Patent classifications
E02D5/24
Secondary containment
This patent pertains to secondary containment systems. One implementation includes a support assembly that includes an elongate post member and a stabilization plate. In one instance, a stabilization plate is mounted on the elongate post member to reduce movement of the elongate post member when the stabilization plate is embedded in the ground. Another implementation includes a panel splice assembly including reinforcing members that secure overlapping, corrugated panels.
Secondary containment
This patent pertains to secondary containment systems. One implementation includes a support assembly that includes an elongate post member and a stabilization plate. In one instance, a stabilization plate is mounted on the elongate post member to reduce movement of the elongate post member when the stabilization plate is embedded in the ground. Another implementation includes a panel splice assembly including reinforcing members that secure overlapping, corrugated panels.
Methods for retrofitting a wind turbine foundation and wind turbine foundations
A method for retrofitting a wind turbine foundation is provided. The foundation comprises a first substantially elongated pile (31) in the ground. The method further comprises: arranging a lower end of an elongated channel (41) of a second substantially elongated pile (40) around the first pile (31), wherein the elongated channel (41) extends substantially along a longitudinal direction of the second pile (40), wherein the channel (41) is configured to receive at least a portion of the first pile. The method further comprises lowering the second pile (40) such that the elongated channel (41) surrounds at least a portion of the first pile (31). Finally, the second pile (40) is driven into the ground (35).
Methods for retrofitting a wind turbine foundation and wind turbine foundations
A method for retrofitting a wind turbine foundation is provided. The foundation comprises a first substantially elongated pile (31) in the ground. The method further comprises: arranging a lower end of an elongated channel (41) of a second substantially elongated pile (40) around the first pile (31), wherein the elongated channel (41) extends substantially along a longitudinal direction of the second pile (40), wherein the channel (41) is configured to receive at least a portion of the first pile. The method further comprises lowering the second pile (40) such that the elongated channel (41) surrounds at least a portion of the first pile (31). Finally, the second pile (40) is driven into the ground (35).
Rapid consolidation and compaction method for soil improvement of various layers of soils and intermediate geomaterials in a soil deposit
The rapid consolidation and compaction method comprises (i) first driving a hollow pipe, (ii) driving a pipe with a removable end plate after filling and compacting the sandy material in it, through the hollow pipe, to required depth, creating high excess pore-water pressures in the range of 50 to 300 KPa in clayey soils, (iv) pulling out the pipe section leaving behind the removable end plate and thereby installing porous displacement piles which allows dissipation of the excess pore-water pressures horizontally to the porous displacement pile, in which the excess water flows out vertically to the ground surface, and (v) the length of the drainage path is reduced to half the spacing between adjoining porous displacement piles, allowing rapid consolidation resulting in increase in density. Installing the porous displacement piles in the layer of loose to medium dense sand layer results in the instantaneous increase in its density.
Rapid consolidation and compaction method for soil improvement of various layers of soils and intermediate geomaterials in a soil deposit
The rapid consolidation and compaction method comprises (i) first driving a hollow pipe, (ii) driving a pipe with a removable end plate after filling and compacting the sandy material in it, through the hollow pipe, to required depth, creating high excess pore-water pressures in the range of 50 to 300 KPa in clayey soils, (iv) pulling out the pipe section leaving behind the removable end plate and thereby installing porous displacement piles which allows dissipation of the excess pore-water pressures horizontally to the porous displacement pile, in which the excess water flows out vertically to the ground surface, and (v) the length of the drainage path is reduced to half the spacing between adjoining porous displacement piles, allowing rapid consolidation resulting in increase in density. Installing the porous displacement piles in the layer of loose to medium dense sand layer results in the instantaneous increase in its density.
Pile coupling for helical pile/torqued in pile
A pile includes a first pile section having a first end that engages a supporting medium and an opposing second end. A first end of a second pile section is engageable with the second end of the first pile section, each of the first and second pile sections having mating end fittings that create an in fit. A sleeve overlays the first and second engaged ends of the first and second pile sections. At least one through hole aligned with at least one corresponding through hole of the first pile section is sized for receiving a fastener far securing the sleeve to the first pile section. In another version, the ends of the pile section are engaged in contact while the overlaying sleeve has a pair of interlocking sleeve or coupler portions that are configured to provide torsional resistance. Additional pile sections can be sequentially attached to the second pile section.
Pile coupling for helical pile/torqued in pile
A pile includes a first pile section having a first end that engages a supporting medium and an opposing second end. A first end of a second pile section is engageable with the second end of the first pile section, each of the first and second pile sections having mating end fittings that create an in fit. A sleeve overlays the first and second engaged ends of the first and second pile sections. At least one through hole aligned with at least one corresponding through hole of the first pile section is sized for receiving a fastener far securing the sleeve to the first pile section. In another version, the ends of the pile section are engaged in contact while the overlaying sleeve has a pair of interlocking sleeve or coupler portions that are configured to provide torsional resistance. Additional pile sections can be sequentially attached to the second pile section.
GROUT PLUG SYSTEMS AND METHODS FOR PLACING PILES
A grout plug assembly for use in forming a pipe pile system defining at least one pile assembly inner surface portion comprises a resiliently deformable plug body and a substantially rigid plug cap. The resiliently deformable plug body defining a plug outer surface, a plug inner surface, a first plug end surface, a second plug end surface, where the plug inner surface defines a plug passageway. The substantially rigid plug cap defines a cap outer surface, a cap inner surface, a first cap end surface, and a second cap end surface. The second cap end surface is rigidly secured to the first plug end surface. The plug outer surface is sized and dimensioned to engage the at least one pile assembly inner surface portion of the pipe pile system during formation of the pipe pile system
GROUT PLUG SYSTEMS AND METHODS FOR PLACING PILES
A grout plug assembly for use in forming a pipe pile system defining at least one pile assembly inner surface portion comprises a resiliently deformable plug body and a substantially rigid plug cap. The resiliently deformable plug body defining a plug outer surface, a plug inner surface, a first plug end surface, a second plug end surface, where the plug inner surface defines a plug passageway. The substantially rigid plug cap defines a cap outer surface, a cap inner surface, a first cap end surface, and a second cap end surface. The second cap end surface is rigidly secured to the first plug end surface. The plug outer surface is sized and dimensioned to engage the at least one pile assembly inner surface portion of the pipe pile system during formation of the pipe pile system