Patent classifications
E21B17/01
SUBSEA LINE CLAMP ASSEMBLY
A subsea line clamp assembly (1) has a body (10) having an axis and a clamp member (50), assembled in segments around a subsea line (3), and tethered to a subsea anchor (5). The clamp member (50) is movably located within the body (10). The inner surface of the body (10) and the outer surface of the clamp member (50) have respective tapered portions as part of teeth (32, 72) arranged to inter-engage. Adjacent teeth (32, 72) may be separated by axis-parallel portions. The clamping force on the subsea line (30) can be maintained at a consistent clamping force throughout the service life of the subsea line (3), despite the actions of creep and compression acting to reduce the outer diameter of the line (3).
Buoyancy assist tool with degradable nose
A downhole apparatus includes a casing string with a fluid barrier connected therein defining a lower end of a buoyancy chamber. A rupture disk is spaced from the fluid barrier and defines an upper end of the buoyancy chamber. A degradable plug is connected in the casing string above the rupture disk. The degradable plug defines a flow path to permit flow therethrough to the rupture disk, and is movable from a first to a second position in the casing string.
SYSTEMS AND METHODS FOR INITIATING AN EMERGENCY DISCONNECT SEQUENCE
Systems and methods for initiating an emergency disconnect sequence (EDS) are provided. In an aspect, a disconnection system is provided and configured to initiate the EDS, and includes a controller including a processor and a memory operably coupled to the processor. The controller receives, from a set of motion reference units (MRU(s)) operably coupled to a flexible joint, position data generated by the set of motion references units and associated with the joint when the joint is operably coupled to and disposed between a drilling riser and a lower marine riser package (LMRP). The controller determines, based on the position data, an angular offset of the joint. The controller sends, to a subsea control pod disposed at or adjacent to the LMRP, a trigger signal in response to determining that the angular offset exceeds a predetermined threshold, such that the subsea control pod initiates the EDS.
SYSTEMS AND METHODS FOR INITIATING AN EMERGENCY DISCONNECT SEQUENCE
Systems and methods for initiating an emergency disconnect sequence (EDS) are provided. In an aspect, a disconnection system is provided and configured to initiate the EDS, and includes a controller including a processor and a memory operably coupled to the processor. The controller receives, from a set of motion reference units (MRU(s)) operably coupled to a flexible joint, position data generated by the set of motion references units and associated with the joint when the joint is operably coupled to and disposed between a drilling riser and a lower marine riser package (LMRP). The controller determines, based on the position data, an angular offset of the joint. The controller sends, to a subsea control pod disposed at or adjacent to the LMRP, a trigger signal in response to determining that the angular offset exceeds a predetermined threshold, such that the subsea control pod initiates the EDS.
METHOD AND APPARATUS FOR INSPECTING MARINE RISERS
A method and device for inspecting marine risers is described. The marine riser is deployed from a floating unit and connected to a lower marine riser package (LMRP) and a blow-out prevention (BOP) stack, and the method comprises: performing a first riser inspection with an inspection tool where the marine riser is in an unconnected well configuration, wherein the inspection tool includes an ultrasonic transducer device, and the first riser inspection comprises: conveying the inspection tool in an internal diameter of the marine riser, detecting information on the marine riser with the inspection tool while conveying the inspection tool through the marine riser, and collecting data with the inspection tool corresponding to the information detected by the inspection tool.
METHOD AND APPARATUS FOR INSPECTING MARINE RISERS
A method and device for inspecting marine risers is described. The marine riser is deployed from a floating unit and connected to a lower marine riser package (LMRP) and a blow-out prevention (BOP) stack, and the method comprises: performing a first riser inspection with an inspection tool where the marine riser is in an unconnected well configuration, wherein the inspection tool includes an ultrasonic transducer device, and the first riser inspection comprises: conveying the inspection tool in an internal diameter of the marine riser, detecting information on the marine riser with the inspection tool while conveying the inspection tool through the marine riser, and collecting data with the inspection tool corresponding to the information detected by the inspection tool.
MODIFIED RISER JOINTS FOR SUBSEA MANAGED PRESSURE OPERATIONS
Systems and processes for subsea marine managed pressure operations. One system includes a modified riser joint configured to fluidly connect inline with one or more riser joints. The modified riser joint and the one or more riser joints are connected to form a riser connecting a floating vessel with a wellhead. The system further includes a subsea pressure management sub-system configured to be operatively and fluidly connected to the modified riser joint at a subsea location.
MODIFIED RISER JOINTS FOR SUBSEA MANAGED PRESSURE OPERATIONS
Systems and processes for subsea marine managed pressure operations. One system includes a modified riser joint configured to fluidly connect inline with one or more riser joints. The modified riser joint and the one or more riser joints are connected to form a riser connecting a floating vessel with a wellhead. The system further includes a subsea pressure management sub-system configured to be operatively and fluidly connected to the modified riser joint at a subsea location.
Pipe Wrench
A pipe wrench for making-up or breaking-out a threaded connection between a first tubular member and a second tubular member includes an upper wrench assembly with a pair of upper jaw assemblies configured to grip the first tubular member and a lower wrench assembly with a pair of lower jaw assemblies configured to grip the second tubular member. The upper and lower wrench assemblies are concentrically constrained, axially overlap, and radially engage with one another. Each of the upper and lower wrench assemblies independently includes a frame with a curved segment containing an arc at an angle of about 160° to about 200°. The upper and lower wrench assemblies are configured to rotate the first tubular member relative to the second tubular member and can have an angle of rotation in a range from about 75° to about 180°.
Production risers having rigid inserts and systems and methods for using
An apparatus enables modifying a riser's operating parameters for transporting production fluids from a subsea well to an offshore production facility after an initial period of production to address changes over time in the conditions of the reservoir and/or the riser without removing the original riser. An insert riser having a smaller diameter is inserted into the riser after the initial period. The original riser has a recessed seal face for receiving seal element(s) and a recessed lock groove for receiving a locking ring. An intervention coiled tubing having a sleeve removal tool is inserted into the riser to engage a protective sleeve covering the recessed seal face. The tubing is pulled to the floating structure thereby removing the protective sleeve and the temporary retaining ring from the production riser, exposing the recessed seal face. The insert riser can then be inserted into the riser and locked into place.