E21B19/00

DRAWWORKS APPARATUS AND METHOD
20230145067 · 2023-05-11 ·

A method of manipulating a drum of a drawworks assembly includes removing a first plurality of fasteners releasably coupling a drum with a coupling assembly, removing a second plurality of fasteners releasably coupling the drum with a cradle assembly, and lifting the drum vertically from the drawworks assembly.

Uphole end for a compression-set straddle packer
11643901 · 2023-05-09 · ·

An uphole end for a compression-set straddle packer has a multicomponent mandrel and a multicomponent sliding sleeve that reciprocates within a limited range on the multicomponent mandrel. A bias element constantly resists relative movement between the multicomponent mandrel and the multicomponent sliding sleeve.

Uphole end for a compression-set straddle packer
11643901 · 2023-05-09 · ·

An uphole end for a compression-set straddle packer has a multicomponent mandrel and a multicomponent sliding sleeve that reciprocates within a limited range on the multicomponent mandrel. A bias element constantly resists relative movement between the multicomponent mandrel and the multicomponent sliding sleeve.

Method and apparatus for removing or reinstalling riser pipes of a riser bundle
09849550 · 2017-12-26 · ·

A method of servicing a pipe bundle or riser bundle employs a specially configured hoist having a rail that supports multiple lifts. A selected satellite pipe/conduit of the pipe bundle is both lifted and pulled horizontally in order to remove it from a plurality of supports that hold the satellite pipes together in spaced apart positions. During removal of a satellite pipe, the lifts elevate, then travel with and hold the pipe as it moves horizontally away from the bundle.

Method and apparatus for making up a plurality of joints of pipe
09849572 · 2017-12-26 ·

A method and apparatus for pulling multiple joints of pie which comprises a pulling section and a pulled section, the method and apparatus working while the joints of pipe are below grade and capable of pulling multiple joints of pipe without relocating the pulling section.

Crane system for a cantilever
11685637 · 2023-06-27 · ·

A crane system is for a cantilever belonging to a jack-up rig. The crane system has a crane with a suspension member, the suspension member being arranged over the crane. A skid beam is attached to a lower portion of the cantilever, the skid beam being displaceably connected to a plurality of slides arranged on the jack-up rig, the crane hanging on the skid beam. A method is for using the crane system.

Crane system for a cantilever
11685637 · 2023-06-27 · ·

A crane system is for a cantilever belonging to a jack-up rig. The crane system has a crane with a suspension member, the suspension member being arranged over the crane. A skid beam is attached to a lower portion of the cantilever, the skid beam being displaceably connected to a plurality of slides arranged on the jack-up rig, the crane hanging on the skid beam. A method is for using the crane system.

PIPE STORAGE AND HANDLING

A system for storing and handling pipes between a pipe rack and a derrick includes pipe-receiving chambers that are positioned around a centre region, and an elevator for lifting and descending the pipes into the chambers. The elevator, located in the centre region in between the receiving chambers, is configured for selecting one of the receiving chambers and for lifting and descending a respective pipe into the selected chamber.

Fluid supply to sealed tubulars

A Drill-To-The-Limit (DTTL) drilling method variant to Managed Pressure Drilling (MPD) applies constant surface backpressure, whether the mud is circulating (choke valve open) or not (choke valve closed). Because of the constant application of surface backpressure, the DTTL method can use lighter mud weight that still has the cutting carrying ability to keep the borehole clean. The DTTL method identifies the weakest component of the pressure containment system, such as the fracture pressure of the formation or the casing shoe leak off test (LOT). With a higher pressure rated RCD, such as 5,000 psi (34,474 kPa) dynamic or working pressure and 10,000 psi (68,948 kPa) static pressure, the limitation will generally be the fracture pressure of the formation or the LOT. In the DTTL method, since surface backpressure is constantly applied, the pore pressure limitation of the conventional drilling window can be disregarded in developing the fluid and drilling programs.

Fluid supply to sealed tubulars

A Drill-To-The-Limit (DTTL) drilling method variant to Managed Pressure Drilling (MPD) applies constant surface backpressure, whether the mud is circulating (choke valve open) or not (choke valve closed). Because of the constant application of surface backpressure, the DTTL method can use lighter mud weight that still has the cutting carrying ability to keep the borehole clean. The DTTL method identifies the weakest component of the pressure containment system, such as the fracture pressure of the formation or the casing shoe leak off test (LOT). With a higher pressure rated RCD, such as 5,000 psi (34,474 kPa) dynamic or working pressure and 10,000 psi (68,948 kPa) static pressure, the limitation will generally be the fracture pressure of the formation or the LOT. In the DTTL method, since surface backpressure is constantly applied, the pore pressure limitation of the conventional drilling window can be disregarded in developing the fluid and drilling programs.