E02D7/28

Removing submerged piles of offshore production platforms

Certain aspects of removing submerged piles of offshore production platforms can be implemented as methods. A top deck of a fixed offshore platform installed on a mudline of a body of water is removed. An upper structure of the fixed offshore platform is removed. The upper structure is below the top deck. A lower structure is secured to the mudline by one or more structural piles remaining. The one or more structural piles, which are housed within one or more members of the lower structure, are driven below the mudline. The lower structure of the fixe offshore platform is removed. The one or more structural piles are left below the mudline.

Removing submerged piles of offshore production platforms

Certain aspects of removing submerged piles of offshore production platforms can be implemented as methods. A top deck of a fixed offshore platform installed on a mudline of a body of water is removed. An upper structure of the fixed offshore platform is removed. The upper structure is below the top deck. A lower structure is secured to the mudline by one or more structural piles remaining. The one or more structural piles, which are housed within one or more members of the lower structure, are driven below the mudline. The lower structure of the fixe offshore platform is removed. The one or more structural piles are left below the mudline.

EXTENSIBLE SHELLS AND RELATED METHODS FOR CONSTRUCTING A DUCTILE SUPPORT PIER

Extensible shells and related methods for constructing a support pier are disclosed. An extensible shell can define an interior for holding granular construction material and define a first opening at a first end for receiving the granular construction material into the interior and a second opening at a second end. The extensible shell can be flexible such that the shell expands when granular construction material is compacted in the interior of the shell. A method may include positioning the extensible shell in the ground and filling at least a portion of the interior of the shell with the granular construction material. The granular construction material may be compacted in the interior of the extensible shell to form a support pier.

EXTENSIBLE SHELLS AND RELATED METHODS FOR CONSTRUCTING A DUCTILE SUPPORT PIER

Extensible shells and related methods for constructing a support pier are disclosed. An extensible shell can define an interior for holding granular construction material and define a first opening at a first end for receiving the granular construction material into the interior and a second opening at a second end. The extensible shell can be flexible such that the shell expands when granular construction material is compacted in the interior of the shell. A method may include positioning the extensible shell in the ground and filling at least a portion of the interior of the shell with the granular construction material. The granular construction material may be compacted in the interior of the extensible shell to form a support pier.

Foundation pile installation device

A foundation pile end piece is provided that includes a ring-shape connection housing, where a proximal end of the ring-shape connection housing is configured to secure to a bottom end of a foundation pile, a moveable tip, where a distal end of the ring-shape connection housing is configured to fixedly hold the moveable tip, where the moveable tip is disposed to oscillate transversely with respect to a central axis of the ring-shape connection housing, where the moveable tip is configured to displace soil from the bottom end of the foundation pile according to actuation of the oscillation.

Foundation pile installation device

A foundation pile end piece is provided that includes a ring-shape connection housing, where a proximal end of the ring-shape connection housing is configured to secure to a bottom end of a foundation pile, a moveable tip, where a distal end of the ring-shape connection housing is configured to fixedly hold the moveable tip, where the moveable tip is disposed to oscillate transversely with respect to a central axis of the ring-shape connection housing, where the moveable tip is configured to displace soil from the bottom end of the foundation pile according to actuation of the oscillation.

Open-end extensible shells and related methods for constructing a support pier
10513831 · 2019-12-24 · ·

Extensible shells and related methods for constructing a support pier are disclosed. An extensible shell can define an interior for holding granular construction material and define a first opening at a first end for receiving the granular construction material into the interior and a second opening at a second end. The extensible shell can be flexible such that the shell expands when granular construction material is compacted in the interior of the shell. A method may include positioning the extensible shell in the ground and filling at least a portion of the interior of the shell with the granular construction material. The granular construction material may be compacted in the interior of the extensible shell to form a support pier.

Open-end extensible shells and related methods for constructing a support pier
10513831 · 2019-12-24 · ·

Extensible shells and related methods for constructing a support pier are disclosed. An extensible shell can define an interior for holding granular construction material and define a first opening at a first end for receiving the granular construction material into the interior and a second opening at a second end. The extensible shell can be flexible such that the shell expands when granular construction material is compacted in the interior of the shell. A method may include positioning the extensible shell in the ground and filling at least a portion of the interior of the shell with the granular construction material. The granular construction material may be compacted in the interior of the extensible shell to form a support pier.

HANDLING DEVICE AND METHOD FOR GRIPPING AND INSERTING A PILE TUBE INTO A BOREHOLE
20240093455 · 2024-03-21 · ·

The invention relates to a handling device for gripping and inserting a pile tube into a borehole in the ground to form a foundation pile, comprising a base frame, a gripping device for gripping and holding the pile tube, and a holding element for releasably connecting the base frame to a hoist, in particular a suspension rope. According to the invention, it is provided that at least one inlet device for supplying a curable medium is arranged on the base frame in an upper region and at least one outlet device for the curable medium to the pile tube is arranged in a lower region.

HANDLING DEVICE AND METHOD FOR GRIPPING AND INSERTING A PILE TUBE INTO A BOREHOLE
20240093455 · 2024-03-21 · ·

The invention relates to a handling device for gripping and inserting a pile tube into a borehole in the ground to form a foundation pile, comprising a base frame, a gripping device for gripping and holding the pile tube, and a holding element for releasably connecting the base frame to a hoist, in particular a suspension rope. According to the invention, it is provided that at least one inlet device for supplying a curable medium is arranged on the base frame in an upper region and at least one outlet device for the curable medium to the pile tube is arranged in a lower region.