E04B5/14

STRUCTURAL FRAME FOR A BUILDING AND METHOD OF CONSTRUCTING THE SAME

A structural frame for a building, comprising: adjacent first and second columns; at least one precast concrete floor slab having first and second corner indents located in two adjacent corners and a first elongated edge beam defined between the first and second corner indents, the first elongated edge beam being disposed between the first and second columns such that the first and second columns are received in the first and second corner indents and that the first elongated edge beam abuts the first and second columns; and a first tendon assembly extending between the first and second columns and adapted to be tensioned to compress the first elongated edge beam between the first and second columns, the first tendon assembly including at least one left cable and at least one right cable located symmetrically on either sides of a vertical center plane of the first and second columns.

Concrete fillable steel joist
11459755 · 2022-10-04 · ·

A concrete fillable steel joist includes a generally U-shaped member and a top chord. The generally U-shaped member has spaced apart webs and a bottom chord. The top chord is operably attached to the U-shaped member. The top chord has a plurality of spaced apart top chord holes. The U-shaped member and the top chord define a volume that is fillable with concrete when opposed ends of the U-shaped member have joist ends operably attached thereto. The joist ends may be a pair of end plates. Alternatively, the joist ends may be structural members. A concrete fillable steel joist system includes a plurality of spaced apart concrete fillable steel joists, and metal decking. The metal decking is operably attached between the spaced apart steel joists. The concrete fillable steel joist and the metal decking are configured to receive concrete.

Concrete fillable steel joist
11459755 · 2022-10-04 · ·

A concrete fillable steel joist includes a generally U-shaped member and a top chord. The generally U-shaped member has spaced apart webs and a bottom chord. The top chord is operably attached to the U-shaped member. The top chord has a plurality of spaced apart top chord holes. The U-shaped member and the top chord define a volume that is fillable with concrete when opposed ends of the U-shaped member have joist ends operably attached thereto. The joist ends may be a pair of end plates. Alternatively, the joist ends may be structural members. A concrete fillable steel joist system includes a plurality of spaced apart concrete fillable steel joists, and metal decking. The metal decking is operably attached between the spaced apart steel joists. The concrete fillable steel joist and the metal decking are configured to receive concrete.

Modular system and kit for the dry building of structures for constructions, as well as a building method thereof
11391043 · 2022-07-19 ·

A modular system for the dry building of structures for constructions, such as walls, floors, balconies, roofs or the like, includes a plurality of planar modular beams that define a respective plane and that are mutually jointed, and a plurality of planar panels anchored thereto at least at or in proximity of the end portions of the same planar modular beams.

Drywall Spacing Joist Hanger

A connection utilizing a joist hanger to hang a joist or beam from a wood structural support member such as a top plate or header in cooperation with a first plurality of fasteners such as screws or nails and one or more substantially vertical fire-resistant panels such as drywall.

Drywall Spacing Joist Hanger

A connection utilizing a joist hanger to hang a joist or beam from a wood structural support member such as a top plate or header in cooperation with a first plurality of fasteners such as screws or nails and one or more substantially vertical fire-resistant panels such as drywall.

Structural frame for a building and method of constructing the same

A structural frame for a building, comprising: adjacent first and second columns; at least one precast concrete floor slab having first and second corner indents located in two adjacent corners and a first elongated edge beam defined between the first and second corner indents, the first elongated edge beam being disposed between the first and second columns such that the first and second columns are received in the first and second corner indents and that the first elongated edge beam abuts the first and second columns; and a first tendon assembly extending between the first and second columns and adapted to be tensioned to compress the first elongated edge beam between the first and second columns, the first tendon assembly including at least one left cable and at least one right cable located symmetrically on either sides of a vertical center plane of the first and second columns.

Structural frame for a building and method of constructing the same

A structural frame for a building, comprising: adjacent first and second columns; at least one precast concrete floor slab having first and second corner indents located in two adjacent corners and a first elongated edge beam defined between the first and second corner indents, the first elongated edge beam being disposed between the first and second columns such that the first and second columns are received in the first and second corner indents and that the first elongated edge beam abuts the first and second columns; and a first tendon assembly extending between the first and second columns and adapted to be tensioned to compress the first elongated edge beam between the first and second columns, the first tendon assembly including at least one left cable and at least one right cable located symmetrically on either sides of a vertical center plane of the first and second columns.

APPARATUS, SYSTEM, AND METHOD FOR CONSTRUCTION OF BUILDINGS AND STRUCTURES, E3-LUMBER
20220220740 · 2022-07-14 ·

E.sup.3Lumber is comprised by novel apparatuses as engineered wood systems, methods, apparatuses, tools, adhesives, and manufacturing for construction of structures. E.sup.3Lumber has standardization and optimization surpassing state-of-the-art construction. Each of those systems, methods, apparatuses, material compositions, and material stratifications utilize one-to-many apparatus relations. All formed or machined apparatuses feature innovative features like engineered constraints, multi-tier and hybrid composites, and constrained assembly all situated within novel methods like, the Three E, 4-Tier, Cross Datum Construction, E-Stud, E-Framing, E-Truss, E-Hips, E-Bridging, Continuous Truss methods meet national and international specifications. The Three E's of E.sup.3Lumber are environmental, economic, and engineering and are characteristics found throughout invention intended for the significant improvement of environmental conditions, wood products, and technologies. As a fact, E.sup.3Lumber use decreases deforestation by increasing growth periods of trees by decreasing biomass consumption and all the while providing economic incentive to become greener.

ARENA APPARATUS AND METHODS OF USING AND CONSTRUCTING SAME
20220195743 · 2022-06-23 · ·

An arena apparatus for staging a sport is provided. The apparatus includes a floor having a perimeter; and at least one wall coupled to the floor at the perimeter and extending upwardly and outwardly from the floor at an angle relative to an axis perpendicular to the floor, wherein the angle of the wall prevents an athlete from standing on the wall.