E21F15/06

Plug for a void, system and method

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of pipes disposed within the foam. The pipes distributed throughout the void. The pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the pipes are positioned in the foam every 4′ to 6′ horizontally with respect to the void. Each pipe has a mixing stick. A method for diverting water from a void in a mine.

Mine exploitation based on stoping, separation and filling control

A mine exploitation method based on stoping, separation and filling control is disclosed herein. The method includes deploying a gangue-less coal mining system; choosing a suitable coal and gangue separation method according to a separation requirement; choosing a suitable filling method according to mine geology, production conditions and rock stratum control requirement; reversely calculating a filling rate according to gangue discharge requirement and control indexes by utilizing theoretical calculation, simulation and experiment; determining a filling process and a separation process according to the filling rate; and feeding back and adjusting the filling process and separation process parameters by monitoring filling and control effect indexes.

CLEAN AND EFFICIENT COAL MINING METHOD
20210189876 · 2021-06-24 ·

The present invention relates to a clean and efficient coal mining method, which is applicable to the field of solid waste treatment in mines. The method is characterized in: the width of short-segment working faces is designed according to the discharge volume of solid wastes produced in a mine, including downhole gangue and surface coal ash; first, two adjacent short-segment working faces are mined and backfilled, and the edges of the filling face and the solid coal side are supported with anchor rods while roadways are retained; the roadways retained at the two short-segment working faces and the coal mass in the middle constitute a long-segment working face mining system; the long-segment working face is mined, the short-segment backfilled working faces at the two sides are mined and backfilled at the same time, and the gangue produced at the long-segment working face is transported to the short-segment working faces to fill, so that a continuous mining system that consists of backfill mining at short-segment working faces and efficient stopping at long-segment working faces is realized. The method provided in the present invention can deal with all surface and downhole solid wastes in a mine, reduces the cost of gangue treatment, and mitigates damages to the ecological environment; besides, the method utilizes solid wastes to fill the gobs to form roadways, eliminates coal pillars and improve resource recovery rate.

CLEAN AND EFFICIENT COAL MINING METHOD
20210189876 · 2021-06-24 ·

The present invention relates to a clean and efficient coal mining method, which is applicable to the field of solid waste treatment in mines. The method is characterized in: the width of short-segment working faces is designed according to the discharge volume of solid wastes produced in a mine, including downhole gangue and surface coal ash; first, two adjacent short-segment working faces are mined and backfilled, and the edges of the filling face and the solid coal side are supported with anchor rods while roadways are retained; the roadways retained at the two short-segment working faces and the coal mass in the middle constitute a long-segment working face mining system; the long-segment working face is mined, the short-segment backfilled working faces at the two sides are mined and backfilled at the same time, and the gangue produced at the long-segment working face is transported to the short-segment working faces to fill, so that a continuous mining system that consists of backfill mining at short-segment working faces and efficient stopping at long-segment working faces is realized. The method provided in the present invention can deal with all surface and downhole solid wastes in a mine, reduces the cost of gangue treatment, and mitigates damages to the ecological environment; besides, the method utilizes solid wastes to fill the gobs to form roadways, eliminates coal pillars and improve resource recovery rate.

Plug for a Void, System and Method
20210115793 · 2021-04-22 · ·

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of pipes disposed within the foam. The pipes distributed throughout the void. The pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the pipes are positioned in the foam every 4′ to 6′ horizontally with respect to the void. Each pipe has a mixing stick. A method for diverting water from a void in a mine.

Plug for a Void, System and Method
20210115793 · 2021-04-22 · ·

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of pipes disposed within the foam. The pipes distributed throughout the void. The pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the pipes are positioned in the foam every 4′ to 6′ horizontally with respect to the void. Each pipe has a mixing stick. A method for diverting water from a void in a mine.

METHOD FOR FILLING DEFORMABLE KARST CAVE
20230407746 · 2023-12-21 ·

The present invention relates to method for filling deformable karst cave, and the steps are: penetrating a grouting pipe into an elastic silicone tube, penetrating the grouting pipe and the elastic silicone tube into a deformable bracket, and lowering into a karst cave; sealing the elastic silicone tube, injecting silicate resin materials into the grouting pipe, and injecting steel fiber reinforced grout to implement a block stone-like structure; sealing the elastic silicone tube, separating the block stone-like structure from the elastic silicone tube to complete a block stone-like structure; lowering the elastic silicone tube and the deformable bracket, sealing the elastic silicone tube, lowering the elastic silicone tube and the deformable bracket tore construct the block stone-like structure, and completing the filling. The present invention may effectively stabilize the karst cave, ensure safe tunnel construction and stable surrounding rocks, and improve engineering construction speed.

METHOD FOR FILLING DEFORMABLE KARST CAVE
20230407746 · 2023-12-21 ·

The present invention relates to method for filling deformable karst cave, and the steps are: penetrating a grouting pipe into an elastic silicone tube, penetrating the grouting pipe and the elastic silicone tube into a deformable bracket, and lowering into a karst cave; sealing the elastic silicone tube, injecting silicate resin materials into the grouting pipe, and injecting steel fiber reinforced grout to implement a block stone-like structure; sealing the elastic silicone tube, separating the block stone-like structure from the elastic silicone tube to complete a block stone-like structure; lowering the elastic silicone tube and the deformable bracket, sealing the elastic silicone tube, lowering the elastic silicone tube and the deformable bracket tore construct the block stone-like structure, and completing the filling. The present invention may effectively stabilize the karst cave, ensure safe tunnel construction and stable surrounding rocks, and improve engineering construction speed.

MINE EXPLOITATION BASED ON STOPING, SEPARATION AND FILLING CONTROL

The present invention discloses a mine exploitation method based on stoping, separation and filling control. The design process comprises: deploying a gangue-less coal mining system; choosing a suitable coal and gangue separation method according to a separation requirement; choosing a suitable filling method according to mine geology, production conditions and rock stratum control requirement; reversely calculating a filling rate according to gangue discharge requirement and control indexes by utilizing theoretical calculation, simulation and experiment; determining a filling process and a separation process according to the filling rate; and feeding back and adjusting the filling process and separation process parameters by monitoring filling and control effect indexes. The design method is highly integrated with underground coal and gangue separation, gangue filling and coal stoping processes, design is performed aimed at different control requirements of controlled objects under different engineering backgrounds, the design method can be used for guiding the design of underground mining based on stoping, separation and filling control of a mine, the zero discharge of coal gangue on the ground can be realized, ground subsidence, rock burst and aquifer stability can be controlled, and therefore the design method has a good popularization prospect.

MINE EXPLOITATION BASED ON STOPING, SEPARATION AND FILLING CONTROL

The present invention discloses a mine exploitation method based on stoping, separation and filling control. The design process comprises: deploying a gangue-less coal mining system; choosing a suitable coal and gangue separation method according to a separation requirement; choosing a suitable filling method according to mine geology, production conditions and rock stratum control requirement; reversely calculating a filling rate according to gangue discharge requirement and control indexes by utilizing theoretical calculation, simulation and experiment; determining a filling process and a separation process according to the filling rate; and feeding back and adjusting the filling process and separation process parameters by monitoring filling and control effect indexes. The design method is highly integrated with underground coal and gangue separation, gangue filling and coal stoping processes, design is performed aimed at different control requirements of controlled objects under different engineering backgrounds, the design method can be used for guiding the design of underground mining based on stoping, separation and filling control of a mine, the zero discharge of coal gangue on the ground can be realized, ground subsidence, rock burst and aquifer stability can be controlled, and therefore the design method has a good popularization prospect.