E21D20/00

Autonomous roof bolter and related methods

An autonomous roof bolter includes a material handling system having a storage pod with a plurality of spaced, fixed holders, each receiving at least one of a plurality of roof bolts. A guidance system may automatically guide the roof bolter to a location for installing a roof bolt, such as by using a manipulator for retrieving the roof bolt from the storage pod and delivering it to a drill mast. The guidance provided by the guidance system may be distance or direction. Related methods are disclosed.

SUPPORT FOR DRILLING AND BOLTING TOOL
20220112805 · 2022-04-14 ·

A boom for supporting a drilling and bolting tool includes a first portion including a first end and a second end, a longitudinal axis extending between the first end and the second end; a second portion including a proximal end and a distal end, the proximal end supported for translational movement relative to the first portion in a direction parallel to the longitudinal axis, the distal end configured to support the drilling and bolting tool; an actuator for moving the second portion relative to the first portion parallel to the longitudinal axis; and a fluid passage for conveying pressurized fluid between the first end of the first portion and the drilling and bolting tool adjacent the distal end of the second portion, the fluid passage positioned within the first portion and the second portion.

Six-Arm Tunneling and Anchoring Machine for Integrating Tunneling and Anchoring

Some embodiments of the present disclosure provide a six-arm tunneling and anchoring machine for integrating tunneling and anchoring, which includes: a tunneling machine and a roof-bolter connected with each other. The roof-bolter includes roof bolt units, a side bolt unit, and a working platform unit. The tunneling machine includes a frame body, a walking part, a cutting partes, a revolving body, a rear support body, a loading mechanism, a conveyor, an electronic control system, a hydraulic system, a spraying system and a cooling system. There are two sets roof bolt units, which are symmetrically arranged on the left and right sides of the frame body, and are located behind a revolving center of the revolving body. Each roof bolt unit is provided with two top anchor bolts.

CONSTRUCTION METHOD FOR ENTERING SHALLOW-BURIED MULTI-ARCH TUNNEL UNDER WATER-RICH GEOLOGICAL CONDITIONS

A construction method for a shallow-buried multi-arch tunnel under water-rich geological conditions includes the following steps: cleaning a grouting ground surface; marking a grouting reinforcement scope; performing survey setting-out; drawing a cross-section diagram to scale; calculating out coordinates and angles of anchor points that need to be set; marking drilling positions; nailing small wooden piles at the drilling positions for identifying; determining a setting depth of the anchor rods according to ground elevation; drilling holes, cleaning bottom of hole, grouting, performing construction preparation, performing long pipe shed construction at the entrance after an earth-rock of a tunnel entrance and an open cut tunnel is excavated to flush with a springing line of the tunnel. A down-the-hole drill is used for drilling in construction. Long pipe shed grouting is designed based on solidifying a soil mass in limited scope around a consolidation pipe shed.

CONSTRUCTION METHOD FOR ENTERING SHALLOW-BURIED MULTI-ARCH TUNNEL UNDER WATER-RICH GEOLOGICAL CONDITIONS

A construction method for a shallow-buried multi-arch tunnel under water-rich geological conditions includes the following steps: cleaning a grouting ground surface; marking a grouting reinforcement scope; performing survey setting-out; drawing a cross-section diagram to scale; calculating out coordinates and angles of anchor points that need to be set; marking drilling positions; nailing small wooden piles at the drilling positions for identifying; determining a setting depth of the anchor rods according to ground elevation; drilling holes, cleaning bottom of hole, grouting, performing construction preparation, performing long pipe shed construction at the entrance after an earth-rock of a tunnel entrance and an open cut tunnel is excavated to flush with a springing line of the tunnel. A down-the-hole drill is used for drilling in construction. Long pipe shed grouting is designed based on solidifying a soil mass in limited scope around a consolidation pipe shed.

Drilling and bolting device

A drill device includes a base frame, a feed frame supported for movement relative to the base frame, and a feed device for inserting a drill element into a rock surface. The base frame includes a pair of fluid cylinders. The feed frame extends along a feed axis and includes a plurality of guide bars aligned parallel to the feed axis. The feed device is supported for movement relative to the feed frame in a direction parallel to the feed axis. The feed device includes a first guide member and a second guide member. The first guide member engages a surface of at least one of the guide bars, and the second guide member engages another surface of at least one of the guide bars.

BOLTER

A drilling and bolting rig includes a carousel rotatable about a carousel axis and including a plurality of stations configured to support a plurality of consumables, one or more actuators, and a position sensor coupled to the carousel. The one or more actuators are configured to rotate the carousel about the carousel axis. The drilling and bolting rig further includes an electronic processor coupled to the one or more actuators and the position sensor. The electronic processor is configured to detect, using the position sensor, a rotational position of the carousel, and rotate, using the one or more actuators, the carousel based on the rotational position of the carousel.

BOLTER

A drilling and bolting rig for performing drilling and bolting operations. The drilling and bolting rig includes a magazine for storing a consumable, a feed supporting a drill head for movement relative to a work surface, and a loader configured to retrieve the consumable from the magazine and load the consumable into the drill head. The loader includes an arm operable to engage the consumable. The arm is supported for both rotational and translational movement.

Collaborative erosion-control method of releasing-splitting-supporting based on coal mass pressure relief and roof pre-splitting

A collaborative erosion-control method of releasing-splitting-supporting based on coal mass pressure relief and roof pre-splitting provided by the disclosure includes the following steps: step 1, driving into a coal seam to release pressure; step 2, low roof pre-splitting during driving process; step 3, supporting of roadway surrounding rock and support reinforcement; step 4, floor destressing of the roadway; step 5, high roof pre-splitting before mining; step 6, destressing and supporting of the advanced roadway surrounding rock during the mining process of the working face. The collaborative erosion-control method of releasing-splitting-supporting based on coal mass pressure relief and roof pre-splitting, and to carry out local pressure relief, roof pre-splitting and reinforcement support construction in the whole cycle of the coal working face in a progressive manner, so as to achieve the prevention and control of rock burst in the working face.

Collaborative erosion-control method of releasing-splitting-supporting based on coal mass pressure relief and roof pre-splitting

A collaborative erosion-control method of releasing-splitting-supporting based on coal mass pressure relief and roof pre-splitting provided by the disclosure includes the following steps: step 1, driving into a coal seam to release pressure; step 2, low roof pre-splitting during driving process; step 3, supporting of roadway surrounding rock and support reinforcement; step 4, floor destressing of the roadway; step 5, high roof pre-splitting before mining; step 6, destressing and supporting of the advanced roadway surrounding rock during the mining process of the working face. The collaborative erosion-control method of releasing-splitting-supporting based on coal mass pressure relief and roof pre-splitting, and to carry out local pressure relief, roof pre-splitting and reinforcement support construction in the whole cycle of the coal working face in a progressive manner, so as to achieve the prevention and control of rock burst in the working face.