E02D19/04

Suction pile cofferdam
10947692 · 2021-03-16 · ·

A cofferdam is disclosed that includes an open frame structure having double walls defining a hollow space within each double wall, with each double wall having an open bottom end and a closed top end. Each of the double walls are configured to act as suction piles allowing liquid to be removed from the space within each double wall to thereby induce negative pressure when the cofferdam is installed in a sub-sea configuration. Each of the double walls may include a plurality of partitions respectively defining a plurality of suction piles, the suction piles fluidically coupled by a manifold that may allow liquid to be removed from the suction pile to thereby drive the cofferdam structure into the subsea surface due to the induced negative pressure. A further embodiment cofferdam structure includes an open frame structure and one or more suction piles attached to the open frame structure.

SUCTION PILE COFFERDAM
20210032831 · 2021-02-04 ·

A cofferdam is disclosed that includes an open frame structure having double walls defining a hollow space within each double wall, with each double wall having an open bottom end and a closed top end. Each of the double walls are configured to act as suction piles allowing liquid to be removed from the space within each double wall to thereby induce negative pressure when the cofferdam is installed in a sub-sea configuration. Each of the double walls may include a plurality of partitions respectively defining a plurality of suction piles, the suction piles fluidically coupled by a manifold that may allow liquid to be removed from the suction pile to thereby drive the cofferdam structure into the subsea surface due to the induced negative pressure. A further embodiment cofferdam structure includes an open frame structure and one or more suction piles attached to the open frame structure.

Steel pipe cofferdam construction method using suction penetration and stacking of pipe members

A circular pipe member is penetrated into the seabed by a suction pressure, and a plurality of circular pipe members are vertically stacked thereon and integrated thereto to construct a cofferdam. When dismantling the cofferdam, the circular pipe members are disassembled and dismantled in order by using a lifting wire installed at a newly constructed structure installed in the inner space of the cofferdam.

Steel pipe cofferdam construction method using suction penetration and stacking of pipe members

A circular pipe member is penetrated into the seabed by a suction pressure, and a plurality of circular pipe members are vertically stacked thereon and integrated thereto to construct a cofferdam. When dismantling the cofferdam, the circular pipe members are disassembled and dismantled in order by using a lifting wire installed at a newly constructed structure installed in the inner space of the cofferdam.

Method for cemented material dam construction based on whole-process quality control

A method for cemented material dam construction based on whole-process quality control includes: determining a water-binder ratio of a sand and gravel material through a simulation test; laying rockfill on the first cemented sand and gravel layer before the final setting time of the first cemented sand and gravel layer; adjusting the maximum particle size of the rockfill and the distance between the particles in the rockfill according to the design requirements; spraying a cement slurry on the rockfill to wrap all the particles in the rockfill and laying a second cemented sand and gravel layer before the initial setting time of the cement slurry; performing rolling compaction on the construction layer until the decline in the thickness of the construction layer and the apparent density of the rolled surface meet the design requirements; and completing the cemented material dam construction.

Portable cofferdam system
10794033 · 2020-10-06 · ·

A portable cofferdam system for isolating a working area from water such as a culvert. The portable cofferdam system generally includes a first sidewall and a second sidewall each having an interior side, an exterior side, an upper edge, a lower edge and a rear edge. A middle wall is connected to the sidewalls opposite of the rear edges of the sidewalls forming a substantially U-shaped structure. An opening formed between the rear edges of the first sidewall and the second sidewall to allow for positioning about or near the inlet of an object or area to be kept dry such as the inlet of a culvert.

Portable cofferdam system
10794033 · 2020-10-06 · ·

A portable cofferdam system for isolating a working area from water such as a culvert. The portable cofferdam system generally includes a first sidewall and a second sidewall each having an interior side, an exterior side, an upper edge, a lower edge and a rear edge. A middle wall is connected to the sidewalls opposite of the rear edges of the sidewalls forming a substantially U-shaped structure. An opening formed between the rear edges of the first sidewall and the second sidewall to allow for positioning about or near the inlet of an object or area to be kept dry such as the inlet of a culvert.

COFFER DAM WITH AN INTERLOCKING BAFFLE SYSTEM

An exemplary fluid containment system includes at least one baffle having an outer tube and an inner tube. The outer tube has an elongated geometry that defines a size and shape of the baffle structure. The inner tube can be inflated and inserted into the outer tube. The at least one baffle structure having one or more connection points on a surface of the outer tube for connecting with at least one other baffle structure. The outer tube and an at least partially inflated inner tube inserted within are configured to at least counteract forces of a fluid being contained within a specified area.

COFFER DAM WITH AN INTERLOCKING BAFFLE SYSTEM

An exemplary fluid containment system includes at least one baffle having an outer tube and an inner tube. The outer tube has an elongated geometry that defines a size and shape of the baffle structure. The inner tube can be inflated and inserted into the outer tube. The at least one baffle structure having one or more connection points on a surface of the outer tube for connecting with at least one other baffle structure. The outer tube and an at least partially inflated inner tube inserted within are configured to at least counteract forces of a fluid being contained within a specified area.

STEEL PIPE COFFERDAM CONSTRUCTION METHOD USING SUCTION PENETRAION AND STACKING OF PIPE MEMBERS
20200173132 · 2020-06-04 ·

A circular pipe member is penetrated into the seabed by a suction pressure, and a plurality of circular pipe members are vertically stacked thereon and integrated thereto to construct a cofferdam. When dismantling the cofferdam, the circular pipe members are disassembled and dismantled in order by using a lifting wire installed at a newly constructed structure installed in the inner space of the cofferdam.