E02D17/12

Fast-setting flowable fill compositions, and methods of utilizing and producing the same

Fast-setting flowable fill compositions for filling ground trenches are described. The compositions set quickly but retain a low strength psi at 28 days. The compositions also reduce bleed water on the surface of the fast-setting flowable fill and therefor enable quicker application of surface repair material, e.g., pavement patches, to the trench. The compositions consist of aggregate, Portland cement, accelerant, water and sometimes air. The compositions may have a compressive strength of between 5 psi and 60 psi after 2 hours, a compressive strength of between 10 psi and 100 psi after 4 hours, a compressive strength of between 75 psi and 500 psi after 28 days, a penetration resistance of between 1.5 tsf and 75 tsf after 2 hours, a penetration resistance of between 4.5 tsf and 200 tsf after 4 hours, and a shrinkage of less than 2% as measured by ASTM C490. Also disclosed are methods of filling a trench with fast-setting flowable fill.

Fast-setting flowable fill compositions, and methods of utilizing and producing the same

Fast-setting flowable fill compositions for filling ground trenches are described. The compositions set quickly but retain a low strength psi at 28 days. The compositions also reduce bleed water on the surface of the fast-setting flowable fill and therefor enable quicker application of surface repair material, e.g., pavement patches, to the trench. The compositions consist of aggregate, Portland cement, accelerant, water and sometimes air. The compositions may have a compressive strength of between 5 psi and 60 psi after 2 hours, a compressive strength of between 10 psi and 100 psi after 4 hours, a compressive strength of between 75 psi and 500 psi after 28 days, a penetration resistance of between 1.5 tsf and 75 tsf after 2 hours, a penetration resistance of between 4.5 tsf and 200 tsf after 4 hours, and a shrinkage of less than 2% as measured by ASTM C490. Also disclosed are methods of filling a trench with fast-setting flowable fill.

Trench shoring apparatus
12054904 · 2024-08-06 · ·

The trench shoring apparatus includes first and second side panels connected in a parallel spaced-apart configuration by a connecting bar pivotally connected to one end of one or more pairs of lateral arms. The other opposite end of the one or more pairs of lateral arms are hingedly connected to the side panels, such that translational movement of the connecting bar in a direction parallel to the side panels causes the spaced-apart panels to move between retracted and extended parallel spaced-apart configurations. There is a lock for releasably restricting translational movement of the connecting bar.

Trench shoring apparatus
12054904 · 2024-08-06 · ·

The trench shoring apparatus includes first and second side panels connected in a parallel spaced-apart configuration by a connecting bar pivotally connected to one end of one or more pairs of lateral arms. The other opposite end of the one or more pairs of lateral arms are hingedly connected to the side panels, such that translational movement of the connecting bar in a direction parallel to the side panels causes the spaced-apart panels to move between retracted and extended parallel spaced-apart configurations. There is a lock for releasably restricting translational movement of the connecting bar.

Fast-setting flowable fill compositions, and methods of utilizing and producing the same

Fast-setting flowable fill compositions for filling ground trenches are described. The compositions set quickly but retain a low strength psi at 28 days. The compositions also reduce bleed water on the surface of the fast-setting flowable fill and therefor enable quicker application of surface repair material, e.g., pavement patches, to the trench. The compositions consist of aggregate, Portland cement, accelerant, water and sometimes air. The compositions may have a compressive strength of between 5 psi and 60 psi after 2 hours, a compressive strength of between 10 psi and 100 psi after 4 hours, a compressive strength of between 75 psi and 500 psi after 28 days, a penetration resistance of between 1.5 tsf and 75 tsf after 2 hours, a penetration resistance of between 4.5 tsf and 200 tsf after 4 hours, and a shrinkage of less than 2% as measured by ASTM C490. Also disclosed are methods of filling a trench with fast-setting flowable fill.

Fast-setting flowable fill compositions, and methods of utilizing and producing the same

Fast-setting flowable fill compositions for filling ground trenches are described. The compositions set quickly but retain a low strength psi at 28 days. The compositions also reduce bleed water on the surface of the fast-setting flowable fill and therefor enable quicker application of surface repair material, e.g., pavement patches, to the trench. The compositions consist of aggregate, Portland cement, accelerant, water and sometimes air. The compositions may have a compressive strength of between 5 psi and 60 psi after 2 hours, a compressive strength of between 10 psi and 100 psi after 4 hours, a compressive strength of between 75 psi and 500 psi after 28 days, a penetration resistance of between 1.5 tsf and 75 tsf after 2 hours, a penetration resistance of between 4.5 tsf and 200 tsf after 4 hours, and a shrinkage of less than 2% as measured by ASTM C490. Also disclosed are methods of filling a trench with fast-setting flowable fill.