Patent classifications
E02D15/08
SUBSEA FOUNDATION
A method of connecting a lower pipe portion to a subsea foundation is provided. The method comprises: providing the subsea foundation, wherein the subsea foundation comprises an upper pipe portion connected to the subsea foundation, deploying the subsea foundation subsea; and connecting the lower pipe portion to the upper pipe portion. A subsea foundation system is also provided. The subsea foundation system comprises: a subsea foundation; an upper pipe portion connected to the subsea foundation, and a lower pipe portion, wherein the subsea foundation system is arranged such that subsea the lower pipe portion can be connected to the upper pipe portion. The lower pipe portion may be connected to the subsea foundation in a stowed position before deployment subsea. The lower pipe portion may be connected to a pull-in arrangement before deployment subsea. The subsea foundation may comprise a pipe overlap section that is arranged to overlap a portion of the upper pipe portion and/or the lower pipe portion when the lower pipe portion is connected to the upper pipe portion.
Method for installing a tubular metal pile in rocky soil
The invention concerns a method for installing a tubular metal pile (28) in a rocky ground, successively comprising drilling the rocky ground (6) in order to form a cavity (14) of predetermined diameter and depth, filling the cavity with a granular material (18), arranging the granular material present in the cavity by vibration, and installing the pile in the cavity.
Method for installing a tubular metal pile in rocky soil
The invention concerns a method for installing a tubular metal pile (28) in a rocky ground, successively comprising drilling the rocky ground (6) in order to form a cavity (14) of predetermined diameter and depth, filling the cavity with a granular material (18), arranging the granular material present in the cavity by vibration, and installing the pile in the cavity.
SYSTEM FOR TEMPORARILY HOLDING, DURING PILING OPERATIONS, A FOUNDATION PILE INTENDED TO RECEIVE THE MAST OF AN OFF-SHORE WIND TURBINE
Disclosed is a system for the temporary holding, during pile driving operations, of a foundation pile intended to receive the mast of an offshore wind turbine. The temporary holding system includes a sleeve intended to receive a section of the foundation pile and a support frame intended to be secured to a floating device. The support frame includes a slide and an actuator, arranged to generate displacements of the sleeve according to the two translational degrees of freedom. The slide includes at least one rolling element including a cylindrical roller.
Subsea Foundations
A method of constructing a sliding subset foundation comprises embedding at least one mass of rocks in seabed soil and placing a sliding mudmat on the seabed over the or each mass of rocks. The rocks may be lowered into a cavity in the seabed by dumping the rocks into the cavity or when contained within a gabion that is inserted into the cavity. Alternatively, a gabion containing the rocks may penetrate the seabed soil, driven by self-weight or additionally by a deadweight bearing on the gabion. The gabion may be lowered toward tie seabed suspended from the deadweight. The deadweight may be removed and recovered after the gabion has been embedded in the seabed. The mass of rocks are embedded within an area of excursion of the mudmat to ensure that the mudmat will be directly above the mass of rocks at any position within the area of excursion.
DEVICES AND METHODS FOR INSTALLING PILES INTO THE GROUND OR SEABED
The present invention relates to a support structure for supporting a top structure, in particular a wind turbine, above the ground or a seabed, the support structure comprising: one single support pile having a length and a first outer diameter, the one single support pile comprising an upper part configured and intended to extend above the ground or the seabed, wherein the upper part of the support pile is configured to be connected to the top structure; a lower part configured to be in contact with the ground or seabed, wherein the support pile is configured to exert an upward vertical force on the top structure in order to carry the top structure; a plurality of foundation guides connected to the lower part of the single support pile, each foundation guide having an opening extending in a direction of the support pile.
DEVICES AND METHODS FOR INSTALLING PILES INTO THE GROUND OR SEABED
The present invention relates to a support structure for supporting a top structure, in particular a wind turbine, above the ground or a seabed, the support structure comprising: one single support pile having a length and a first outer diameter, the one single support pile comprising an upper part configured and intended to extend above the ground or the seabed, wherein the upper part of the support pile is configured to be connected to the top structure; a lower part configured to be in contact with the ground or seabed, wherein the support pile is configured to exert an upward vertical force on the top structure in order to carry the top structure; a plurality of foundation guides connected to the lower part of the single support pile, each foundation guide having an opening extending in a direction of the support pile.
Modular mechanical arm for adaptive cleaning and damage detection of underwater pile foundation
A modular mechanical arm of an underwater pile foundation structure includes a modular interface disposed at one end of the transmission arm rod, a mechanical arm connecting part disposed at the other end of the transmission arm rod. The mechanical arm connecting part is separately provided with two arm frames, each of the arm frames comprises an inner arm frame and an outer arm frame, the inner arm frame and the outer arm frame are coupled by a joint, and a soft moving and cleaning part is disposed on an inner side of each of the arm frames; the modular interface is coupled with an underwater UAV interface to transmit current and a control signal, a waterproof steering gear is built in the transmission arm rod to receive the control signal.
METHOD OF CONSTRUCTING UNDERWATER CONCRETE BLOCK STRUCTURE
Disclosed is a method of constructing an underwater concrete block structure, including: fabricating a plurality of concrete blocks having a vertical hole extending in the vertical direction; forming a foundation concrete block structure by installing the concrete block on the seafloor; vertically installing at least one guide pole in the foundation concrete block structure; forming a concrete block stack by repeating a process of positioning the concrete block to be installed above the surface of the water; and forming a main concrete column for binding the plurality of concrete blocks.
METHOD OF CONSTRUCTING UNDERWATER CONCRETE BLOCK STRUCTURE
Disclosed is a method of constructing an underwater concrete block structure, including: fabricating a plurality of concrete blocks having a vertical hole extending in the vertical direction; forming a foundation concrete block structure by installing the concrete block on the seafloor; vertically installing at least one guide pole in the foundation concrete block structure; forming a concrete block stack by repeating a process of positioning the concrete block to be installed above the surface of the water; and forming a main concrete column for binding the plurality of concrete blocks.