E02D23/08
Concrete block construction method and guide member for installing concrete block
A concrete block construction method, including: manufacturing a plurality of concrete blocks each having a vertical guide hole formed in a vertical direction; preparing a guide member for installing the concrete blocks; forming a lower concrete block structure by installing at least one of the concrete blocks; placing the concrete block subject to be installed on the lower concrete block structure by inserting the installation guide pole into the vertical guide hole of the concrete block subject to be installed; and separating and recovering the guide member for installing the concrete block from the concrete block subject to be installed, after placing the concrete block subject to be installed.
Concrete block construction method and guide member for installing concrete block
A concrete block construction method, including: manufacturing a plurality of concrete blocks each having a vertical guide hole formed in a vertical direction; preparing a guide member for installing the concrete blocks; forming a lower concrete block structure by installing at least one of the concrete blocks; placing the concrete block subject to be installed on the lower concrete block structure by inserting the installation guide pole into the vertical guide hole of the concrete block subject to be installed; and separating and recovering the guide member for installing the concrete block from the concrete block subject to be installed, after placing the concrete block subject to be installed.
CAISSON BLOCK CONSTRUCTION METHOD AND CAISSON BLOCK STRUCTURE
A caisson block construction method, including: manufacturing a plurality of bottom caisson blocks having a plurality of first unit compartments disposed consecutively in a horizontal direction; manufacturing a plurality of upper caisson blocks having a plurality of second unit compartments; forming a bottom caisson block structure by installing the plurality of bottom caisson blocks side by side in the horizontal direction; installing the plurality of upper caisson blocks above the W installed bottom caisson blocks; filling with rubble the second unit compartment of the upper caisson block positioned above the first unit compartment for rubble and exposed upward; inserting a vertical reinforcing bar module after the upper caisson blocks are installed; and forming a vertical concrete column for joining by casting concrete into the upper part of the second unit compartment in which the vertical reinforcing bar module is inserted.
CAISSON BLOCK CONSTRUCTION METHOD AND CAISSON BLOCK STRUCTURE
A caisson block construction method, including: manufacturing a plurality of bottom caisson blocks having a plurality of first unit compartments disposed consecutively in a horizontal direction; manufacturing a plurality of upper caisson blocks having a plurality of second unit compartments; forming a bottom caisson block structure by installing the plurality of bottom caisson blocks side by side in the horizontal direction; installing the plurality of upper caisson blocks above the W installed bottom caisson blocks; filling with rubble the second unit compartment of the upper caisson block positioned above the first unit compartment for rubble and exposed upward; inserting a vertical reinforcing bar module after the upper caisson blocks are installed; and forming a vertical concrete column for joining by casting concrete into the upper part of the second unit compartment in which the vertical reinforcing bar module is inserted.
CONCRETE BLOCK CONSTRUCTION METHOD AND GUIDE MEMBER FOR INSTALLING CONCRETE BLOCK
A concrete block construction method, including: manufacturing a plurality of concrete blocks each having a vertical guide hole formed in a vertical direction; preparing a guide member for installing the concrete blocks; forming a lower concrete block structure by installing at least one of the concrete blocks; placing the concrete block subject to be installed on the lower concrete block structure by inserting the installation guide pole into the vertical guide hole of the concrete block subject to be installed; and separating and recovering the guide member for installing the concrete block from the concrete block subject to be installed, after placing the concrete block subject to be installed.
CONCRETE BLOCK CONSTRUCTION METHOD AND GUIDE MEMBER FOR INSTALLING CONCRETE BLOCK
A concrete block construction method, including: manufacturing a plurality of concrete blocks each having a vertical guide hole formed in a vertical direction; preparing a guide member for installing the concrete blocks; forming a lower concrete block structure by installing at least one of the concrete blocks; placing the concrete block subject to be installed on the lower concrete block structure by inserting the installation guide pole into the vertical guide hole of the concrete block subject to be installed; and separating and recovering the guide member for installing the concrete block from the concrete block subject to be installed, after placing the concrete block subject to be installed.
Method of forming a mudline cellar for offshore arctic drilling
A method of forming a mudline cellar includes positioning a mudline cellar forming member on a seafloor surface. The mudline cellar forming member includes an outer surface and an inner surface that defines an inner cavity. The method further includes driving the mudline cellar forming member into the seafloor surface, and excavating the inner cavity of the mudline forming member to establish the mudline cellar.
Method of forming a mudline cellar for offshore arctic drilling
A method of forming a mudline cellar includes positioning a mudline cellar forming member on a seafloor surface. The mudline cellar forming member includes an outer surface and an inner surface that defines an inner cavity. The method further includes driving the mudline cellar forming member into the seafloor surface, and excavating the inner cavity of the mudline forming member to establish the mudline cellar.
Multi-vessel process to install and recover subsea equipment packages
According to one or more embodiments disclosed herein is a method of transporting equipment between sea-surface and seafloor by providing a structure with a subsea equipment package mounted thereon. The structure is used for installation and recovery in a subsea environment by changing the buoyancy of the structure or ballasting the structure to effect a controlled sinking motion.
Multi-vessel process to install and recover subsea equipment packages
According to one or more embodiments disclosed herein is a method of transporting equipment between sea-surface and seafloor by providing a structure with a subsea equipment package mounted thereon. The structure is used for installation and recovery in a subsea environment by changing the buoyancy of the structure or ballasting the structure to effect a controlled sinking motion.