E04B2001/3588

Building assembly system and associated method

A building assembly system for fabricating a multi-story building is described, wherein the building includes a vertical support core arranged on a base. Lift jacks are arranged between a top portion and a bottom portion of the vertical support core, and a reusable bridle is suspended from the plurality of lift jacks and slidably arranged on the vertical support core. A floor plate is assembled onto the bridle at an assembly level that is proximal to the base. The plurality of the lift jacks are operable to lift the bridle and the assembled floor plate to a design elevation on the vertical support core, and are operable to lower the bridle to the assembly level on the vertical support core after the floor plate has been secured to the vertical support core at the design elevation.

BUILDING SYSTEM FOR MANUFACTURED HOMES
20240044127 · 2024-02-08 ·

A multi-story building (200) is described for manufactured homes (212) such as container homes. The building (200) includes a ground floor (202), a number of intermediate floors (204), and a top floor (206). The building (200) includes a throughway (208) on the ground floor (202) that allows passage of a transportation vehicle (210) such as a flatbed truck carrying a manufactured home (212). The transportation vehicle (210) can use the throughway (208) to position the manufactured home (212) in alignment with a hoistway (214). A hoist mounted on the roof (216) can then be used to hoist the home (212) to a desired floor (204 or 206).

Assembly for lifting or supporting a load, and members and connectors for use in same
10508005 · 2019-12-17 ·

Provided herein is an assembly for carrying or supporting a load. The assembly comprises a plurality of members connectable in an assembled arrangement for carrying or supporting the load. Each member comprises a first end and a second end, at least one of the first end and the second end has a pair of connecting members comprising two lugs that each has defined therein two holes. The lugs are configured for alignment with a corresponding pair of lugs formed on another member in the assembly. Fasteners extend through the holes formed in the lugs when the holes are aligned. Further provided are members for use in the assembly and connector elements for attaching two or more members in the assembly.

CABLE-DRIVEN ADDITIVE MANUFACTURING SYSTEM

A cable-driven additive manufacturing system includes an end effector configured for linear translation within a three-dimensional workspace, an aerial hoist suspending the end effector by at least one suspension cable, a plurality of base stations disposed below the aerial hoist, and control cables running from each of the base stations to the end effector.

Structure and method of making the same

An entertainment structure includes: an offset core; a moment stabilizing structure; and a plurality of floor plate assemblies. Each of the plurality of floor plate assemblies includes a first edge and a second edge. The first edge of each of the plurality of floor plate assemblies is configured to be coupled to the offset core and the second edge of each of the plurality of floor plate assemblies is configured to be coupled to the moment stabilizing structure.

BUILDING ASSEMBLY SYSTEM AND ASSOCIATED METHOD

A building assembly system for fabricating a multi-story building is described, wherein the building includes a vertical support core arranged on a base. Lift jacks are arranged between a top portion and a bottom portion of the vertical support core, and a reusable bridle is suspended from the plurality of lift jacks and slidably arranged on the vertical support core. A floor plate is assembled onto the bridle at an assembly level that is proximal to the base. The plurality of the lift jacks are operable to lift the bridle and the assembled floor plate to a design elevation on the vertical support core, and are operable to lower the bridle to the assembly level on the vertical support core after the floor plate has been secured to the vertical support core at the design elevation.

SYSTEM AND METHOD FOR LIFTING PREJOINED DECK COMPONENTS
20240159042 · 2024-05-16 · ·

A system and method for rigging and lifting a joined, multi-section assembly of corrugated decking sections for attachment to a Cold-Form Steel. The system and method provide for the utilization of an adaptable rig that securely attaches to a multi-section assembly of corrugated decking sections which have be pre-joined by workers in a safe, preferably terrestrial, workspace. The adaptability of the rig enables it to provide attachment points for lifting and supporting the multi-sectioned decking assemblies of disparate sizes and materials. The location and number of these attachment points being a function of the size, gauge, area and aggregate weight of a given pre-joined multi-section assembly. The system and method are can be utilized with pre-joined multi-section assemblies consisting of individual decking sections fabricated from a variety of materials, including ferrous metals, non-ferrous metals, as well as composite materials.

Attachment and support members for modular building structures

Systems and methods are provided for securing a transport device to preexisting studs or support members. One embodiment includes a clamp assembly with a compression fitting adapted to be secured to a plurality of different sized studs or wall supports, and further to support additional supports including, but not limited, horizontal support members. A transport device is further provided that is selectively connectable to clamp and support members of the disclosure. In another embodiment, a hook bracket is provided which includes a projection configured to be positioned in a hole through a stud. The extension may include a notch to engage a portion of the stud. The hook bracket includes at least one aperture adapted to secure the hook bracket to a support member operatively interconnected to the transport device.

Method For Lifting And Supporting A New Slab Foundation With Hydraulic Jacks
20190169834 · 2019-06-06 ·

A method for lifting and supporting above ground a concrete slab foundation employing hydraulic jacks includes installing piers in the ground, each with a pier extension protruding above ground. A lifting assembly is placed over each pier extension, the lifting assembly having a lift sleeve and upward extending lifting members. Then the slab foundation is poured, bonding a portion of the lifting assembly in concrete. After the slab foundation hardens, a jack is positioned on top of the pier extension, and lifting arms of the jack engage the lifting members. The jack is actuated to exert an upward force on the lifting assembly to lift the slab foundation above the ground. Then, the lift sleeve is rigidly secured to the pier extension, allowing the jack and lifting arms to be removed.

High rise building elevation concept
10280609 · 2019-05-07 ·

The invention is a method to build and erect super high rise buildings with a completely new concept of civil engineering, which is based on concept and method of building of vertical columnar structures by multi stacking of columns using hydraulic suspension and elevator arm system, and then strengthening them with concrete. This is followed with building of gateway support structure around vertical columnar structure and central core to stabilize the high rise building. Next stage is the building of horizontal steel framework platforms at ground level and elevating them by central core elevator and cable hoist system. The passage of horizontal platforms through gateway structure is conducted by alternating opening and closing of gates. The process enables to populate the vertical columnar structures with horizontal platforms, which are then inter locked with vertical columnar structures and central concrete core wall Finally the steel framework platforms are strengthened with concrete.