E02F1/00

Systems and methods for pile spacing

A method for depositing piles of material, by a machine, in a work zone of a worksite. The method comprising detecting, by a controller, a first area occupied by a first pile deposited in the work zone, determining, by the controller, an available area in the work zone based on a comparison of the first area with an area of the work zone, determining, by the controller, a remaining number of piles to be deposited in the available area based on the determination of the available area, determining, by the controller, a location for each pile of the remaining number of piles to be deposited in the available area such that each pile of the remaining number of piles are evenly spaced from each other; and generating, by the controller, a machine signal to operate the machine to form the remaining number of piles at the respective determined location.

Systems and methods for pile spacing

A method for depositing piles of material, by a machine, in a work zone of a worksite. The method comprising detecting, by a controller, a first area occupied by a first pile deposited in the work zone, determining, by the controller, an available area in the work zone based on a comparison of the first area with an area of the work zone, determining, by the controller, a remaining number of piles to be deposited in the available area based on the determination of the available area, determining, by the controller, a location for each pile of the remaining number of piles to be deposited in the available area such that each pile of the remaining number of piles are evenly spaced from each other; and generating, by the controller, a machine signal to operate the machine to form the remaining number of piles at the respective determined location.

SYSTEMS AND METHODS FOR PILE SPACING
20180341268 · 2018-11-29 · ·

A method for depositing piles of material, by a machine, in a work zone of a worksite. The method comprising detecting, by a controller, a first area occupied by a first pile deposited in the work zone, determining, by the controller, an available area in the work zone based on a comparison of the first area with an area of the work zone, determining, by the controller, a remaining number of piles to be deposited in the available area based on the determination of the available area, determining, by the controller, a location for each pile of the remaining number of piles to be deposited in the available area such that each pile of the remaining number of piles are evenly spaced from each other; and generating, by the controller, a machine signal to operate the machine to form the remaining number of piles at the respective determined location.

Implement orientation by image processing

A system for monitoring an implement of a work machine is provided. The system may include one or more image sensors mounted on the work machine configured to capture one or more images of a field of view associated with the implement, and an implement controller in electrical communication with the image sensors. The implement controller may be configured to receive the images from the image sensors, identify one or more interactive targets within the images, select one of the interactive targets based on proximity, and align the implement to the selected interactive target.

Implement orientation by image processing

A system for monitoring an implement of a work machine is provided. The system may include one or more image sensors mounted on the work machine configured to capture one or more images of a field of view associated with the implement, and an implement controller in electrical communication with the image sensors. The implement controller may be configured to receive the images from the image sensors, identify one or more interactive targets within the images, select one of the interactive targets based on proximity, and align the implement to the selected interactive target.

SPRINKLER SHOVEL APPARATUS
20180325007 · 2018-11-15 ·

A sprinkler shovel apparatus has a body having a shovel at a first end and a handle at a second end, the body further having a receptacle for receiving and storing a riser extractor, the riser extractor being coupled to the body and extendable from therein.

APPARATUS, METHODS, AND SYSTEMS FOR PRESERVING AND TRANSFERRING LAND FROM A FIRST LOCATION TO A SECOND LOCATION
20240337087 · 2024-10-10 ·

A method for transferring endangered land from a first location in a first arrangement to a second location in the same first arrangement is disclosed. The method includes cutting, with a first cutting tool, a first pair of parallel rows in a first section of land of a first location. Then cutting a second pair of parallel rows, in the first section, that are perpendicular to the first pair of parallel rows creating an intersection of land between the first and second rows defining a transferable parcel and cutting a bottom side of the transferable parcel of land. The next step in the method is to lift the transferable parcel from a ground, placing the transferable parcel onto a portable bed, transferring the portable bed to the second location, and transplanting the transferable parcel into a receiving section of land of the second location in the same first arrangement.

APPARATUS, METHODS, AND SYSTEMS FOR PRESERVING AND TRANSFERRING LAND FROM A FIRST LOCATION TO A SECOND LOCATION
20240337087 · 2024-10-10 ·

A method for transferring endangered land from a first location in a first arrangement to a second location in the same first arrangement is disclosed. The method includes cutting, with a first cutting tool, a first pair of parallel rows in a first section of land of a first location. Then cutting a second pair of parallel rows, in the first section, that are perpendicular to the first pair of parallel rows creating an intersection of land between the first and second rows defining a transferable parcel and cutting a bottom side of the transferable parcel of land. The next step in the method is to lift the transferable parcel from a ground, placing the transferable parcel onto a portable bed, transferring the portable bed to the second location, and transplanting the transferable parcel into a receiving section of land of the second location in the same first arrangement.

Method for constructing building through gravity and weight of the building structure

A method for constructing a building structure using gravity and weight of the building structure is provided. The method includes designing an architecture and a construction plan of the building structure, planning an initial box for a structural design, tuning a ground required for construction of the building structure, constructing the initial box as per the planning, constructing an upper floor on the initial box, constructing remaining parts of the building structure including foundation for the building structure, and assembling a plurality of temporary structures to the building structure.

Method for constructing building through gravity and weight of the building structure

A method for constructing a building structure using gravity and weight of the building structure is provided. The method includes designing an architecture and a construction plan of the building structure, planning an initial box for a structural design, tuning a ground required for construction of the building structure, constructing the initial box as per the planning, constructing an upper floor on the initial box, constructing remaining parts of the building structure including foundation for the building structure, and assembling a plurality of temporary structures to the building structure.