E02D29/045

Underground facility and method of constructing underground facility
12480274 · 2025-11-25 ·

Disclosed herein are a construction structure and method for an underground facility. The construction structure for an underground facility includes: a facility body including a foundation constructed by pouring concrete, and a cover member extending in the front-back direction and having both ends configured to extend downward and be fixed to the top surface of the foundation to form a tunnel-shaped space therebelow; and a soil cover layer formed to cover the facility body with soil. The construction method for an underground facility includes: forming a pit in the ground; constructing a foundation on the bottom surface of the pit; constructing a cover member to cover the top of the foundation; and constructing a soil cover layer by covering the pit with soil to cover the cover member.

Underground facility and method of constructing underground facility
12480274 · 2025-11-25 ·

Disclosed herein are a construction structure and method for an underground facility. The construction structure for an underground facility includes: a facility body including a foundation constructed by pouring concrete, and a cover member extending in the front-back direction and having both ends configured to extend downward and be fixed to the top surface of the foundation to form a tunnel-shaped space therebelow; and a soil cover layer formed to cover the facility body with soil. The construction method for an underground facility includes: forming a pit in the ground; constructing a foundation on the bottom surface of the pit; constructing a cover member to cover the top of the foundation; and constructing a soil cover layer by covering the pit with soil to cover the cover member.