Patent classifications
E04G17/00
SELF-STRIPPING CORNER FORM
A corner form apparatus having a rigid, angled form with a pair of leg sections and a plurality of gussets extending between the leg sections. A post is mounted for axial sliding back-and-forth movement within openings formed in the gussets between a pour position and a stripped position. A linear actuator is mounted between the rigid, angled form and the post and a pair of extension mounting arms are pivotally attached to the post at a first end and pivotally attached to each to an associated form extension using slotted holes at a second end whereupon movement of the post between the pour position and the stripping position moves each of the form extensions from a position coplanar with a corresponding one of the rigid, angled form leg sections in the pour position inwardly to a stripped position.
FORMWORK SYSTEMS AND RELATED METHODS
A formwork system includes (a) a wallform panel for forming a wall portion; and (b) at least one brace assembly including a pair of vertically spaced apart props pivotably connected to the wallform panel for pivoting of the brace assembly relative to the wallform panel between a storage position, in which the brace assembly lies adjacent the wallform panel, and a deployed position, in which the brace assembly projects from the wallform panel for anchoring the props to a ground surface through a common base plate connected to each prop.
One piece molded post-tension tendon pocket former with push in retention tabs and method of use thereof
A one-piece post-tension tendon pocket former includes a pocket section configured to create a pocket in an edge of concrete, a formwork securing mechanism connected to the second end of the pocket section configured to secure the second end of the pocket section to a formwork, and an anchor securing mechanism. The anchor securing mechanism is configured to secure the pocket section to a post-tension tendon anchor with at least one fastener hole and includes an anchor sealing portion and at least one retention tab. The anchor sealing portion is configured to seal the pocket section to the post-tension tendon anchor. Each of the at least one retention tab extends from a side of the pocket section and is configured to be secured in one of the at least one fastener holes for securing the seal between the anchor sealing portion and the post-tension tendon anchor.
One piece molded post-tension tendon pocket former with push in retention tabs and method of use thereof
A one-piece post-tension tendon pocket former includes a pocket section configured to create a pocket in an edge of concrete, a formwork securing mechanism connected to the second end of the pocket section configured to secure the second end of the pocket section to a formwork, and an anchor securing mechanism. The anchor securing mechanism is configured to secure the pocket section to a post-tension tendon anchor with at least one fastener hole and includes an anchor sealing portion and at least one retention tab. The anchor sealing portion is configured to seal the pocket section to the post-tension tendon anchor. Each of the at least one retention tab extends from a side of the pocket section and is configured to be secured in one of the at least one fastener holes for securing the seal between the anchor sealing portion and the post-tension tendon anchor.
Concrete pier foundation anchor bolt support and chamfer form
Embodiments of the Concrete Form include a form tube, chamfer disk, and one or more cross-members. The cross-members are comprised of a center pivot aperture, two bolt guides, which are formed by the cross-members, end clamps, and an optional clamp. The chamfer disk is a disk that sits atop of the form tube and forms side chamfers in positive relief when placed upon the form tube when the concrete cures. The optional conduit clamp can be used to hold any conduit, tube or any other item during the pour. In another embodiment of the Concrete Form is comprised of a form tube, chamfer disk, end clamps, four or more bottom slide arms, and four or more top slide arms.
Formwork support system and method of installing a formwork support system
A formwork support system comprising: a first pair of support props, a second pair of support props, a longitudinal beam with opposite ends attached to the first pair of support props, a longitudinal support with opposite ends attached to the second pair of support props, a cantilever beam extending transversely to the longitudinal beam and the longitudinal support, respectively, the cantilever beam being supported on an upper side of the longitudinal support, the cantilever beam having a first end secured to the longitudinal beam.
CONSTRUCTION MEMBER AND FALLING OBJECT RECEIVING DEVICE
A construction member is a construction member provided on a scaffold construction body, including a base material of foamed synthetic resin, and a coating layer of polyurea resin covering a surface of the base material. A falling object receiving device has a construction member that projects from a scaffold construction body toward an external space as a falling object receiving device panel, and includes an attachment part attaching a proximal end side of the falling object receiving device panel to the scaffold construction body.
Formwork system
Various implementations described herein are directed to a formwork system. In one implementation, the formwork system includes aluminum extrusions and aluminum castings. The aluminum castings and the aluminum extrusions can be assembled by being pressed and riveted together.
Formwork system
Various implementations described herein are directed to a formwork system. In one implementation, the formwork system includes aluminum extrusions and aluminum castings. The aluminum castings and the aluminum extrusions can be assembled by being pressed and riveted together.
Bearing plate of an integrated construction system
Various implementations described herein are directed to a load bearing ledger fitting, a modular header beam, a perimeter safety deck, a multi-purpose bearing plate, and a mega-shore bearing plate of an integrated construction system.