E02D5/74

Recyclable sand-consolidated anchor head prestressed anchor, anchorage jack and its application method

The invention discloses a retrievable sand consolidation anchor head prestressed anchor rod, an anchoring jack and an application method thereof, and belongs to the technical field of geotechnical engineering. The retrievable sand-consolidated anchor head pre-stressed anchor includes a bolt body 6, a rigid frame 5, a load member 1, a sand column 2, a pressure receiving member 4, a cut-off member 3, and an anchor pier 8. The anchoring jack includes a force transmitting frame 12, a first guiding plate 25, a second guiding plate 28, and a housing 13. The application method includes an anchoring method using the retrievable sand-consolidated anchor head prestressed anchor rod and a method of recovering the retrievable sand-consolidated anchor head pre-stressed anchor rod. After the anchoring of the reclaimed sand-consolidated anchor head pre-stressed anchor rod, the bolt body can be recovered and reused, and the operation is simpler and more environmentally friendly.

Extensible reaming self-anchoring anchor rod and supporting method thereof

Provided is a mounting method for an extensible reaming self-anchoring anchor rod, which is especially applicable to roadway construction in coal mines. A big helical structure is arranged on two rod sections of a sectional type anchor rod, a simple drill bit drills and reams a bore and cuts the coal mass in one operation, the outer diameter of the simple drill bit is smaller than the outer diameter of the big helical rod body, and the big helical structure accomplishes secondary reaming, self-drilling and self-anchoring in the drilling process; the big helical structure inhibits propagation and development of sheet cracks of the coal wall in the radial direction, and is embedded in the coal mass through a self-stabilization process of the rock mass.

GROUND MOUNTING ASSEMBLY
20200270834 · 2020-08-27 ·

A ground mounting assembly includes one or a plurality of posts, each attached to at least one stabilizing plate or scoop pyramid. The post may be driven into the ground and then lifted to deploy plates into a locking mechanism, or driven into the ground by a pile driver with plate held in place, released, and driven further and deployed into a locking mechanism, or driven into the ground and double pounded inside the post to drive reinforcing plate into slotted winglets, or driven, double pounded and rotated to extend the reinforcing plates horizontally from the pole or pile. The post also can used as a mooring in harbors, lakes, or at sea. A system based on a double pounder pile driven mono pole, optionally extendable in length, is also described.

GROUND MOUNTING ASSEMBLY
20200270834 · 2020-08-27 ·

A ground mounting assembly includes one or a plurality of posts, each attached to at least one stabilizing plate or scoop pyramid. The post may be driven into the ground and then lifted to deploy plates into a locking mechanism, or driven into the ground by a pile driver with plate held in place, released, and driven further and deployed into a locking mechanism, or driven into the ground and double pounded inside the post to drive reinforcing plate into slotted winglets, or driven, double pounded and rotated to extend the reinforcing plates horizontally from the pole or pile. The post also can used as a mooring in harbors, lakes, or at sea. A system based on a double pounder pile driven mono pole, optionally extendable in length, is also described.

EXTENSIBLE REAMING SELF-ANCHORING ANCHOR ROD AND SUPPORTING METHOD THEREOF
20200217201 · 2020-07-09 ·

Provided is a mounting method for an extensible reaming self-anchoring anchor rod, which is especially applicable to roadway construction in coal mines. A big helical structure is arranged on two rod sections of a sectional type anchor rod, a simple drill bit drills and reams a bore and cuts the coal mass in one operation, the outer diameter of the simple drill bit is smaller than the outer diameter of the big helical rod body, and the big helical structure accomplishes secondary reaming, self-drilling and self-anchoring in the drilling process; the big helical structure inhibits propagation and development of sheet cracks of the coal wall in the radial direction, and is embedded in the coal mass through a self-stabilization process of the rock mass.

Apparatuses for constructing displacement aggregate piers

Apparatuses for constructing displacement aggregate piers are disclosed. In one example, a mandrel is provided comprising a tamper head that has cutting teeth on the leading edge thereof. In another example, hydrojet nozzles are provided within one or more of the cutting teeth of the tamper head. In yet another example, the mandrel comprises grout tubes (or grout injection lines) and/or grout inspection lines. In yet another example, the mandrel and/or tamper head can comprise cutting teeth, hydrojet nozzles, grout tubes (or grout injection lines), grout inspection lines, and any combinations thereof.

RECYCLABLE SAND-CONSOLIDATED ANCHOR HEAD PRESTRESSED ANCHOR, ANCHORAGE JACK AND ITS APPLICATION METHOD

The invention discloses a retrievable sand consolidation anchor head prestressed anchor rod, an anchoring jack and an application method thereof, and belongs to the technical field of geotechnical engineering. The retrievable sand-consolidated anchor head pre-stressed anchor includes a bolt body 6, a rigid frame 5, a load member 1, a sand column 2, a pressure receiving member 4, a cut-off member 3, and an anchor pier 8. The anchoring jack includes a force transmitting frame 12, a first guiding plate 25, a second guiding plate 28, and a housing 13. The application method includes an anchoring method using the retrievable sand-consolidated anchor head prestressed anchor rod and a method of recovering the retrievable sand-consolidated anchor head pre-stressed anchor rod. After the anchoring of the reclaimed sand-consolidated anchor head pre-stressed anchor rod, the bolt body can be recovered and reused, and the operation is simpler and more environmentally friendly.

RECYCLABLE SAND-CONSOLIDATED ANCHOR HEAD PRESTRESSED ANCHOR, ANCHORAGE JACK AND ITS APPLICATION METHOD

The invention discloses a retrievable sand consolidation anchor head prestressed anchor rod, an anchoring jack and an application method thereof, and belongs to the technical field of geotechnical engineering. The retrievable sand-consolidated anchor head pre-stressed anchor includes a bolt body 6, a rigid frame 5, a load member 1, a sand column 2, a pressure receiving member 4, a cut-off member 3, and an anchor pier 8. The anchoring jack includes a force transmitting frame 12, a first guiding plate 25, a second guiding plate 28, and a housing 13. The application method includes an anchoring method using the retrievable sand-consolidated anchor head prestressed anchor rod and a method of recovering the retrievable sand-consolidated anchor head pre-stressed anchor rod. After the anchoring of the reclaimed sand-consolidated anchor head pre-stressed anchor rod, the bolt body can be recovered and reused, and the operation is simpler and more environmentally friendly.

Hot-melt anchor head

A hot-melt anchor head which belongs to technical field of fixed-foundation buildings. Hot-melt anchor head includes anchor ring provided with through hole, guide wire, electrical hot-melt member arranged on anchor ring, clamp piece arranged in through hole to clamp anchor cable reinforcement, and strain gauge connected to guide wire arranged on surface of anchor ring, wherein bottom of anchor ring is provided with bearing plate; which is provided with opening opposite to through hole, and anchor ring is made of metal material; and surface of anchor ring is formed with coating layer by injection moulding with hot-melt material, strain gauge is coated by coating layer and is in close contact with surface of anchor ring to be integrally formed, an end, close to bearing plate, of anchor ring extends inwards and is provided with flange, and flange is used for holding part, located inside through hole, of coating layer.

Hot-melt anchor head

A hot-melt anchor head which belongs to technical field of fixed-foundation buildings. Hot-melt anchor head includes anchor ring provided with through hole, guide wire, electrical hot-melt member arranged on anchor ring, clamp piece arranged in through hole to clamp anchor cable reinforcement, and strain gauge connected to guide wire arranged on surface of anchor ring, wherein bottom of anchor ring is provided with bearing plate; which is provided with opening opposite to through hole, and anchor ring is made of metal material; and surface of anchor ring is formed with coating layer by injection moulding with hot-melt material, strain gauge is coated by coating layer and is in close contact with surface of anchor ring to be integrally formed, an end, close to bearing plate, of anchor ring extends inwards and is provided with flange, and flange is used for holding part, located inside through hole, of coating layer.