Patent classifications
E02D19/00
SYSTEM AND METHOD FOR HEATING THE GROUND
A frost removal system is for thawing frozen ground and a method removes frost from a selected area of frozen ground. The method can include providing at least one heat transfer device; auguring a hole into the frozen ground to at least a depth of the frost. The at least one heat transfer device is lowered into the selected area of frozen ground and self-augured to the predetermined depth. The at least one heat transfer device is heated and the heat is allowed to travel along a length of the at least one heat transfer device. Heat is applied from the at least one heat transfer device for thawing the selected area of frozen ground until the frost is removed. The removal system may also be used to remove moisture from saturated soil and to bake columns of soil with increased load-bearing capacity.
SYSTEM AND METHOD FOR HEATING THE GROUND
A frost removal system is for thawing frozen ground and a method removes frost from a selected area of frozen ground. The method can include providing at least one heat transfer device; auguring a hole into the frozen ground to at least a depth of the frost. The at least one heat transfer device is lowered into the selected area of frozen ground and self-augured to the predetermined depth. The at least one heat transfer device is heated and the heat is allowed to travel along a length of the at least one heat transfer device. Heat is applied from the at least one heat transfer device for thawing the selected area of frozen ground until the frost is removed. The removal system may also be used to remove moisture from saturated soil and to bake columns of soil with increased load-bearing capacity.
Drainage devices and system
A drainage device for use under the floor of a building to facilitate drainage of water along a foundation of the building under the floor. The drainage device can include a corner drainage device that is capable of assuming a number of near 90 degree shapes so that the drainage device can be easily fitted to the corner of the foundation. A bridge drainage device permits more rapid installation of the drainage devices. The bridge device can be used to bridge between two drainage devices so that it is not necessary to cut the drainage devices precisely to fit on a footing of any selected length.
Drainage devices and system
A drainage device for use under the floor of a building to facilitate drainage of water along a foundation of the building under the floor. The drainage device can include a corner drainage device that is capable of assuming a number of near 90 degree shapes so that the drainage device can be easily fitted to the corner of the foundation. A bridge drainage device permits more rapid installation of the drainage devices. The bridge device can be used to bridge between two drainage devices so that it is not necessary to cut the drainage devices precisely to fit on a footing of any selected length.
System and method for stabilization of structures by control of soil moisture content
A soil stabilization system for a structure can include a stem wall and floor slab disposed within a perimeter of the stem wall. An aggregate base course (ABC) layer can be disposed within a perimeter of the stem wall and below the floor slab. A ventilation opening can extend to the ABC layer, and an air exhaust system can extend between the ABC layer and an exterior of the structure. A method of soil stabilization for a structure can include measuring a moisture content of an expansive soil below a structure, drawing dry air through the ABC layer and over a surface of an expansive soil. Moisture can be removed from the expansive soil into the dry air by evaporation to create moist air, and moist air can be evacuated at an exterior of the structure.
System and method for stabilization of structures by control of soil moisture content
A soil stabilization system for a structure can include a stem wall and floor slab disposed within a perimeter of the stem wall. An aggregate base course (ABC) layer can be disposed within a perimeter of the stem wall and below the floor slab. A ventilation opening can extend to the ABC layer, and an air exhaust system can extend between the ABC layer and an exterior of the structure. A method of soil stabilization for a structure can include measuring a moisture content of an expansive soil below a structure, drawing dry air through the ABC layer and over a surface of an expansive soil. Moisture can be removed from the expansive soil into the dry air by evaporation to create moist air, and moist air can be evacuated at an exterior of the structure.
GROUND GUTTER SYSTEM
A ground gutter system, including an inner surface to receive water thereupon, the inner surface including at least one hole, a border surrounding the inner surface, and a pipe connected at a first end to the at least one hole to direct the water away from the ground gutter system out a second end.
System and method for heating the ground
A frost removal system is for thawing frozen ground and a method removes frost from a selected area of frozen ground. The method can include providing at least one heat transfer device; auguring a hole into the frozen ground to at least a depth of the frost. The at least one heat transfer device is lowered into the selected area of frozen ground and self-augured to the predetermined depth. The at least one heat transfer device is heated and the heat is allowed to travel along a length of the at least one heat transfer device. Heat is applied from the at least one heat transfer device for thawing the selected area of frozen ground until the frost is removed. The removal system may also be used to remove moisture from saturated soil and to bake columns of soil with increased load-bearing capacity.
System and method for heating the ground
A frost removal system is for thawing frozen ground and a method removes frost from a selected area of frozen ground. The method can include providing at least one heat transfer device; auguring a hole into the frozen ground to at least a depth of the frost. The at least one heat transfer device is lowered into the selected area of frozen ground and self-augured to the predetermined depth. The at least one heat transfer device is heated and the heat is allowed to travel along a length of the at least one heat transfer device. Heat is applied from the at least one heat transfer device for thawing the selected area of frozen ground until the frost is removed. The removal system may also be used to remove moisture from saturated soil and to bake columns of soil with increased load-bearing capacity.
System, method and apparatus for basement footer concrete forms and drainage-related components
A system for a basement concrete form and drainage are disclosed. The system may include a lineal that is a horizontal concrete form for a footer for a wall and a basement floor. The lineal may include a rectilinear tubular structure having a cavity, an outer wall, and drain perforations in the outer wall to permit fluid transmission from the cavity to an exterior of the lineal. In addition, a retainer may be mounted to a stake for the basement concrete form when the stake is embedded in a formation underlying the lineal. The retainer may be selectively vertically positioned along the stake to adjust a height of the lineal relative to the underlying formation.