E21D9/00

THREE-DIMENSIONAL GROUND MODEL GENERATION AND AUTOMATED EARTHWORK TARGET MODEL GENERATION SYSTEM BASED ON PARAMETER INPUT

The present disclosure relates to a three-dimensional ground model generation and an automated earthwork target model generation system based on a parameter input.

HIGH WALL MINING METHOD
20200355075 · 2020-11-12 ·

A high wall mining method has the steps of: providing a drilling machine with a GPS/heading locator; providing a tablet or computer accessible to cloud-based apps; downloading a software program from the cloud for high wall mining

Tunnel boring machine

Provided is a tunnel boring machine that can detect a wear condition of a disc cutter with a highly reliable configuration. The tunnel boring machine includes a measurement device. The measurement device is disposed behind the disc cutter mounted on a cutter head. The measurement device has a function as an acquisition unit that acquires cutting edge position data indicating a position of a cutting edge part of a cutter ring in the disc cutter. The tunnel boring machine further includes a DC discrimination unit that discriminates which one of a plurality of disc cutters is the disc cutter the cutting edge position data of which is acquired by the measurement device and a wear amount calculator that calculates a wear amount of the cutting edge part of the discriminated disc cutter.

Inhibited emulsions for use in blasting in reactive ground or under high temperature conditions

Methods of delivering inhibited emulsions are provided. The methods can include mixing an emulsion with a separate inhibitor solution to form the inhibited emulsion. Inhibitor solutions including water, an inhibitor, and a crystallization point modified are provided. Systems for delivering inhibited emulsions are also provided.

Systems and methods for underground pipe installation and soil clearing

Systems and methods for installing pipe underground are disclosed. The system includes a pneumatic rammer configured to provide a percussive force to a section of pipe. The system also includes a main jacking frame coupled to the pneumatic rammer, the main jacking frame including a surface for contacting the section of pipe. The system also includes one or more hydraulic jacks coupled to the main jacking frame and configured to provide a hydraulic force to the section of pipe. The system also includes a set of tracks coupled to the main jacking frame, the set of tracks permitting the main jacking frame to slide in a longitudinal direction. An independently displaceable soil-clearing system can be included to clear dirt coming inside the pipe during the installation and add extra jacking force as needed.

Use of a composition for stabilizing a geological formation in oil fields, gas fields, water pumping fields, mining or tunnel constructions

The present invention relates to the use of a composition for stabilizing a geological formation in oil fields, gas fields, water pumping fields, mining or tunnel constructions. The composition has a hardening temperature in the range from about 40 C. to about 120 C. and can therefore be used to stabilize a geological formation in oil fields, gas fields, water pumping fields as well as in mining or tunnel constructions.

Method and Apparatus for Monitoring the Interaction between Surrounding Rocks and TBM in TBM Tunneling Process
20200267456 · 2020-08-20 ·

Provided is a method and an apparatus for real-time monitoring interaction between surrounding rocks and the TBM in a TBM tunneling process. Interaction between target objects is monitored by one or more sensors to obtain test data. A first electronic device connects a collecting module with the one or more sensors through a communication serial interface of the one or more sensors. A connection state between the one or more sensors and the collecting module is judged. The connection abnormality information is recorded or the collection parameters according to the connection state are set. The first electronic device judges the collection state by monitoring the collection, and records collection abnormality information or performs one-time collection of data according to the collection state. The first electronic device stores the data in a first storage folder. A second electronic device analyzes the data, and transmits the data to a monitoring device.

Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereof

A construction method of a rectangular working well includes steps of: (I) designing functional requirements for the rectangular working well; (II) constructing a caisson of an enclosing structure of the rectangular working well; (III) constructing an edge protector; (IV) excavating earthwork of the rectangular working well; (V) forming a back cover for the rectangular working well, and pre-embedding a sliding track, a pull ring and a back wall anchor; (VI) installing a ladder for entering the rectangular working well; (VII) preventing joint leakage; (VIII) installing a water-proof pressure plate at an entrance of the preset pipe jacking hole; (IX) constructing the sliding back wall; (X) lifting the sandwich concrete slab wall at a top of the preset pipe jacking hole; and (XI) performing pipe jacking. The structure system constructed by the present invention has many advantages such as clear function, safety, quickness, and flexible design.

TUNNEL BORING ROBOT AND REMOTE MOBILE TERMINAL COMMAND SYSTEM

A tunnel boring robot includes a tunnel boring machine, a sensing unit, an intelligent decision unit, and a controller unit. The sensing unit, the intelligent decision unit and the controller unit are disposed at the tunnel boring machine. The sensing unit is configured to sense, in real time, boring operation data of a current cycle during which the tunnel boring machine is working according to set boring parameter information. The intelligent decision unit is configured to receive the boring operation data sent by the sensing unit, and generate the set boring parameter information for a next cycle according to a preset prediction algorithm, the boring operation data and a desired boring effect. The controller unit is configured to receive the set boring parameter information, and control the tunnel boring machine to perform a boring operation for the next cycle according to the set boring parameter information.

Robot automated mining

In one embodiment, the present disclosure provides a robot automated mining method. In one embodiment, a method includes a robot positioning a charging component for entry into a drill hole. In one embodiment, a method includes a robot moving a charging component within a drill hole. In one embodiment, a method includes a robot filling a drill hole with explosive material. In one embodiment, a method includes operating a robot within a mining environment.