E21B44/00

Method of predicting drilling and well operation

A method, apparatus and system is provided for assessing risk for well completion, comprising: obtaining, using an input interface, a Below Rotary Table hours and a plurality of well-field parameters for one or more planned runs, determining, using at least one processor, one or more non-productive time values that correspond to the one or more planned runs based upon the well-field parameters, developing, using at least one processor, a non-productive time distribution and a Below Rotary Table distribution via one or more Monte Carlo trials; and outputting, using a graphic display, a risk transfer model results based on a total BRT hours from the Below Rotary Table and the non-productive time distribution produced from the one or more Monte Carlo trials.

Method of predicting drilling and well operation

A method, apparatus and system is provided for assessing risk for well completion, comprising: obtaining, using an input interface, a Below Rotary Table hours and a plurality of well-field parameters for one or more planned runs, determining, using at least one processor, one or more non-productive time values that correspond to the one or more planned runs based upon the well-field parameters, developing, using at least one processor, a non-productive time distribution and a Below Rotary Table distribution via one or more Monte Carlo trials; and outputting, using a graphic display, a risk transfer model results based on a total BRT hours from the Below Rotary Table and the non-productive time distribution produced from the one or more Monte Carlo trials.

ASYMMETRIC POWER MANAGEMENT AND LOAD MANAGEMENT

A method may include receiving information related to operation or a configuration of a hydraulic fracturing system. The hydraulic fracturing system may include a plurality of electric power source outputs and a plurality of hydraulic fracturing rigs. The method may further include performing, based on the information, asymmetric power management of the plurality of electric power source outputs. The method may further include performing, based on the information, asymmetric load management of the plurality of hydraulic fracturing rigs.

ASYMMETRIC POWER MANAGEMENT AND LOAD MANAGEMENT

A method may include receiving information related to operation or a configuration of a hydraulic fracturing system. The hydraulic fracturing system may include a plurality of electric power source outputs and a plurality of hydraulic fracturing rigs. The method may further include performing, based on the information, asymmetric power management of the plurality of electric power source outputs. The method may further include performing, based on the information, asymmetric load management of the plurality of hydraulic fracturing rigs.

Method and system for diagenesis-based rock classification

A method may include obtaining various well logs or various core samples regarding a geological region of interest. The method may further include determining various permeability values, various porosity values, and various dolomite volume fraction values regarding the geological region of interest using the well logs or the core samples. The dolomite volume fraction values may correspond to a percentage of dolomite in a total mineral volume. The method may further include determining, using the porosity values, various permeability thresholds corresponding to various predetermined reservoir qualities. The method may further include generating, using the permeability thresholds, the permeability values, and the dolomite volume fraction values, a reservoir model including various dolomite boundaries defining the predetermined reservoir qualities. The method may further include determining a hydrocarbon trap prediction using the reservoir model.

Method and system for diagenesis-based rock classification

A method may include obtaining various well logs or various core samples regarding a geological region of interest. The method may further include determining various permeability values, various porosity values, and various dolomite volume fraction values regarding the geological region of interest using the well logs or the core samples. The dolomite volume fraction values may correspond to a percentage of dolomite in a total mineral volume. The method may further include determining, using the porosity values, various permeability thresholds corresponding to various predetermined reservoir qualities. The method may further include generating, using the permeability thresholds, the permeability values, and the dolomite volume fraction values, a reservoir model including various dolomite boundaries defining the predetermined reservoir qualities. The method may further include determining a hydrocarbon trap prediction using the reservoir model.

WELL TESTING OPERATIONS USING AUTOMATED CHOKE CONTROL

The disclosure presents processes to improve the calibration of adjustable choke valves corresponding to a specific size of positive choke bean. Typically, manufacturers specify a position of the adjustable choke valve that corresponds to a specific choke bean size. Hydrocarbon fluid conditions and composition vary and subterranean formation characteristics vary which can lead to errors in the calibration. By comparing flow rate parameters of the hydrocarbon fluid flowing through the adjustable choke manifold and the positive choke manifold, errors in calibration can be detected and corrected. The factors involved with the hydrocarbon fluid and the error correction can be used to update a choke model. The choke model can then be used for future calibrations of the adjustable choke valve.

WELL TESTING OPERATIONS USING AUTOMATED CHOKE CONTROL

The disclosure presents processes to improve the calibration of adjustable choke valves corresponding to a specific size of positive choke bean. Typically, manufacturers specify a position of the adjustable choke valve that corresponds to a specific choke bean size. Hydrocarbon fluid conditions and composition vary and subterranean formation characteristics vary which can lead to errors in the calibration. By comparing flow rate parameters of the hydrocarbon fluid flowing through the adjustable choke manifold and the positive choke manifold, errors in calibration can be detected and corrected. The factors involved with the hydrocarbon fluid and the error correction can be used to update a choke model. The choke model can then be used for future calibrations of the adjustable choke valve.

SYSTEMS AND METHODS FOR MONITORING ANNULAR FLUID LEVEL

A system for monitoring an annular fluid level may include a floating element disposed on a surface of a drilling fluid within an annulus of the well, during mud cap drilling operations. The system may also include an antenna disposed above the floating element. The antenna may be configured to transmit a first signal to the floating element, and to receive a second signal from the floating element in response to the first signal. The system may also include a processor configured to determine a time value that measures a time between a transmittal, by the antenna, of the first signal and a receipt, by the antenna, of the second signal. The processor may also determine a state of a drilling fluid level within the annulus based on the time value, and update a drilling program for the well based on the state of the drilling fluid level.

Wellbore perforation analysis and design system

Aspects and features include a system and method for wellbore perforation analysis and design. The system takes into account geomechanical considerations. In some examples the system determines wellbore parameters associated with a wellbore in a formation, calculates a current effective stress value associated with a hole in the formation, and determines a maximum effective stress value and a minimum wellbore pressure value. The system can then produce perforating job parameters to maximize a perforation while maintaining at least the minimum wellbore pressure value. In some examples, the system makes use of a parts database to determine job parameters that can implemented based on available parts.