E02D2300/0079

BLINDSIDE WATERPROOFED BUILDING FOUNDATION SYSTEM AND METHOD OF FORMING SAME
20200199840 · 2020-06-25 ·

A blindside waterproofed building foundation system and method of forming the same are provided. The system includes a lagging wall, a monolithic waterproof layer adjacent to the lagging wall, and a foundation layer adjacent to the monolithic waterproof layer. The system and method provide a monolithic waterproofing layer that can remain adhered to a foundation surface even if the materials used to construct the lagging wall deteriorates, decomposes, or moves over time.

Systems and methods for making compacted aggregate piers in a soil matrix
10640945 · 2020-05-05 ·

The present invention discloses a system and method for forming a compacted aggregate pier at a target location. The system comprises a mandrel, which is a composition of a casing pipe and an inner steel shaft with close ended cone and convenient entry and exit of the inner shaft. The system further comprises a casing is equipped with water jet system, a rammer of mandrel attached to hydraulic hammer and an inner mandrel with a casing pipe having two valves with open and close capability. Using this system, the matrix soil radial density and the bearing capacity and the modulus of the reaction of the composite soil are increased and soil settlement decreases. This system also increases the density of loose soils or soils with dense sandy intermediate layers especially in shores and rivers in submerged conditions. Also, the loose granular soil is retrofitted against liquefaction.

EXTENSIBLE SHELLS AND RELATED METHODS FOR CONSTRUCTING A DUCTILE SUPPORT PIER

Extensible shells and related methods for constructing a support pier are disclosed. An extensible shell can define an interior for holding granular construction material and define a first opening at a first end for receiving the granular construction material into the interior and a second opening at a second end. The extensible shell can be flexible such that the shell expands when granular construction material is compacted in the interior of the shell. A method may include positioning the extensible shell in the ground and filling at least a portion of the interior of the shell with the granular construction material. The granular construction material may be compacted in the interior of the extensible shell to form a support pier.

Methods and systems for landfill thermal insulation

Systems and methods are disclosed for landfill systems, comprising waste, a geosynthetic product, and a layer of foam glass aggregates interposed between the waste and the geosynthetic product.

Berm or levee expansion system and method
10538889 · 2020-01-21 ·

A system and method to create or elevate a berm of a liquid retention facility by placement of lightweight fill material anchored by impervious liner material(s). The liner materials can be part of the liquid retention pond. The system and method can also be used to elevate the height of the berm in combination with impervious liner retention material. By constructing the berm system on an existing berm, earth embankment or levee, the effective height of the system structure can be increased. The liquid impervious liner material provides a watertight surface, joining media, and the anchoring of the lightweight fill material to the existing berm. The system may use solid wall hollow body structures. The system may also use flexible and liquid porous geotextile structures including geotubes. The liquid impervious liners retain the liquid in the retention pond.

Caisson block construction method and caisson block structure
10533297 · 2020-01-14 · ·

A caisson block construction method, including: manufacturing a plurality of bottom caisson blocks having a plurality of first unit compartments disposed consecutively in a horizontal direction; manufacturing a plurality of upper caisson blocks having a plurality of second unit compartments; forming a bottom caisson block structure by installing the plurality of bottom caisson blocks side by side in the horizontal direction; installing the plurality of upper caisson blocks above the installed bottom caisson blocks; filling with rubble the second unit compartment of the upper caisson block positioned above the first unit compartment for rubble and exposed upward; inserting a vertical reinforcing bar module after the upper caisson blocks are installed; and forming a vertical concrete column for joining by casting concrete into the upper part of the second unit compartment in which the vertical reinforcing bar module is inserted.

Open-end extensible shells and related methods for constructing a support pier
10513831 · 2019-12-24 · ·

Extensible shells and related methods for constructing a support pier are disclosed. An extensible shell can define an interior for holding granular construction material and define a first opening at a first end for receiving the granular construction material into the interior and a second opening at a second end. The extensible shell can be flexible such that the shell expands when granular construction material is compacted in the interior of the shell. A method may include positioning the extensible shell in the ground and filling at least a portion of the interior of the shell with the granular construction material. The granular construction material may be compacted in the interior of the extensible shell to form a support pier.

EROSION CONTROL APPARATUS
20190376248 · 2019-12-12 ·

The present invention relates to an erosion control apparatus and methods of using and installing the apparatus. The apparatus is constructed to prevent erosion of soil during typical weather or tidal conditions and adverse weather events. The apparatus can include a plurality of anchored rolls and soil lifts operative to stabilize the shoreline.

Ground Stabilization Grid
20190345685 · 2019-11-14 ·

A ground stabilization grid which includes a series of polygonal shaped cells having x sides. The cells are formed by polymer walls having a wall height of between about 1 and about 6. Each cell shares a common wall section with at least two adjacent cells; and a majority of cells within the grid includes at least two reinforcing ribs extending across the cell to engage opposing walls of the cell. The reinforcing ribs are characterized by (i) engaging the cell walls between about 25% and about 75% of the wall height, and (ii) extending between different opposing walls of the cell.

METHOD FOR REINFORCING SOFT GROUND BY POST-GROUTING COMBINED WITH AIR-BOOSTED VACUUM PRELOADING

A method for reinforcing soft ground by post-grouting combined with pressurized vacuum preloading is proposed, by pre-burying prefabricated vertical drains and air-boosted pipes in granular material piles, and the air-boosted pipes are used as grouting pipes to reduce the number of times of piling, which not only improves the construction efficiency, but also reduces the structural disturbance of the soil and the influence of smear effect, thus reducing the impact on the radial permeability and the radial consolidation coefficients. The method does not use geotextile bags for granular materials, which can avoid the problem of forming a localized clogging area around the geotextile bags, and the method not only improves the efficiency of vacuum transfer in a pre-consolidation stage, but also improves the grouting effect in the later stage, effectively enhances the strength of soft soil and makes granular material piles and the surrounding soil form composite ground.