E02B8/00

Water Control Gate Anchoring Methods and Systems
20180209111 · 2018-07-26 ·

The present invention relates to inflatable bladder actuated water control gates for control of open channels such as rivers and canals and for control of dam spillways without the need for intermediate piers. The air bladder and hinge flap wedge clamping system includes hinged engagement of the upstream edge of the clamps to the foundation so as to prevent the application of bending and shear loads to the anchor bolts. The resulting configuration facilitates the use of high strength alloy steel anchor bolts in a corrosion protected environment and also prevents tensile loading of the concrete foundation and associated cracking of the concrete foundation.

WAVE SUPPRESSOR AND SEDIMENT COLLECTION SYSTEM
20180179715 · 2018-06-28 ·

A system and method to provide water and sediment flow through a dam or rock jetty, including a plurality of flow pipes positioned through the dam or jetty to receive water carrying sediment and a principal flow pipe to receive flow from the plurality of flow pipes and to deposit water and sediment a predetermined distance to the rear of the dam or jetty. A continuous trough may be mounted on the jetty forward face to efficiently capture water and sediment at entrances of the plurality of flow pipes. A system and method is also provided to suppress wave action against a shoreline and to collect sediment to build up the shoreline, comprising shelves extending out from a front wall of each body section, below a plurality of flow pipes, the shelves for shearing a wave and dispersing and using wave energy to direct sediment through the flow pipes.

WAVE SUPPRESSOR AND SEDIMENT COLLECTION SYSTEM
20180179715 · 2018-06-28 ·

A system and method to provide water and sediment flow through a dam or rock jetty, including a plurality of flow pipes positioned through the dam or jetty to receive water carrying sediment and a principal flow pipe to receive flow from the plurality of flow pipes and to deposit water and sediment a predetermined distance to the rear of the dam or jetty. A continuous trough may be mounted on the jetty forward face to efficiently capture water and sediment at entrances of the plurality of flow pipes. A system and method is also provided to suppress wave action against a shoreline and to collect sediment to build up the shoreline, comprising shelves extending out from a front wall of each body section, below a plurality of flow pipes, the shelves for shearing a wave and dispersing and using wave energy to direct sediment through the flow pipes.

Economical debris flow blocking dam structure and construction method thereof
09995013 · 2018-06-12 ·

The present invention relates to an economical debris flow blocking dam structure and a construction method thereof. The structure has an excavated foundation surface, and a dam body of the blocking dam is composed of a key wall arranged at a dam toe, dam body concrete wrapped on an outer surface of the whole blocking dam, concrete masonry block stones filled inside the blocking dam, and a plurality of drain holes formed in the dam body in a top and twin-side bottom shape; an open and centralized overflow weir is arranged on the top of the blocking dam; an overflow surface has a horizontal middle and extends to two sides along a longitudinal slope i of 10-20%; and the key wall is anchored on the foundation surface through joint bars stretching into bedrock, and an anti-scouring pit is formed close to a downstream side of the key wall.

Economical debris flow blocking dam structure and construction method thereof
09995013 · 2018-06-12 ·

The present invention relates to an economical debris flow blocking dam structure and a construction method thereof. The structure has an excavated foundation surface, and a dam body of the blocking dam is composed of a key wall arranged at a dam toe, dam body concrete wrapped on an outer surface of the whole blocking dam, concrete masonry block stones filled inside the blocking dam, and a plurality of drain holes formed in the dam body in a top and twin-side bottom shape; an open and centralized overflow weir is arranged on the top of the blocking dam; an overflow surface has a horizontal middle and extends to two sides along a longitudinal slope i of 10-20%; and the key wall is anchored on the foundation surface through joint bars stretching into bedrock, and an anti-scouring pit is formed close to a downstream side of the key wall.

PONDAGE DEVICE
20180119378 · 2018-05-03 ·

The invention relates to a pondage device (1) including a dam (2) and an improvement (3), arranged downstream from said dam, referred to as a downstream improvement. Said device is characterised in that it includes at least one flexible cylinder (4) positioned between said dam (2) and said improvement (3), and in that said flexible cylinder (4) includes a chamber (41) inside of which water is stored, said chamber being at least partially defined by a deformable membrane (40), said chamber (41) being kept under pressure by pressurisation means (5).

PONDAGE DEVICE
20180119378 · 2018-05-03 ·

The invention relates to a pondage device (1) including a dam (2) and an improvement (3), arranged downstream from said dam, referred to as a downstream improvement. Said device is characterised in that it includes at least one flexible cylinder (4) positioned between said dam (2) and said improvement (3), and in that said flexible cylinder (4) includes a chamber (41) inside of which water is stored, said chamber being at least partially defined by a deformable membrane (40), said chamber (41) being kept under pressure by pressurisation means (5).

Water control gate anchoring system and method
09957681 · 2018-05-01 ·

The present invention relates to inflatable bladder actuated water control gates for control of open channels such as rivers and canals and for control of dam spillways without the need for intermediate piers. The air bladder and hinge flap wedge clamping system includes hinged engagement of the upstream edge of the clamps to the foundation so as to prevent the application of bending and shear loads to the anchor bolts. The resulting configuration facilitates the use of high strength alloy steel anchor bolts in a corrosion protected environment and also prevents tensile loading of the concrete foundation and associated cracking of the concrete foundation.

Water control gate anchoring system and method
09957681 · 2018-05-01 ·

The present invention relates to inflatable bladder actuated water control gates for control of open channels such as rivers and canals and for control of dam spillways without the need for intermediate piers. The air bladder and hinge flap wedge clamping system includes hinged engagement of the upstream edge of the clamps to the foundation so as to prevent the application of bending and shear loads to the anchor bolts. The resulting configuration facilitates the use of high strength alloy steel anchor bolts in a corrosion protected environment and also prevents tensile loading of the concrete foundation and associated cracking of the concrete foundation.

Wave suppressor and sediment collection system
09885163 · 2018-02-06 ·

A system and method to provide water and sediment flow through a dam or rock jetty, including a plurality of flow pipes positioned through the dam or jetty to receive water carrying sediment and a principal flow pipe to receive flow from the plurality of flow pipes and to deposit water and sediment a predetermined distance to the rear of the dam or jetty. A continuous trough may be mounted on the jetty forward face to efficiently capture water and sediment at entrances of the plurality of flow pipes. A system and method is also provided to suppress wave action against a shoreline and to collect sediment to build up the shoreline, comprising shelves extending out from a front wall of each body section, below a plurality of flow pipes, the shelves for shearing a wave and dispersing and using wave energy to direct sediment through the flow pipes.