means for monitoring at predetermined time intervals at least one working parameter connected to the wear thereof, and at least one data processing unit operatively connected to the sensor means. The data processing unit including: data storage means for storing for a predetermined period of time the values of said at least one working parameter detected by said sensor means and an an artificial intelligence software program so as to allow the plant manager to plan the maintenance of the motor means and/or shredding means.

METHODS OF FORMING AN ASPHALT SHINGLE WASTE POWDER FROM ASPHALT SHINGLE WASTE

Non-limiting embodiments of the present disclosure relate to a method comprising: obtaining asphalt shingle waste (ASW) and performing grinding, screening, and separating steps on the ASW. In some embodiments, granules are removed from the ASW. In some embodiments, the method transforms ASW into ASW powder. In some embodiments, the ASW powder is formed into a plurality of briquettes. In some embodiments, at least one of: the ASW powder, the plurality of briquettes, or any combination thereof is fed into a mixing process that results in an ASW powder filled coating.

Method for preparing tissue, particularly adipose tissue, for transplantation from lobular fat extracted by liposuction
11389616 · 2022-07-19 · ·

A method of preparing adipose tissue for transplantation, from lobular fat extracted, for instance, by liposuction, the fat including a fluid component that also includes an oily component, a blood component and/or sterile solutions and of a solid component that includes cell fragments, cells and one or more cell macroagglomerates of heterogeneous size, characterized in that it includes at least one step of forming an emulsion of the fluid component in the sterile washing solution by active and/or passive stirring and discharging the emulsion from the outlet through a density gradient.

METHOD AND PLANT FOR THE PROCESSING OF WASTE
20220241794 · 2022-08-04 ·

A plant for the processing of waste includes an outer housing and a grinding cell, in which a grinding chamber is defined having at least one inlet opening for introducing the waste to be processed, and at least one outlet opening for discharging the material resulting from waste processing. The openings are associated with a corresponding closure element, adapted to isolate the grinding chamber from the outer environment. The outer housing defines therein a space receiving the grinding cell and integrally surrounds the grinding cell, and in which the space is accessible through at least one door.

Mill liner installation

The present disclosure relates to a method for use in installation of a mill liner, the method including (a) retaining a mounting bolt at least partially within a liner opening extending through the mill liner, (b) positioning the mill liner against a mill shell so that the retained mounting bolt is aligned with a mill shell opening extending through the mill shell, (c) selectively coupling an extraction tool to the mounting bolt, the coupling performed by an operator outside of the mill shell, (d) detaching the mounting bolt from the liner using the extraction tool; (e) pulling the mounting bolt through the mill shell opening so that at least a portion of the mounting bolt protrudes outside of the mill shell, and, (e) securing a fastener onto the mounting bolt to thereby attach the mill liner to the mill.