B63B85/00

PROCESS FOR RECYCLING COMPONENTS OF A CONFINED SPACE METAL CONTAINER
20210046341 · 2021-02-18 ·

A safety process for recycling components of a confined space metal container reducing sparking, significantly mitigating worker exposure to fires by forming a first safety water blanket in first compartment, cutting a first top off, cutting off a first side, and a second side if needed. Next, pumping the first safety water blanket into a second compartment of the confined space metal container then cutting first piping out of the first compartment, and removing to a second containment area. Excavating equipment is used to remove portions of hydrocarbons from the first compartment and loading the hydrocarbons for transport; then cutting a bottom off the first compartment, and lifting the bottom onto the second containment area and cutting the bottom into preset mill sizes for recycling. Repeating the steps for additional components.

PROCESS FOR RECYCLING COMPONENTS OF A CONFINED SPACE METAL CONTAINER
20210046341 · 2021-02-18 ·

A safety process for recycling components of a confined space metal container reducing sparking, significantly mitigating worker exposure to fires by forming a first safety water blanket in first compartment, cutting a first top off, cutting off a first side, and a second side if needed. Next, pumping the first safety water blanket into a second compartment of the confined space metal container then cutting first piping out of the first compartment, and removing to a second containment area. Excavating equipment is used to remove portions of hydrocarbons from the first compartment and loading the hydrocarbons for transport; then cutting a bottom off the first compartment, and lifting the bottom onto the second containment area and cutting the bottom into preset mill sizes for recycling. Repeating the steps for additional components.

ELECTRICALLY-ACTIVATED PRESSURE VESSELS FOR FRACTURING FRANGIBLE STRUCTURES
20200348112 · 2020-11-05 ·

An apparatus includes a pressure device bonded to the surface of a structure at a bonding location. The vessel comprises an interior space within the vessel and a bonding surface. A bonding agent bonds the bonding surface of the vessel to a surface of the structure. A gas-emitting material is disposed within the interior space of the vessel and an initiator is arranged to activate the gas-emitting material. Upon activation of the gas-emitting material by the initiator, the pressure device produces a localized force that breaks the structure.

Folding, hard sided boat
10633064 · 2020-04-28 ·

A method of stowing a boat is disclosed. The boat may include three hull segments, namely a first hull segment, a second hull segment, and a third hull segment. The third hull segment may form the bow of the boat. The method may include separating the third hull segment from the other hull segments. Thereafter, one of the first hull segment and the second hull segment may be pivoted and inverted over onto the other such that the first hull segment and the second hull segment collectively form a clamshell enclosure. The relative sizing of the first, second, and third hull segments may be such that the third hull segment may be stored within an interior volume of the enclosure.

FOLDING, HARD SIDED BOAT
20200115008 · 2020-04-16 ·

A method of stowing a boat is disclosed. The boat may include three hull segments, namely a first hull segment, a second hull segment, and a third hull segment. The third hull segment may form the bow of the boat. The method may include separating the third hull segment from the other hull segments. Thereafter, one of the first hull segment and the second hull segment may be pivoted and inverted over onto the other such that the first hull segment and the second hull segment collectively form a clamshell enclosure. The relative sizing of the first, second, and third hull segments may be such that the third hull segment may be stored within an interior volume of the enclosure.

Offshore platform deck removal method
12012707 · 2024-06-18 · ·

A method for lifting a payload of an offshore platform is provided. The offshore platform comprises a support structure supporting the payload. The payload includes a main deck and a column directly connected to the support structure, the column supporting the main deck. The method includes coupling a plurality of tension rods to a lower lifting device, having a welding surface weldable to a welding portion of the column and an upper lifting device having a coupling interface such that the plurality of tension rods connect the lower lifting device and the upper lifting device. The plurality of extendable tension rods can extend along a rod direction between the lower lifting device and the upper lifting device to separate the payload from the support structure. At least some of the tension rods of the plurality of tension rods are pre-tensioned to exert a compressive action to the payload.

Offshore platform deck removal method
12012707 · 2024-06-18 · ·

A method for lifting a payload of an offshore platform is provided. The offshore platform comprises a support structure supporting the payload. The payload includes a main deck and a column directly connected to the support structure, the column supporting the main deck. The method includes coupling a plurality of tension rods to a lower lifting device, having a welding surface weldable to a welding portion of the column and an upper lifting device having a coupling interface such that the plurality of tension rods connect the lower lifting device and the upper lifting device. The plurality of extendable tension rods can extend along a rod direction between the lower lifting device and the upper lifting device to separate the payload from the support structure. At least some of the tension rods of the plurality of tension rods are pre-tensioned to exert a compressive action to the payload.

Conversion of movable offshore drilling structure to wind turbine application
10302068 · 2019-05-28 · ·

The present disclosure generally relates to movable offshore platforms for installing wind turbines, and methods of forming the same. The movable offshore platforms are offshore platforms which were previously used in hydrocarbon production, such as jack-up units. The movable offshore platforms may be decommissioned and retrofitted with equipment for installing wind turbines. The movable offshore platforms may be American-made or otherwise Jones Act compliant. Methods of forming the same are also included.

METHOD FOR CONVERSION OF A VESSEL FOR USE AS FLOATING LIQUEFIED NATURAL GAS FACILITY

A method for conversion of a Very Large Ore Carrier (VLOC) to an FLNG vessel for offshore stranded gas reservoirs and at-shore or near-shore Liquefied Natural Gas (LNG) export terminals.

Method for conversion of a vessel for use as floating liquefied natural gas facility

A method for conversion of a Very Large Ore Carrier (VLOC) to an FLNG vessel for offshore stranded gas reservoirs and at-shore or near-shore Liquefied Natural Gas (LNG) export terminals.