Two-piece polygon shaped metal fin tube foundation and method of making same
10422097 · 2019-09-24 · ·

A metal fin tube foundation includes a pair of coupled metal plates, each plate being comprised of a plurality of flat panels, wherein each panel is positioned at an angle relative to an adjacent panel, and each plate including a fin on each lateral end of each plate, wherein each fin overlaps a fin of the other metal plate forming two pairs of overlapped fins, wherein the plates are coupled along each of the two pairs of overlapped fins; wherein the plurality of panels of the coupled two metal plates form a closed perimeter polygon shape having an open interior and wherein each pair of overlapped fins form a combined fin element which extends away from the perimeter of the polygon.

METHOD OF POWER MANAGEMENT IN PILE FOUNDATION HAVING A BASE MACHINE AND AN ATTACHMENT INSTALLED THEREAT
20190264413 · 2019-08-29 ·

The present invention relates to a method of power management during pile foundation having a base machine for excavating a borehole and an attachment installed at the base machine for a simultaneous introduction of a casing into the ground, wherein the energy supply for the attachment is at least partially provided by the base machine and a control of the base machine dynamically regulates the energy flow from the base machine to the attachment.

EROSION CONTROL AND WATER FLOW CONTROL
20190264407 · 2019-08-29 ·

A bio-friendly water flow control system can include a portable structure adapted to contain organic waste material. The water flow control system can be configured for deployment outdoors to guide water flow to limit erosion. A portable structure of such a system can include a sheath that is configured to contain waste material within an interior of the sheath. The portable structure may be configured to allow a flow of water into the interior of the sheath. The portable structure may include a waste material that includes processed palm frond particles. The portable structure may be configured to absorb a weight of water at least 50% greater than a dry weight of the portable structure.

Metal Plate Foundations with Integral Planar Fins
20190257053 · 2019-08-22 ·

A metal foundation includes a plurality of metal plate bodies coupled together forming the metal foundation, each metal plate body being comprised of lateral ends with integrated planar fins, wherein each of the lateral ends overlap a lateral end of an adjacent metal plate body, wherein the plurality of the metal plate bodies are configured for forming a closed perimeter of a geometrical shape having an open interior and wherein the integrated planar fins of each metal plate body extends away from the perimeter of the closed geometric shape along the plane of the planar fin, wherein each planar fin has a thickness substantially the same as a thickness of the portion of the metal plate body forming the closed perimeter of the geometrical shape, and wherein each planar fin extends substantially along a single plane from the perimeter of the closed geometric shape.

Construction method for reinforcing and repairing steel pipe pile for offshore wind power
11993909 · 2024-05-28 · ·

A construction method for reinforcing and repairing a steel pipe pile for offshore wind power includes the following steps. Installing multiple support ribs on an outer wall of a steel pipe pile to be repaired along a circumferential direction. Placing multiple support plate components on the support ribs and performing splicing along the outer wall of the steel pipe pile to form an annular support plate assembly. Installing multiple hoop cylinder components on the support plate assembly, performing splicing along the outer wall of the steel pipe pile to form an annular hoop cylinder assembly, and forming a grouting cavity between the hoop cylinder assembly and the steel pipe pile. Connecting grouting pipelines to grouting ports of the hoop cylinder assembly, and performing a grouting operation. After grouting, forming a reinforcement and repair structure on the outer wall of the steel pipe pile when grouting materials are solidified.

Drill head for a drilling device for creating drill holes in insufficiently stable foundation
10337253 · 2019-07-02 · ·

A drill head for a drilling device for making drill holes in insufficiently stable foundation by displacement of soil material has a base plate, with which the drill pipe end is detachably connected and is closable, on which base plate at least one drill head plate, oriented substantially perpendicular thereto, is placeable. Insertable in the lateral flanks is at least one curved plate, which is provided with first holding means, which are held in second holding means, which are attached on the lateral flanks of the drill head plate. The curved plate is designed in a way and is insertable in the flanks of the drill head plate such that its surfaces are effective as screw faces during the drilling process. The efficiency of the drilling can thereby be improved.

Method and apparatus for emplacing steel columns
10323377 · 2019-06-18 ·

A sonic drilling apparatus with adapter for emplacing columns includes a sonic drilling apparatus having a fitting. An adapter is coupled to the fitting. The adapter includes a base having a socket extending upwardly therefrom and coupled to the fitting, and a coupling mechanism extending downwardly from the base. A tubular polygonal column is removably attached to the adapter by the coupling mechanism.

GEOTURF TUBES AND IMPROVEMENTS TO CONVENTIONAL GEOTUBES

A geoturf tube for stabilization of erodible ground surfaces said geoturf tube formed of a geotextile fabric in a tubular shape and configured to contain sands but allow water to pass through and a tufted tensile elements cover attached to at least a portion of the geotextile fabric. Alternatively, a geoturf cover of a geotextile and a plurality of tufted tensile elements installed as a separate layer above a geotube to serve as a protective barrier and extend the service life of the geotube. A method of stabilization of erodible surfaces with a geoturf tube or a geoturf cover is disclosed.

DEVICE FOR PRODUCING A TUBULAR CONTAINER
20190144145 · 2019-05-16 · ·

A device is provided for producing a tubular container which is able to be filled with granular, pulverulent, pourable and flowable materials, wherein the container can include webs manufactured from geotextile material. The device includes a displaceable frame with at least one unwindable geotextile web, wherein the frame includes a filling trough with an outlet hopper for the material, and wherein the filling trough has a conveying device for the filled material, the conveying device acting counter to the direction of movement of the frame, which, at the rear end of the filling trough, surrounds the material in an enveloping manner, in the region of the outlet hopper, by the unwindable geotextile web, as the frame is advanced, so as to form a tube.

Non-welded metal foundation
10287742 · 2019-05-14 · ·

A non-welded metal foundation includes a plurality of bodies formed of metal plates or metal sheets, each body being comprised of lateral ends with integrated planar fins, wherein each of the metal lateral ends overlap a lateral end of an adjacent body; a plurality of mechanical fasteners along each of the overlapped ends of adjacent bodies for mechanically fastening the bodies having the integrated planar fins; wherein said plurality of said bodies are configured for forming a closed perimeter of a geometrical shape having an open interior and wherein the integrated planar fins of each body extend away from the perimeter of the closed geometric shape along the plane of the fin.