Patent classifications
E02D2300/0001
Method and Device for Pre-Casting Conduit Holes in Building Foundations
A method of constructing multiple conduits in building foundations that eliminates the process of core drilling after the foundation has been poured and set. This method creates optional openings for possible future connections. The process uses removable conduit molds installed before the foundation is poured. Once the foundation has set, conduit molds are removed to explose conduits in the foundation as needed.
Method and device for pre-casting conduit holes in building foundations
A method of constructing multiple conduits in building foundations that eliminates the process of core drilling after the foundation has been poured and set. This method creates optional openings for possible future connections. The process uses removable conduit molds installed before the foundation is poured. Once the foundation has set, conduit molds are removed to explose conduits in the foundation as needed.
Method of maintaining soil strength and stability
A method of maintaining soil strength and stability involves positioning a sheet of soil stabilization and strengthening material on a selected area where the strengthening and stabilization of the soil is desired. The sheet of soil stabilization and strengthening material includes a fabric layer that forms a base of the soil stabilization and strengthening material. The lower surface of the fabric layer is positioned against and engages the selected area. A moisture impervious layer is coupled to the upper surface of the fabric layer. A particulate aggregate material is embedded in the moisture impervious layer.
SLOT LOCK CRIBBING BLOCK
In one or more arrangements, a stackable pad system is provided. The system has a plurality of blocks with each block having a flat upper surface with an upward extending lip positioned at opposing ends of the flat upper surface. Each block has a flat lower surface with a downward extending lip positioned at opposing ends of the flat lower surface. In some arrangements, the system includes a bottom locking plate and a top locking plate. When placed together, in a stacked arrangement, wherein a bottom most pair of blocks are stacked on top of the bottom locking plate with bottom lips fitting within the recesses of the bottom locking plate, additional pairs of blocks are stacked on the first pair of blocks and the top locking plate placed on the top most pair blocks, the blocks are all locked together and resist shifting and movement.
COATING FILM FOR STRUCTURE, SET OF COATING MATERIALS FOR FORMING COATING FILM, COATING MATERIAL FOR UNDERCOAT LAYER, AND COATING METHOD
A coating film capable of being peeled off in the shape of sheet to facilitate a coating film removal work, and is less likely to peel even after long periods of use on an underwater structure is provided. The coating film comprises an undercoat layer to be bonded to an underwater structure, and an antifouling layer bonded to the undercoat layer, wherein: a 100-gram underwater constant load peeling degree of the coating film is less than 5; a ratio of a tensile breaking strength of the coating film to an adhesive force of the coating film with respect to the underwater structure, as measured after immersing the coating film in pure water at 60° C. for 5 weeks is 1.5 or more; and a 1-mm square cross-cut stretching-caused peeling degree of the antifouling layer with respect to the undercoat layer is 0.05 or less.
Offshore structure
An offshore structure having a foundation structure, wherein the foundation structure has at least a first and a second profile, the first profile is designed as a pile and the second profile is designed as a pile sleeve, the second profile encloses the first profile over a penetration length, wherein an interspace is formed between the first and the second profile, the interspace has a casting compound filling over the total penetration length, shear elements are provided on the first and/or the second profile, the shear elements extend into the interspace and effect an axial load dissipation into the casting compound filling, the shear elements are provided only over a first partial length of the penetration length, the first partial length is between 65 and 90% of the total penetration length and a second partial length is free of shear elements, wherein the second partial length forms the upper length of the penetration length in the installed position.
GROUT PLUG SYSTEMS AND METHODS FOR PLACING PILES
A grout plug assembly for use in forming a pipe pile system defining at least one pile assembly inner surface portion comprises a resiliently deformable plug body and a substantially rigid plug cap. The resiliently deformable plug body defining a plug outer surface, a plug inner surface, a first plug end surface, a second plug end surface, where the plug inner surface defines a plug passageway. The substantially rigid plug cap defines a cap outer surface, a cap inner surface, a first cap end surface, and a second cap end surface. The second cap end surface is rigidly secured to the first plug end surface. The plug outer surface is sized and dimensioned to engage the at least one pile assembly inner surface portion of the pipe pile system during formation of the pipe pile system
Floating manhole cover assembly
A manhole cover assembly comprises a base frame, the base frame comprising a base body and a base flange extending laterally outward from the base body. The assembly further comprises a top frame, the top frame comprising a top body disposed annularly about at least a portion of the base body, a top flange extending laterally outward from the top body, and a lip extending laterally inward from the top body.
Method and Device for Pre-Casting Conduit Holes in Building Foundations
A method of constructing multiple conduits in building foundations that eliminates the process of core drilling after the foundation has been poured and set. This method creates optional openings for possible future connections. The process uses removable conduit molds installed before the foundation is poured. Once the foundation has set, conduit molds are removed to explose conduits in the foundation as needed.
Blindside waterproofed building foundation system and method of forming same
A blindside waterproofed building foundation system and method of forming the same are provided. The system includes a lagging wall, a monolithic waterproof layer adjacent to the lagging wall, and a foundation layer adjacent to the monolithic waterproof layer. The system and method provide a monolithic waterproofing layer that can remain adhered to a foundation surface even if the materials used to construct the lagging wall deteriorates, decomposes, or moves over time.