Patent classifications
E02B5/02
Constructive method and operational process for creation of artificial beaches, suitable for bathing, around plots of land
Constructive method and operational process for creation of artificial beaches, suitable for bathing, around plots of land, more precisely, constructive method and operational process for creation of artificial beaches, allowing implementation of watercourses forming isles and/or peninsulas, that contains lots of condominium and/or subdivision, with formation of artificial beaches in perimeter of lots composing condominium and/or subdivision, watercourses are appropriate for contemplation and bathing by condominium members and/or owners of subdivision.
Constructive method and operational process for creation of artificial beaches, suitable for bathing, around plots of land
Constructive method and operational process for creation of artificial beaches, suitable for bathing, around plots of land, more precisely, constructive method and operational process for creation of artificial beaches, allowing implementation of watercourses forming isles and/or peninsulas, that contains lots of condominium and/or subdivision, with formation of artificial beaches in perimeter of lots composing condominium and/or subdivision, watercourses are appropriate for contemplation and bathing by condominium members and/or owners of subdivision.
Cryogenic trench/trough apparatus and method
A method of installing a trench for containing a cryogenic spill, including the step of constructing multiple precast concrete sections at a first location, each section preferably having a bottom wall and spaced apart side walls connected to and extending up from the bottom wall. Each section preferably has end portions that enable connection to another said concrete section. The method includes (at the first location) preparing multiple panels of polymeric concrete material by filling one or more molds with a slurry or liquid polymeric concrete material and after time allowing the material to cure and harden. The mold can have a cavity that is lined with a release material. At the first location, one or more of the panels can be adhered to the bottom wall and side walls of each concrete section preferably using an adhesive. After adhering of the panels to the concrete sections, the concrete sections can be transported from the first location to a second location that is remote from the first location. At the second location, the concrete sections are connected together using connections that preferably join one end portion of a concrete section to and end portion of another concrete section. An epoxy grout is preferably field applied to the connections at the second location.
Cryogenic trench/trough apparatus and method
A method of installing a trench for containing a cryogenic spill, including the step of constructing multiple precast concrete sections at a first location, each section preferably having a bottom wall and spaced apart side walls connected to and extending up from the bottom wall. Each section preferably has end portions that enable connection to another said concrete section. The method includes (at the first location) preparing multiple panels of polymeric concrete material by filling one or more molds with a slurry or liquid polymeric concrete material and after time allowing the material to cure and harden. The mold can have a cavity that is lined with a release material. At the first location, one or more of the panels can be adhered to the bottom wall and side walls of each concrete section preferably using an adhesive. After adhering of the panels to the concrete sections, the concrete sections can be transported from the first location to a second location that is remote from the first location. At the second location, the concrete sections are connected together using connections that preferably join one end portion of a concrete section to and end portion of another concrete section. An epoxy grout is preferably field applied to the connections at the second location.
POND SEALING METHOD
A method of treating a pond, lake or other body of water to improve the retention of water includes treating the ground at the bed of the pond with bentonite clay, a super absorbent polymer, a polysaccharide, and a polymer flocculant. The bentonite clay can be granulated #16 Wyoming bentonite clay, the super absorbent polymer can be granulated polyacrylamide, the polysaccharide can be granulated carboxy methyl cellulose, and the polymer flocculant can be a high-performance polymer flocculant, such as 2-Propenoic Acid, polymer with 2-Promenamide, sodium salt 90-100%.
Method for regulating and controlling discharge flow of dammed lake
A method for regulating and controlling discharge flow of a dammed lake includes steps of: (S1) estimating a most dangerous discharge condition; (S2) based on the most dangerous discharge condition, calculating a structural internal force of the steel flexible net; (S3) based on the internal force of the steel flexible net, calculating an anti-slide embedded depth at two sides of the steel flexible net; (S4) based on the most dangerous discharge condition, manually excavating a channel; and (S5) based on the anti-slide embedded depth at the two sides of the steel flexible net, embedding the steel flexible net into a barrier dam. According to the present invention, the steel flexible net is laid on the upstream slope of the barrier dam, two sides of the steel flexible net is embedded into the slope body with gravels of the barrier dam, and cooperates with the channel for usage.
Method for regulating and controlling discharge flow of dammed lake
A method for regulating and controlling discharge flow of a dammed lake includes steps of: (S1) estimating a most dangerous discharge condition; (S2) based on the most dangerous discharge condition, calculating a structural internal force of the steel flexible net; (S3) based on the internal force of the steel flexible net, calculating an anti-slide embedded depth at two sides of the steel flexible net; (S4) based on the most dangerous discharge condition, manually excavating a channel; and (S5) based on the anti-slide embedded depth at the two sides of the steel flexible net, embedding the steel flexible net into a barrier dam. According to the present invention, the steel flexible net is laid on the upstream slope of the barrier dam, two sides of the steel flexible net is embedded into the slope body with gravels of the barrier dam, and cooperates with the channel for usage.
Method and device for the laying down of a geomembrane
A method and a device for laying down and sealingly anchoring a waterproofing liner of a synthetic material, on a surface of a hydraulic work, by a plurality of anchoring assemblies each including a lower and an upper metal sections configured with a raised part and side sloping walls, wherein the lower metal section bar has a set of anchoring holes at a plurality of axially spaced anchoring zones; the surface of the hydraulic work is marked with a set of reference marks at a plurality of fastening zones, corresponding to the set of anchoring holes of the lower section bar; each lower section bar is fastened to the hydraulic work by anchoring devices threaded into an anchoring hole of a respective anchoring zone of the lower section bar, and into a perforation of the hydraulic work provided at one of the set of reference marks at each fastening zone.
Method and device for the laying down of a geomembrane
A method and a device for laying down and sealingly anchoring a waterproofing liner of a synthetic material, on a surface of a hydraulic work, by a plurality of anchoring assemblies each including a lower and an upper metal sections configured with a raised part and side sloping walls, wherein the lower metal section bar has a set of anchoring holes at a plurality of axially spaced anchoring zones; the surface of the hydraulic work is marked with a set of reference marks at a plurality of fastening zones, corresponding to the set of anchoring holes of the lower section bar; each lower section bar is fastened to the hydraulic work by anchoring devices threaded into an anchoring hole of a respective anchoring zone of the lower section bar, and into a perforation of the hydraulic work provided at one of the set of reference marks at each fastening zone.
CONSTRUCTION METHOD AND OPERATIONAL PROCESS FOR THE IMPLEMENTATION OF A CONDOMINIUM AND/OR SUBDIVISION WITH THE CREATION OF ARTIFICIAL BEACHES FOR BATHING IN THE FORMAT OF ISLES AND/OR PENINSULAS AND/OR BAYS AND/OR LAKES AND/OR THE LIKE
A construction method and operational process for the implementation of a condominium and/or subdivision with the creation of artificial beaches for bathing in the format of isles and/or peninsulas and/or bays and/or lakes and/or the like is disclosed. More precisely, the construction method for the implementation of a condominium and/or lot subdivision, includes blocks (Q) of lots (L) in the format of an isle (I) and/or peninsula (P), allowing the implementation of watercourses (1) forming said isles (I) and/or peninsulas (P), that contains the lots (L) of the condominium, with the formation of artificial beaches (2) in the perimeter of said lots (L) composing said subdivision. The watercourses (1) are appropriate for contemplation and bathing by the condominium members, including the possibility of creating waves or ripples (18).