Patent classifications
E01C11/18
CEMENTITIOUS COMPOSITE CONSTITUENT RELATIONSHIPS
A cementitious composite includes a first layer, a second layer spaced from the first layer, a cementitious mixture disposed between the first layer and the second layer, and a structure layer disposed between the first layer and the second layer. The cementitious mixture is disposed within the structure layer. The cementitious mixture includes cementitious materials. The cementitious mixture is configured to absorb a mass of water that provides a maximum 28 day compressive strength of the cementitious composite upon curing which is represented by M.sub.w=x.Math.M.sub.c. M.sub.w is the mass of water per unit area of the cementitious composite. M.sub.c is a mass of cementitious materials of the cementitious mixture per unit area of the cementitious composite. x is a ratio of the mass of water relative to the mass of cementitious materials of the cementitious mixture per unit area of the cementitious composite. x is between 0.25 and 0.55.
IMPROVEMENTS IN STRUCTURAL CELLS, MATRICES AND METHODS OF ASSEMBLY
Structural cells and matrices using the structural cells for positioning below a hardscape that define a void space therein, the structural cells, matrices using the cells and methods of assembly allowing in one embodiment the introduction of a structural fluid such as concrete to provide an alternative structural cell and matrix product. In one embodiment a structural cell assembly is described comprising a structural cell with a plurality of legs integrally linked to a frame at a first frame end, the frame linking the legs together and the frame defining a generally flat plane with the legs extending substantially orthogonally away from the first frame end about the frame flat plane to a leg terminal end; and a separate plate engaging the legs, the separate plate comprising linked sockets, each socket engaging the leg terminal end; and/or linked sockets, each socket engaging the leg frame ends or a part thereof.
ASPHALT FIBER METERING SYSTEM
A system for metering reinforcing aramid fibers into an asphalt mixer includes a vertical feed chute with straight walls that spans substantially a full diameter and a full length of a horizontal feed auger to feed bulk fibrous material by gravity from the feed chute in a radial direction along the length of the feed auger. The feed auger is rotated at a controlled rate proportionally to the rate of production of an asphalt and mineral aggregate mixture. A pneumatic conveying line conveys the reinforcing fibers from an outlet end of the feed auger to an asphalt mixer for mixing with the asphalt and mineral aggregate to produce a fiber reinforced asphalt concrete with an accurately proportioned amount of fiber dispersed therein.
ASPHALT FIBER METERING SYSTEM
A system for metering reinforcing aramid fibers into an asphalt mixer includes a vertical feed chute with straight walls that spans substantially a full diameter and a full length of a horizontal feed auger to feed bulk fibrous material by gravity from the feed chute in a radial direction along the length of the feed auger. The feed auger is rotated at a controlled rate proportionally to the rate of production of an asphalt and mineral aggregate mixture. A pneumatic conveying line conveys the reinforcing fibers from an outlet end of the feed auger to an asphalt mixer for mixing with the asphalt and mineral aggregate to produce a fiber reinforced asphalt concrete with an accurately proportioned amount of fiber dispersed therein.
NONWOVEN CEMENTITIOUS COMPOSITE FOR IN-SITU HYDRATION
A cementitious composite includes a structure layer, a cementitious material, a water-impermeable sealing layer, and a containment layer. The structure layer has a first side and an opposing second side. The structure layer defines a plurality of open spaces. The cementitious material includes a plurality of cementitious particles disposed within the plurality of open spaces of the structure layer. The water-impermeable sealing layer is disposed along the first side of the structure layer. The containment layer is disposed along the opposing second side of the structure layer. The containment layer is positioned to prevent the plurality of cementitious particles from migrating out of the structure layer through the containment layer.
NONWOVEN CEMENTITIOUS COMPOSITE FOR IN-SITU HYDRATION
A cementitious composite includes a structure layer, a cementitious material, a water-impermeable sealing layer, and a containment layer. The structure layer has a first side and an opposing second side. The structure layer defines a plurality of open spaces. The cementitious material includes a plurality of cementitious particles disposed within the plurality of open spaces of the structure layer. The water-impermeable sealing layer is disposed along the first side of the structure layer. The containment layer is disposed along the opposing second side of the structure layer. The containment layer is positioned to prevent the plurality of cementitious particles from migrating out of the structure layer through the containment layer.
Cementitious composite constituent relationships
A cementitious composite for in-situ hydration includes a first layer, a second layer spaced from the first layer, and a cementitious mixture disposed between the first layer and the second layer. The cementitious mixture includes cementitious materials. The cementitious mixture is configured to absorb a mass of water that provides a maximum 28 day compressive strength of the cementitious composite upon curing which is represented by M.sub.w=x.Math.M.sub.c. M.sub.w is the mass of the water per unit area of the cementitious composite. M.sub.c is a mass of the cementitious materials of the cementitious mixture per unit area of the cementitious composite. x is a ratio of the mass of the water relative to the mass of the cementitious materials of the cementitious mixture per unit area of the cementitious composite that provides the maximum 28 day compressive strength of the cementitious composite. x is between 0.25 and 0.55.
Cementitious composite constituent relationships
A cementitious composite for in-situ hydration includes a first layer, a second layer spaced from the first layer, and a cementitious mixture disposed between the first layer and the second layer. The cementitious mixture includes cementitious materials. The cementitious mixture is configured to absorb a mass of water that provides a maximum 28 day compressive strength of the cementitious composite upon curing which is represented by M.sub.w=x.Math.M.sub.c. M.sub.w is the mass of the water per unit area of the cementitious composite. M.sub.c is a mass of the cementitious materials of the cementitious mixture per unit area of the cementitious composite. x is a ratio of the mass of the water relative to the mass of the cementitious materials of the cementitious mixture per unit area of the cementitious composite that provides the maximum 28 day compressive strength of the cementitious composite. x is between 0.25 and 0.55.
FIBER RING REINFORCEMENT STRUCTURES
A method for making a reinforced concrete structure and reinforcement agents are provided. In some embodiments, the method includes obtaining a mold for the reinforced concrete structure. A lattice is formed within the mold, where the lattice includes inter-locking ringed fibers and where each inter-locking ringed fiber is a fiber formed into a ringed structure that is inter-locked with at least one neighboring inter-locking ringed fiber in the lattice. The lattice is then encased by filling the mold with concrete. In some embodiments, the reinforcement agents are a plurality of ringed fiber-structures, each of which is coiled into a ringed structure that may or may not inter-lock with at least one neighboring ringed fiber(s)-structure.
CONCRETE RUNWAYS, ROADS, HIGHWAYS AND SLABS ON GRADE AND METHODS OF MAKING SAME
The invention comprises a method of forming a slab on grade. The method comprises placing a first layer of insulating material horizontally on the ground and placing plastic concrete for a slab on grade on the first layer of insulating material. The plastic concrete is then formed into a desired shape having a top and sides. A second layer of insulating material is placed on the top of the plastic concrete and the first and second layers of insulating material are left in place until the concrete is at least partially cured. The second layer of insulating material is then removed. The product made by the method is also disclosed. A slab on grade is also disclosed.