E21B37/08

ACID WASH SYSTEM FOR WIRELINE AND SLICKLINE

A system for acid treating a section of a well includes a wireline or slickline extending from a surface of the well into the well and a bailer tool assembly attached to an end of the wireline or slickline. The bailer tool assembly includes a first piston positioned in a first piston housing at an axial end of at least one bailer, the first piston being slidable through the at least one bailer, at least one rotatable nozzle positioned at a lower end of the bailer tool assembly and fluidly connected to a fluid reservoir in the at least one bailer, and a depth indicator tool attached to an upper end of the bailer tool assembly.

DRILLING DEBRIS SEPARATOR

In accordance with embodiments of the present disclosure, a debris separator device for use with a casing system may include an impeller having a plurality of blades to generate a vortex of mud in the section of the casing system when the casing system is lowered into a wellbore. The device may also include a baffle disposed in the section of the casing system, the baffle having an annular cup shape that forms an outer circumferential pocket to capture debris from the vortex of mud. The impeller and baffle may enable the debris separator device to separate debris and other debris from a flow of mud through the casing system so that the debris does not clog a float collar of the system. The disclosed debris separator device may be flushable so that the device does not become clogged with debris and can thereby maintain auto-fill through the casing system.

ONE-TRIP SCREEN INSTALLATION AND CLEANING SYSTEM

A one-trip screen installation and cleaning system includes a tubular supporting a screen. The tubular has an inner surface defining a flow bore positioned radially inwardly of the screen. At least one actuator extends radially inwardly from the inner surface and is positioned axially offset relative to the screen. The at least one actuator includes at least one actuator surface. A wash pipe is arranged in the flow bore. The wash pipe includes a bypass valve including a selectively openable outlet port, a spray cleaning device arranged axially outwardly of the selectively openable outlet port, and an inflow control valve arranged between the selectively openable outlet port and the spray cleaning device.

ONE-TRIP SCREEN INSTALLATION AND CLEANING SYSTEM

A one-trip screen installation and cleaning system includes a tubular supporting a screen. The tubular has an inner surface defining a flow bore positioned radially inwardly of the screen. At least one actuator extends radially inwardly from the inner surface and is positioned axially offset relative to the screen. The at least one actuator includes at least one actuator surface. A wash pipe is arranged in the flow bore. The wash pipe includes a bypass valve including a selectively openable outlet port, a spray cleaning device arranged axially outwardly of the selectively openable outlet port, and an inflow control valve arranged between the selectively openable outlet port and the spray cleaning device.

SUBMERSIBLE PUMP SYSTEMS AND METHODS OF USE

Systems, methods, and tools for economically performing downhole well maintenance, utilizing a flexible reinforced hose and maintenance tools designed to work with the hose. Tools include well perforation cleaning tools using water jets and/or brushes, pad removal tools, sand bailing tools, and fluid level meters.

SUBMERSIBLE PUMP SYSTEMS AND METHODS OF USE

Systems, methods, and tools for economically performing downhole well maintenance, utilizing a flexible reinforced hose and maintenance tools designed to work with the hose. Tools include well perforation cleaning tools using water jets and/or brushes, pad removal tools, sand bailing tools, and fluid level meters.

Sectional Pumping Apparatus for Well Case
20220235638 · 2022-07-28 ·

A sectional pumping apparatus for well casing includes a discharge pipe, a submersible pump, a pump housing, a swab tool, and a central axis. The discharge pipe, the submersible pump, the pump housing, and the swab tool are concentrically positioned along the central axis. The discharge pipe includes a first tubular body and a flange connector. The flange connector is radially connected around the first tubular body. The submersible pump is hermetically attached to a pump end of the first tubular body. The submersible pump and the pump end are positioned within the pump housing as the first tubular body is hermetically attached to a top end of the pump housing through the flange connector. The swab tool is hermetically attached to a bottom end of the pump housing and is in fluid communication with the discharge pipe through the submersible pump.

Downhole tool with a propellant charge
11396783 · 2022-07-26 · ·

A method of removing material from a target is described. The method comprises the steps of providing a tool, the tool having at least one propellant source; pressurising the tool to a pressure higher than the environmental pressure; igniting at least one of the propellant source(s) to form a combustion zone; and directing combustion products generated at the combustion zone along at least one tool flow path. The tool flow path(s) is selectively openable or closable, such that upon exiting the tool flow path(s) the combustion products interact with a target, the interaction causing material to be removed from the target.

INJECTIVITY AND PRODUCTION IMPROVEMENT IN OIL AND GAS FIELDS

Methods and systems for treating wellbores. An example method includes introducing an acidic treatment fluid into the well; wherein the acidic treatment fluid comprises an acid and a first aqueous base fluid. The method further includes introducing an enzymatic treatment fluid into the well; wherein the enzymatic treatment fluid comprises an enzyme and a second aqueous base fluid. The method additionally includes contacting the filter cake with the acidic treatment fluid and contacting the filter cake with the enzymatic treatment fluid after the filter cake was contacted with the acidic treatment fluid.

INJECTIVITY AND PRODUCTION IMPROVEMENT IN OIL AND GAS FIELDS

Methods and systems for treating wellbores. An example method includes introducing an acidic treatment fluid into the well; wherein the acidic treatment fluid comprises an acid and a first aqueous base fluid. The method further includes introducing an enzymatic treatment fluid into the well; wherein the enzymatic treatment fluid comprises an enzyme and a second aqueous base fluid. The method additionally includes contacting the filter cake with the acidic treatment fluid and contacting the filter cake with the enzymatic treatment fluid after the filter cake was contacted with the acidic treatment fluid.