Patent classifications
E21D20/00
Method for forming easily separable portion in packaging film, package bag having easily separable portion, and filling-packing machine
To provide a method for readily forming an easily separable portion having an adhesive strength that is required as a package bag on packaging film, a package bag having an easily separable portion formed by this method, and a filling-packing machine utilizing this method. A method forming an easily separable portion in packaging film by interposing at least two packaging films between a horn emitting ultrasonic waves and an anvil oppositely disposed to the horn, and vibrating the packaging films by the ultrasonic waves, in which a vibratable layer is provided on the packaging film in at least one of the horn side and the anvil side.
SELF-DRILLING DIFFERENTIAL GROUTING COMBINED BOLT AND ANCHORING METHOD THEREFOR
A self-drilling differential grouting combined bolt, as described consists essentially of a drill (1), a grouting pipe (2), a spindle (3), a bolt head mechanism and a bolt tail mechanism, wherein the bolt head mechanism comprises a fixed ring (4), a slip ring (7), a limiting pipe (6) and several pairs of driven linkages (501) and driving linkages (502); and the bolt tail mechanism comprises a bolt disc (11), a connecting cap (12), a spring (13) and a nut (14), the bolt disc (11) is sleeved on a rear end of the grouting pipe (2), the connecting cap (12) is passed through by the spindle (3) and blocks off the rear end of the grouting pipe (2), the connecting cap (12) is provided with a grouting hole in communication with the grouting channel in the grouting pipe (2), and a grouting hole and an air vent are provided in the bolt disc (11).
Self-supporting pneumatic hammer positioner with universal joint
A manually operated pneumatic rock drill positioner for mining shaft wall boring, said positioner comprising: an articulated boom having one end for releasable coupling to a mobile ground platform and another end opposite said one end thereof; a rigid elongated drill turret defining a main body with an exposed outer wall, an inner wall opposite said outer wall, and first side edge wall and second side edge wall opposite said first side edge wall, and first end and second end opposite said first end, a lengthwise rail member integrally mounted to said turret outer wall; a carriage slidingly engaging said rail member, said carriage for slidingly carrying a pneumatic drill head over said turret exposed outer wall for reciprocating motion thereof between said first end and second end thereof; drive means for power actuating said carriage sliding motion along said rail member; a cradle member releasably anchored to said boom another end and defining a well sized and shaped for releasable engagement by an intermediate section of said turret inner wall and said first side edge wall thereof; anchoring means for anchoring said turret to said cradle member; first coupling means for pivotally connecting said turret to said cradle member for relative pivotal movement of said turret about said cradle member along a first axis; second coupling means for pivotally connecting said turret to said cradle member for relative tilting movement of said turret about said cradle member along a second axis transverse to said first axis; all in such a way that the intersection of said first axis and second axis coincides with the center of gravity of said turret positioner and is located within said turret main body, providing a balanced load-free manual operation of the positioner.
Self-supporting pneumatic hammer positioner with universal joint
A manually operated pneumatic rock drill positioner for mining shaft wall boring, said positioner comprising: an articulated boom having one end for releasable coupling to a mobile ground platform and another end opposite said one end thereof; a rigid elongated drill turret defining a main body with an exposed outer wall, an inner wall opposite said outer wall, and first side edge wall and second side edge wall opposite said first side edge wall, and first end and second end opposite said first end, a lengthwise rail member integrally mounted to said turret outer wall; a carriage slidingly engaging said rail member, said carriage for slidingly carrying a pneumatic drill head over said turret exposed outer wall for reciprocating motion thereof between said first end and second end thereof; drive means for power actuating said carriage sliding motion along said rail member; a cradle member releasably anchored to said boom another end and defining a well sized and shaped for releasable engagement by an intermediate section of said turret inner wall and said first side edge wall thereof; anchoring means for anchoring said turret to said cradle member; first coupling means for pivotally connecting said turret to said cradle member for relative pivotal movement of said turret about said cradle member along a first axis; second coupling means for pivotally connecting said turret to said cradle member for relative tilting movement of said turret about said cradle member along a second axis transverse to said first axis; all in such a way that the intersection of said first axis and second axis coincides with the center of gravity of said turret positioner and is located within said turret main body, providing a balanced load-free manual operation of the positioner.
Device for the installation of rock bolts and cutting apparatus
A device for the installation of rock bolts includes a supporting structure and first and second bolting units mounted to the supporting structure. Each bolting unit is configured for drilling an installation hole and/or for installing a rock bolt into a rock face, wherein the supporting structure is configured for rotatably moving the first and second bolting units about a common axis of rotation. At least one actuator is mounted to the supporting structure and configured for additionally moving at least one of the first and second bolting units.
METHOD OF FORMING A ROADWAY BY FILLING GANGUE PASTE DURING WIDE-ROADWAY EXCAVATION OF THICK COAL SEAM
Provided is a method of forming a roadway by filling gangue paste during wide roadway excavation of a thick coal seam belonging to the technical field of mining industry. The method comprises: firstly designing a width of a filing strip and a width of a new excavation roadway according to a geological condition of a coal seam; secondly, determining a length of each filling, i.e. a cyclic filling interval, according to an existing excavation technical condition of a mining shaft; when the new excavation roadway is excavated, performing supporting for a roof, a floor and an inner side of a roadway by using a strong bolt and bolt-mesh-cable; then, after the new excavation roadway is excavated for the cyclic filling interval, starting to perform roadway-expanding excavation along an outer side of the roadway; when roadway-expanding excavation is performed, performing temporary supporting for a filling strip and a junction of the filling strip and the new excavation roadway by using a single hydraulic prop in cooperation with a metal articulated roof beam; finally, after roadway-expanding excavation is completed, removing temporary supports and filling the filling strip; afterwards, the above steps are performed alternately. In this way, coal losses caused by reserving coal pillars can be effectively reduced, the impact of the underground pressure during roadway excavation is relieved and the costs of gangue treatment and roadway excavation are lowered.
METHOD OF FORMING A ROADWAY BY FILLING GANGUE PASTE DURING WIDE-ROADWAY EXCAVATION OF THICK COAL SEAM
Provided is a method of forming a roadway by filling gangue paste during wide roadway excavation of a thick coal seam belonging to the technical field of mining industry. The method comprises: firstly designing a width of a filing strip and a width of a new excavation roadway according to a geological condition of a coal seam; secondly, determining a length of each filling, i.e. a cyclic filling interval, according to an existing excavation technical condition of a mining shaft; when the new excavation roadway is excavated, performing supporting for a roof, a floor and an inner side of a roadway by using a strong bolt and bolt-mesh-cable; then, after the new excavation roadway is excavated for the cyclic filling interval, starting to perform roadway-expanding excavation along an outer side of the roadway; when roadway-expanding excavation is performed, performing temporary supporting for a filling strip and a junction of the filling strip and the new excavation roadway by using a single hydraulic prop in cooperation with a metal articulated roof beam; finally, after roadway-expanding excavation is completed, removing temporary supports and filling the filling strip; afterwards, the above steps are performed alternately. In this way, coal losses caused by reserving coal pillars can be effectively reduced, the impact of the underground pressure during roadway excavation is relieved and the costs of gangue treatment and roadway excavation are lowered.
ROCK BOLT INSTALLATION TOOL
A tool aiding the installation of a rock bolt assembly in a rock hole includes: a drive shaft having a proximal end to engage with a drilling rig, and a distal end with a recess to receive a trailing end portion of the rock bolt and which has a first seat against which an axially pre-set component of the rock bolt assembly abuts; and a tubular sleeve telescopically engaged with the shaft with a first end for receiving an axially moveable component of the rock bolt assembly and which has a second seat against which the axially moveable component abuts, and a second end. The sleeve is reciprocally moveable relatively to the shaft between a biased forward position in which the axially pre-set component and the axially moveable component are spaced, and a retracted position in which the axially pre-set component engages or connects to the axially moveable component.
Expendable supply system for underground drilling
A manipulator for providing drilling expendables to a drill head of an underground drill rig includes a gripper that is arranged to selectively grip and release the drilling expendables and to move the gripper between a first position facing a supply magazine and a second position facing the drill head. The manipulator is also arranged to automatically take and return expendables to and from the magazine and drill head. A supply device provides the expendables to a drill head of an underground drill rig having the supply magazine, and to an underground drill rig, as well as an underground mining vehicle.
SUPPORT FOR DRILLING AND BOLTING TOOL
A boom for supporting a drilling and bolting tool includes a first portion including a first end and a second end, a longitudinal axis extending between the first end and the second end; a second portion including a proximal end and a distal end, the proximal end supported for translational movement relative to the first portion in a direction parallel to the longitudinal axis, the distal end configured to support the drilling and bolting tool; an actuator for moving the second portion relative to the first portion parallel to the longitudinal axis; and a fluid passage for conveying pressurized fluid between the first end of the first portion and the drilling and bolting tool adjacent the distal end of the second portion, the fluid passage positioned within the first portion and the second portion.