E21B43/12

Selective flow control using cavitation of subcooled fluid

An embodiment of a fluid control device includes a housing, a fluid channel defined within the housing, the fluid channel having a first surface and a second surface opposing the first surface and having an inlet, and a flow control body disposed in the fluid channel, the flow control body tapering toward the inlet. The body, in use, causing fluid flowing through the channel to diverge into at least a first path between the first surface and a first side of the body, and a second path defined by at least by the second side of the body. A geometry of the first path and the second path selected is based on a subcool of the fluid at a pressure of the fluid entering the fluid channel, and the geometry is selected to induce cavitation of the fluid to choke fluid flow through the fluid channel.

Lubricating downhole-type rotating machines

A downhole-type device includes an electric machine. The electric machine includes an electrical rotor configured to couple with a device to drive or be driven by the electric machine. An electrical stator surrounds the electric rotor. The electric stator includes a seal configured to isolate stator windings from an outside, downhole environment. An inner surface of the seal and an outer surface of the electric rotor define an annulus exposed to the outside environment. A bearing couples the electric rotor to the electric stator. A lubrication system is fluidically coupled to the downhole-type device. The lubrication system includes a topside pressure pump and a downhole-type distribution manifold configured to be used within a wellbore. The distribution manifold is fluidically connected to the topside pressure pump and the bearing to receive a flow of lubricant from the topside pressure pump.

Methods of controlling water production from hydrocarbon bearing subterranean formations using dense carbon dioxide compositions

A method for reducing water production from a hydrocarbon bearing subterranean formation includes identifying a high permeability zone in the formation and injecting a dense CO.sub.2 composition from a production well into the high permeability zone. The dense CO.sub.2 composition includes dense CO.sub.2 and a thickener soluble in the dense CO.sub.2. The thickener includes a copolymer that is the polymerized reaction product of monomers that include at least one alkenyl ether or dialkenyl ether monomer, at least one acrylate or methacrylate monomer, at least one structural monomer, and at least one allyl ester monomer. After injecting the dense CO.sub.2 composition into the high permeability zone, the method includes withdrawing hydrocarbons from the hydrocarbon bearing subterranean formation through the production well. The dense CO.sub.2 composition blocks pores in the high permeability zone to reduce or prevent flow of water from the high permeability zone into the production well.

Methods of controlling water production from hydrocarbon bearing subterranean formations using dense carbon dioxide compositions

A method for reducing water production from a hydrocarbon bearing subterranean formation includes identifying a high permeability zone in the formation and injecting a dense CO.sub.2 composition from a production well into the high permeability zone. The dense CO.sub.2 composition includes dense CO.sub.2 and a thickener soluble in the dense CO.sub.2. The thickener includes a copolymer that is the polymerized reaction product of monomers that include at least one alkenyl ether or dialkenyl ether monomer, at least one acrylate or methacrylate monomer, at least one structural monomer, and at least one allyl ester monomer. After injecting the dense CO.sub.2 composition into the high permeability zone, the method includes withdrawing hydrocarbons from the hydrocarbon bearing subterranean formation through the production well. The dense CO.sub.2 composition blocks pores in the high permeability zone to reduce or prevent flow of water from the high permeability zone into the production well.

Stinger for actuating surface-controlled subsurface safety valve

A system used downhole in tubing is operable with pressure communicated via at least one control line. The system includes a tool and a stinger. The tool disposed with the tubing has a tool bore for passage of tubing flow. The tool has an operator movable between operable states, and the operator has a tool key disposed in the bore. The stinger removably disposed in the tubing is configured to insert into the tool bore. The stinger has an actuator in communication with the at least one control line. Actuated by the control line, a stinger key disposed on the stinger is movable with the actuator between positions. In this way, the stinger key is configured to engage the tool key and is configured to move the tool's operator at least from the one state to another.

Unibody bypass plunger and valve cage with sealable ports

A bypass plunger includes a unibody, or one-piece hollow body and valve cage, retains a dart valve within the valve cage portion using a threaded retaining nut secured by crimple detents, and includes sealable flow parts. A series of helical grooves surround the central portion of the outer surface of the hollow body of the plunger to control spin during descent. A canted-coil-spring disposed within the retaining nut functions as a clutch. The valve cage includes ports that may be configured to control flow through the plunger during descent. Other embodiments include clutch assemblies using canted-coil springs with split bobbins, and surfaced valve stems surfaced.

Downhole electric switch
11578571 · 2023-02-14 · ·

Systems and methods include a system for controlling a downhole multi-circuit switch using a downhole actuator mechanism. A command is sent, by a surface controller coupled to downhole electrically-powered equipment in a wellbore of a well, to change electrical power flow in a multi-circuit switch to a specified position of multiple positions. A connection between the surface controller and the downhole electrically-powered equipment includes at least two separate input electrical connections for supplying electrical power to the downhole electrically-powered equipment. The command is received by a downhole actuator mechanism from the surface controller. The command indicates to switch from a first electrical connection of the at least two separate input electrical connections to a second electrical connection of the at least two separate input electrical connections. The multi-circuit switch is switched by the downhole actuator mechanism based on the command to change a power source of the downhole electrically-powered equipment, including isolating a first input electrical connection.

Fracturing pump with in-line fluid end

A fluid end for use with a power end. The fluid end comprises a plurality of fluid end sections positioned adjacent one another. Each section includes a single horizontally positioned bore. A plunger is installed within the bore and includes a fluid passageway. Low-pressure fluid enters the bore through the plunger and high-pressure fluid exits the fluid end through an outlet valve installed within the bore. The intake of low-pressure fluid within the fluid end section is regulated by an inlet valve installed within the plunger. Low-pressure fluid enters the plunger through an inlet component attached to both the plunger and an inlet manifold.

Methods for In-Situ Application of a Coating Agent to Production Tubing Using a Plunger Lift System
20230041390 · 2023-02-09 ·

Methods for the in-situ application of coating agent to production tubing within wellbores using plunger lift systems are provided herein. One method includes shutting in the wellbore, pressurizing the production tubing to displace fluids from the production tubing, and dropping a plunger from the surface into the production tubing such that the plunger travels toward the bottom of the production tubing until landing on a bumper spring. The method also includes pumping a predetermined amount of the coating agent from the surface into the production tubing such that the coating agent flows to the bottom of the production tubing and settles on top of the plunger and utilizing the differential pressure between the production tubing and the annulus to return the plunger and the coating agent to the surface, where the coating agent is applied to the inner diameter of the production tubing as it flows toward the surface.

Methods for In-Situ Application of a Coating Agent to Production Tubing Using a Plunger Lift System
20230041390 · 2023-02-09 ·

Methods for the in-situ application of coating agent to production tubing within wellbores using plunger lift systems are provided herein. One method includes shutting in the wellbore, pressurizing the production tubing to displace fluids from the production tubing, and dropping a plunger from the surface into the production tubing such that the plunger travels toward the bottom of the production tubing until landing on a bumper spring. The method also includes pumping a predetermined amount of the coating agent from the surface into the production tubing such that the coating agent flows to the bottom of the production tubing and settles on top of the plunger and utilizing the differential pressure between the production tubing and the annulus to return the plunger and the coating agent to the surface, where the coating agent is applied to the inner diameter of the production tubing as it flows toward the surface.