E21B7/001

Diaphragm wall down-the-hole hammer trenching machine and use method thereof
11982157 · 2024-05-14 · ·

A diaphragm wall down-the-hole hammer trenching machine comprises a crane, a guide frame, a push-pull device, cluster down-the-hole hammers, gas collecting hoods, a high-pressure medium pipe or cable, and a slurry discharge pipe. The crane suspends the guide frame; the cluster down-the-hole hammers are connected to the bottom of the guide frame by means of the push-pull device; each cluster down-the-hole hammer comprises a primary hammer and secondary hammers; the plurality of secondary hammers are provided on each primary hammer; one gas collecting hood is provided on the lower part of each primary hammer; the high-pressure medium pipe or cable passes through the guide frame and the push-pull device to enter a primary hammer distribution pipeline to drive the secondary hammers to perform percussive drilling; mud channels are provided in each primary hammer; and the slurry discharge pipe passes through the guide frame and communicates with the gas collecting hoods.

METHOD OF DEPLOYING A HEAT EXCHANGER PIPE
20190145666 · 2019-05-16 ·

A new system for and a method of deploying a heat exchanger pipe. A bore hole is drilled from an access ditch location to a terminal ditch location using a piloted drill head powered via an umbilical attached to the piloted drill head. A casing is attached to the piloted drill head and disposed about the umbilical into the bore hole from the access ditch location to the terminal ditch location. At the terminal ditch location, the piloted drill head is removed from the casing and the umbilical and a heat exchanger pipe is attached to the umbilical. The umbilical is withdrawn from within the casing deployed in the bore hole to pull the heat exchanger pipe into the casing. The casing is then withdrawn from the bore hole leaving the heat exchanger pipe in the bore hole.