E21D23/0004

DIGITAL SPEED REGULATING VALVE FOR ALIGNING HYDRAULIC SUPPORTS IN FULLY MECHANIZED MINING FACE AND CONTROL METHOD THEREOF

A speed regulating valve, an alignment system, and an alignment method are provided. The speed regulating valve includes a valve core and a valve base. The valve core is provided with an internal channel and is in communication with an inlet of the speed regulating valve. A first speed regulating port is arranged on the valve core. The valve base is in communication with an outlet of the speed regulating valve, and a second speed regulating port is arranged on the valve base. The valve core and the valve base are rotatable relative to each other, and the second speed regulating port is on a trajectory of a rotation of the first speed regulating port.

LONGWALL OPTIMINZATION CONTROL
20170159431 · 2017-06-08 ·

A method of controlling a longwall mining system, the longwall mining system including a longwall shearer, a conveyor, and a plurality of roof supports, such that the method includes creating, by a controller, a load profile of the conveyor representing a distribution of mineral along a length of the conveyor, calculating, by the controller, a desired change in the load profile based on the load profile of the conveyor, and controlling, by the controller, the longwall mining system to adjust the distribution of mineral on the conveyor based on the desired change in load profile.

METHOD FOR REMOVING HYDRAULIC SUPPORT FOR SOLID FILLING COAL MINING
20170138194 · 2017-05-18 ·

A method for removing a hydraulic support for solid filling coal mining includes digging a support removing channel (3) in a coal body (2) in front of the hydraulic support (1), and laying a support removing track (4), then removing the hydraulic support from a coal conveying gateway (11) to a track gateway (5), temporary supporting is carried out by matching a single supporting column with a n-type steel beam before each hydraulic support is removed. A supporting roof is reinforced in time by means of erecting a crib (13) and grouting after each hydraulic support is removed, three grouting pipelines (12) are laid after the supports of the whole work surface are removed, and grouting is carried out in the whole finishing cut space. The roof of the support removing space of the work surface is stable so that the hydraulic supports on the work surface of solid filling coal mining are ensured to be safely and efficiently removed.

LONGWALL FACE SUPPORT IN AN UNDERGROUND MINE
20170019641 · 2017-01-19 ·

The invention relates to the longwall face support of an underground mine having supports (plates 1-18), which longwall face support comprises camera housings (35) each having two cameras (36), which record a monitoring area of the face having a plurality of plates in the longitudinal direction of the gallery and the most complete registration possible of the cross section of the gallery. The cameras in a monitoring area are assigned to a common power supply unit (48) for the power supply and are equipped with intrinsically safe electronics. The electronics have a radio device for high-frequency data transfer (transmission and reception) together with antenna 39 (W-LAN antenna) for the wire-free connection to the local camera network (Wireless Local Area Network). Each camera and each camera housing is assigned a camera code and an address code, which is added to the identification data. Each radio device is configured such that data marked with an extrinsic camera code and data and signals marked with an extrinsic address code is emitted to be transmitted following reception.