E01B29/05

Railroad maintenance systems and methods

Systems and methods for using a mobile crane assembly are provided. The mobile crane assembly includes a mobile crane having a first truss assembly and a second truss assembly spaced apart and movable relative to one another. The first truss assembly and the second truss assembly are each coupled to a rail car end assembly. The mobile crane further comprises an upper gantry assembly movable along the first truss assembly and the second truss assembly. A flat cart is coupled to the rail car end assembly, and a material handling cart is received upon the flat cart and is configured to move between the flat cart and the rail car end assembly based upon input from a controller in electrical communication with the upper gantry assembly.

Railroad maintenance systems and methods

Systems and methods for using a mobile crane assembly are provided. The mobile crane assembly includes a mobile crane having a first truss assembly and a second truss assembly spaced apart and movable relative to one another. The first truss assembly and the second truss assembly are each coupled to a rail car end assembly. The mobile crane further comprises an upper gantry assembly movable along the first truss assembly and the second truss assembly. A flat cart is coupled to the rail car end assembly, and a material handling cart is received upon the flat cart and is configured to move between the flat cart and the rail car end assembly based upon input from a controller in electrical communication with the upper gantry assembly.

PROCESS AND SYSTEM FOR LAYING TRACKS FOR UNDERGROUND, RAILWAY AND TRAMWAY LINES
20240229364 · 2024-07-11 · ·

The present invention relates to a process and to a system for laying tracks for ballastless railway and tramway lines, both in tunnel and in surface.

PROCESS AND SYSTEM FOR LAYING TRACKS FOR UNDERGROUND, RAILWAY AND TRAMWAY LINES
20240229364 · 2024-07-11 · ·

The present invention relates to a process and to a system for laying tracks for ballastless railway and tramway lines, both in tunnel and in surface.

Devices and methods for laying sleepers on ballast-beds for railroad construction
12054889 · 2024-08-06 · ·

A device for laying sleepers on a ballast-bed for railroad construction includes a body having a commuting-mechanism and a fork-lift on a first side of the body The fork-lift lifts and holds at least one set of sleepers above the ballast-bed. A pair of pivot-arms are movably coupled the body and include a gripper. The gripper moves a set of sleepers from the fork-lift from the first side of the body towards a second side of the body. A cradle-arrangement mounted on the second side of the body and the commuting-mechanism allow movement of the device. The pair of elongated fixed support-members is configured to support the set of sleepers moved by the grippers The pair of movable support-members has a reciprocating-movement with respect to the pair of elongated fixed support-members to successively release one sleeper of the set of sleepers at a time from the pair of elongated fixed support-members.

Devices and methods for laying sleepers on ballast-beds for railroad construction
12054889 · 2024-08-06 · ·

A device for laying sleepers on a ballast-bed for railroad construction includes a body having a commuting-mechanism and a fork-lift on a first side of the body The fork-lift lifts and holds at least one set of sleepers above the ballast-bed. A pair of pivot-arms are movably coupled the body and include a gripper. The gripper moves a set of sleepers from the fork-lift from the first side of the body towards a second side of the body. A cradle-arrangement mounted on the second side of the body and the commuting-mechanism allow movement of the device. The pair of elongated fixed support-members is configured to support the set of sleepers moved by the grippers The pair of movable support-members has a reciprocating-movement with respect to the pair of elongated fixed support-members to successively release one sleeper of the set of sleepers at a time from the pair of elongated fixed support-members.

Transfer car for sleepers and the associated railway vehicle

The invention relates to a transfer car (100) for sleepers designed to outfit a railway vehicle of the type comprising equipment for laying down new sleepers (21) and/or removing worn sleepers (22), the transfer car (100) comprising an undercarriage (110) supported by at least one running gear (112), the transfer car (100) being characterized in that it comprises at least one traverser (50) supported by an armature (60), the armature (60) being supported by the undercarriage (110) and fixed in relation to the undercarriage (110), the traverser (50) being configured to move the sleepers from at least one receiving zone (Z1, Z2) to at least one conveying platform (P2).

Transfer car for sleepers and the associated railway vehicle

The invention relates to a transfer car (100) for sleepers designed to outfit a railway vehicle of the type comprising equipment for laying down new sleepers (21) and/or removing worn sleepers (22), the transfer car (100) comprising an undercarriage (110) supported by at least one running gear (112), the transfer car (100) being characterized in that it comprises at least one traverser (50) supported by an armature (60), the armature (60) being supported by the undercarriage (110) and fixed in relation to the undercarriage (110), the traverser (50) being configured to move the sleepers from at least one receiving zone (Z1, Z2) to at least one conveying platform (P2).

Rail tie distribution system

A system for distributing rail ties along the side of a track from a rail car and consist of the rail cars is disclosed. Each rail car includes a floor conveyor conveying rail ties to a singulating conveyor assembly which advances rail ties individually to a dealer having an indexing mechanism which selectively releases individual rail ties onto a discharge chute. The discharge chute is oriented so ties dropped on the discharge chute are discharged out a selected side of the rail car. A controller on each rail tie distribution car communicates with a computing resource which implements a plan for selectively discharging ties from cars selected by the computing resource to discharge ties at selected drop off locations.

Rail tie distribution system

A system for distributing rail ties along the side of a track from a rail car and consist of the rail cars is disclosed. Each rail car includes a floor conveyor conveying rail ties to a singulating conveyor assembly which advances rail ties individually to a dealer having an indexing mechanism which selectively releases individual rail ties onto a discharge chute. The discharge chute is oriented so ties dropped on the discharge chute are discharged out a selected side of the rail car. A controller on each rail tie distribution car communicates with a computing resource which implements a plan for selectively discharging ties from cars selected by the computing resource to discharge ties at selected drop off locations.