Patent classifications
E02D27/28
Foundation with pedestal and ribs for towers
A wind turbine foundation comprising a concrete support slab having a horizontal rebar grid therein, a concrete pedestal integral with the support slab and having vertical post tensioning elements therein and a plurality of concrete ribs on top of and integral with the support slab and integral with the pedestal, the ribs having rebar therein and extend outwardly from the pedestal, the pedestal, slab and ribs are connected to each other to form a monolithic foundation. The foundation design reduces the weight and volume of materials used, reduces cost, and improves heat dissipation conditions during construction by having a small ratio of concrete mass to surface area thus eliminating the risk of thermal cracking due to heat of hydration.
Foundation with pedestal and ribs for towers
A wind turbine foundation comprising a concrete support slab having a horizontal rebar grid therein, a concrete pedestal integral with the support slab and having vertical post tensioning elements therein and a plurality of concrete ribs on top of and integral with the support slab and integral with the pedestal, the ribs having rebar therein and extend outwardly from the pedestal, the pedestal, slab and ribs are connected to each other to form a monolithic foundation. The foundation design reduces the weight and volume of materials used, reduces cost, and improves heat dissipation conditions during construction by having a small ratio of concrete mass to surface area thus eliminating the risk of thermal cracking due to heat of hydration.
Foundation with pedestal and ribs for towers
A wind turbine foundation comprising a concrete support slab having a horizontal rebar grid therein, a concrete pedestal integral with the support slab and having vertical post tensioning elements therein and a plurality of concrete ribs on top of and integral with the support slab and integral with the pedestal, the ribs having rebar therein and extend outwardly from the pedestal, the pedestal, slab and ribs are connected to each other to form a monolithic foundation. The foundation design reduces the weight and volume of materials used, reduces cost, and improves heat dissipation conditions during construction by having a small ratio of concrete mass to surface area thus eliminating the risk of thermal cracking due to heat of hydration.
Foundation with pedestal and ribs for towers
A wind turbine foundation comprising a concrete support slab having a horizontal rebar grid therein, a concrete pedestal integral with the support slab and having vertical post tensioning elements therein and a plurality of concrete ribs on top of and integral with the support slab and integral with the pedestal, the ribs having rebar therein and extend outwardly from the pedestal, the pedestal, slab and ribs are connected to each other to form a monolithic foundation. The foundation design reduces the weight and volume of materials used, reduces cost, and improves heat dissipation conditions during construction by having a small ratio of concrete mass to surface area thus eliminating the risk of thermal cracking due to heat of hydration.
Foundation with pedestal and ribs for towers
A fatigue resistant gravity based spread footing under heavy multi-axial cyclical loading of a wind tower. The foundation having a central vertical pedestal, a substantially horizontal continuous bottom support slab, a plurality of radial reinforcing ribs extending radially outward from the pedestal. The pedestal, ribs and slab forming a continuous monolithic structure. The foundation may have a three-dimensional network of post-tensioning elements that keep the structural elements under heavy multi-axial post compression with a specific eccentricity intended to reduce stress amplitudes and deflections and allows the foundation to have a desirable combination of high stiffness and superior fatigue resistance. The foundation design reduces the weight and volume of materials used, reduces cost, and improves heat dissipation conditions during construction by having a small ratio of concrete mass to surface area thus eliminating the risk of thermal cracking due to heat of hydration.
Foundation with pedestal and ribs for towers
A fatigue resistant gravity based spread footing under heavy multi-axial cyclical loading of a wind tower. The foundation having a central vertical pedestal, a substantially horizontal continuous bottom support slab, a plurality of radial reinforcing ribs extending radially outward from the pedestal. The pedestal, ribs and slab forming a continuous monolithic structure. The foundation may have a three-dimensional network of post-tensioning elements that keep the structural elements under heavy multi-axial post compression with a specific eccentricity intended to reduce stress amplitudes and deflections and allows the foundation to have a desirable combination of high stiffness and superior fatigue resistance. The foundation design reduces the weight and volume of materials used, reduces cost, and improves heat dissipation conditions during construction by having a small ratio of concrete mass to surface area thus eliminating the risk of thermal cracking due to heat of hydration.
METHOD FOR PRODUCING A COMPONENT FREE OF TOE PRESSURE
The invention relates to a method for producing a component, such as a structural member, free of toe pressure, including the steps of: introducing a soluble material into soil and introducing a component into the soil on the soluble material.
METHOD FOR PRODUCING A COMPONENT FREE OF TOE PRESSURE
The invention relates to a method for producing a component, such as a structural member, free of toe pressure, including the steps of: introducing a soluble material into soil and introducing a component into the soil on the soluble material.
Foundation structure for building, and construction method therefor
A building foundation structure includes a ground improved body obtained by improving a surface layer ground, and foundation concrete placed on the ground improved body. A bottom surface of a foundation concrete located below a building pillar has a four-or-more-sided polygonal shape smaller than the plan shape of the foundation concrete, and a part of the lower surface of the foundation concrete other than the bottom surface is a slope surface connecting the bottom surface and the plan shape. Since the stress from the foundation is transferred to the lower ground in its broader range, the stress transferred to the lower ground can be reduced. In addition, since the placing amount of the foundation concrete is reduced, the construction cost can be reduced.
Preloading apparatus for adjusting load and method of reinforcing foundation using the same
The present invention relates to a preloading apparatus and a method of reinforcing a foundation using the same, wherein, in a preloading method used for remodeling construction in which an extension of a building, such as an apartment, is required, the preloading apparatus allows adjustment of a preloading load, such as addition of a preloading load, to be performed when loss of the preloading load occurs and allows the new pile to effectively share a load applied before and after an extension of a building so that reinforcement efficiency is increased, and thus a load is adjustable economically.