E04B1/24

Modular integrated building and construction method thereof

Disclosed herewith a modular integrated building and a construction method thereof. The building comprises multiple prefabricated room units (1). A bottom of a load-bearing structure of the prefabricated room unit (1) is provided with a semi-prefabricated connecting port (2). Reinforcing bars arranged at a top of the prefabricated room unit (1) of a next floor are inserted in the connecting port (2) and thus connected with reinforcing bars arranged therein, so that the prefabricated room units (1) of two adjacent floors are connected with each other through in-situ casting concrete in the connecting port (2). A cast-in-situ concrete interlayer (3) is arranged on a top plate (11) of the prefabricated room unit (1) of a next floor, for connecting adjacent prefabricated room units (1) of a same floor together.

Panel

A wall/roof panel includes (a) a façade that has (i) an outer surface that defines a front surface of the panel and (ii) a rear surface and (b) a structural element connected to and supporting the façade.

Methods and apparatus for manufacture of moment connection components

A collar flange assembly welding fixture is disclosed, including a stand, a circular mount structure, and a support assembly which are configured to provide access to a front side and a back side of a collar flange assembly held by the support assembly. The stand has a plurality of circumferential bearings equidistant from an axis of rotation, the circular mount structure is rotatably supported by the circumferential bearings, and the support assembly is configured for mounting on the circular mount structure.

CLAMP ATTACHMENT FOR BOOM OF TELESCOPIC HANDLER AND METHOD OF ASSEMBLING AND PLACING DECKING MATERIAL ON A BUILDING USING THE CLAMP ATTACHMENT
20230220659 · 2023-07-13 · ·

A boom clamp attachment has a gib frame, a boom quick-connect, a shaft arm axle, a shaft arm torque assembly, and at least one gib clamp assembly. The gib clamp assembly has a clamp support member having a first gib clamp at a first end and second gib clamp at a second end. The gib clamp has a fixed finger and a moveable finger, the moveable finger controlled via hydraulics. The boom clamp may hoist, tilt, and position an assembled section of panels.

Pre-fabricated structures and methods
11697938 · 2023-07-11 ·

Building structures can be fabricated at an offsite, and then assembled at the construction site. The building structures can include beams and wall panels having metal attachments. The beams and wall panels can be assembled by coupling the metal attachments, for example, by welding.

Pre-fabricated structures and methods
11697938 · 2023-07-11 ·

Building structures can be fabricated at an offsite, and then assembled at the construction site. The building structures can include beams and wall panels having metal attachments. The beams and wall panels can be assembled by coupling the metal attachments, for example, by welding.

SCALABLE DYNAMIC FRAME SYSTEM
20230212850 · 2023-07-06 ·

An assembled frame for a structure in the building can be formed from multiple different types of building blocks for a frame. The assembled frame for the structure in the building is formed with the multiple different types of building blocks for the assembled frame in a manufacturing facility, and then shipped as the assembled frame to a construction site. The multiple different types of individual building blocks for the frame can at least include two or more of i) metal beams/strut framework, ii) metal angle frames, iii) metal cross connects, and iv) metal mating blocks.

Slide clip

A slide clip includes a first plate and a second plate coupled at a juncture. The first plate and the second plate form an angle at the juncture. The second plate has a first elongated slot, a second elongated slot, and a third elongated slot, each extending parallel with the juncture. The first elongated slot and the second elongated slot are each offset from the juncture a first distance. The third elongated slot is offset from the juncture a second distance that is greater than the first distance.

Z-SHAPED ATTACHMENT ELEMENT FOR BUILDING CONSTRUCTION
20230003012 · 2023-01-05 ·

A Z-shaped attachment element for use in building construction is disclosed. The Z-shaped attachment element is made from a single piece of sheet metal that is first cut and then bent to form the Z-shaped cross-sectional profile. The Z-shaped attachment element comprises: an elongated upper flange; an elongated lower flange, wherein the upper and lower flanges are spaced apart and substantially parallel to each other; an elongated middle web section between, and connected to, the upper and lower flanges along respective upper and lower lengthwise bends (wherein the middle web section is diagonal in relation to the position of the upper and lower flanges, thereby defining a generally Z-shaped cross-sectional profile); and a plurality of notches formed along the lower lengthwise bend and into the lower flange and the adjoining middle web section, but not into the upper bend or the upper flange, of the Z-shaped sheet metal attachment element.

Method for making a virgin joint between two separate structural hollow sections, and such a virgin joint

A method of making a virgin joint between at least two separate structural hollow sections in a truss or jacket structure made of the at least two structural hollow sections may include the steps of applying a fiber reinforced polymer wrap around the at least two structural hollow sections in a transitional area, covering and thus bonding together the at least two structural hollow sections, and forming the virgin joint between the at least two structural hollow sections and the fiber reinforced polymer wrap. Welding of the virgin joint between the at least two structural hollow sections is avoided.