E21B43/10

Alternate path manifold life extension for extended reach applications

A technique facilitates formation of a gravel pack along relatively lengthy wellbores. According to an embodiment, a completion system comprises a screen assembly and an alternate path system disposed along the screen assembly. The alternate path system may include a transport tube and a packing tube placed in fluid communication at a manifold. The manifold is disposed along the screen assembly. In some embodiments, the completion system may comprise multiple screen assemblies with multiple corresponding manifolds. The packing tube is protected against erosion by a liner and a surrounding housing which are positioned to conduct fluid flow from the manifold as fluid flow moves from the transport tube, through the manifold, and into the packing tube during a gravel packing operation.

Alternate path manifold life extension for extended reach applications

A technique facilitates formation of a gravel pack along relatively lengthy wellbores. According to an embodiment, a completion system comprises a screen assembly and an alternate path system disposed along the screen assembly. The alternate path system may include a transport tube and a packing tube placed in fluid communication at a manifold. The manifold is disposed along the screen assembly. In some embodiments, the completion system may comprise multiple screen assemblies with multiple corresponding manifolds. The packing tube is protected against erosion by a liner and a surrounding housing which are positioned to conduct fluid flow from the manifold as fluid flow moves from the transport tube, through the manifold, and into the packing tube during a gravel packing operation.

SYSTEM AND METHODOLOGY TO COMBINE SAND CONTROL AND ZONAL ISOLATION FOR ARTIFICIAL LIFT SYSTEMS
20220389788 · 2022-12-08 ·

A tubular joint installable on a tubular string disposable within a wellbore. The tubular joint may include includes a perforated section, a filter section, and a packer. The perforated section may be proximate a first end and may include a first plurality of orifices to allow fluid communication between a bore of the tubular joint and a first area surrounding the tubular joint proximate the perforated section. The filter section may be proximate a second end and may include a filter assembly sized to filter fluid flowing into the bore via a second plurality of orifices from a second area proximate the filter section. The packer may be disposed between the perforated section and the filter section and may be operable to isolate the first area from the second area when the tubular string is disposed within the well.

Running tool for a liner string

A liner string for a wellbore includes a liner hanger assembly (LHA) and a liner hanger deployment assembly (LHDA) releasably attached to the LHA. The LHDA includes a central bore and a running tool moveable from a locked position to an unlocked position, the running tool including a flow path in communication with the central bore. The liner string further includes a chamber disposed between the LHDA and LHA, wherein the chamber is in selective fluid communication with the flow path. Wherein, when the flow path is closed, the chamber is isolated from the central bore, and when the flow path is open, the flow path provides fluid communication between central bore and chamber.

Running tool for a liner string

A liner string for a wellbore includes a liner hanger assembly (LHA) and a liner hanger deployment assembly (LHDA) releasably attached to the LHA. The LHDA includes a central bore and a running tool moveable from a locked position to an unlocked position, the running tool including a flow path in communication with the central bore. The liner string further includes a chamber disposed between the LHDA and LHA, wherein the chamber is in selective fluid communication with the flow path. Wherein, when the flow path is closed, the chamber is isolated from the central bore, and when the flow path is open, the flow path provides fluid communication between central bore and chamber.

LINER HANGER RUNNING TOOL

Liner hanger running tool (LHRT) having a mandrel with a central through-bore includes a transducer configured to identify a predetermined activation signal and, based on receipt of the predetermined activation signal, transmit an actuation signal. The LHRT also includes a power source. In addition, the LHRT includes a valve. Further, the LHRT includes an actuator configured to be operated by the power source and activated by the actuation signal from the transducer to close the valve in the central through-bore in the mandrel.

WELLBORE ANCHOR INCLUDING ONE OR MORE ACTIVATION CHAMBERS

Provided, in one aspect, is an anchor for use with a downhole tool in a wellbore. The anchor, according to this aspect, may include a base pipe; and one or more expandable chambers positioned radially about the base pipe. The one or more expandable chambers may, in some aspects, be configured to move from a first collapsed state to a second activated state; and the one or more expandable chambers may be operable to handle at least 20.7 Bar of internal pressure in the second activated state to engage a wall of a wellbore.

Port and snorkel for sensor array

An array of sensors provided on the outside of a tubular string for measuring a property within the tubular string. The array of sensors may include a plurality of connected sensors, wherein at least one of the plurality of connected sensors is at least partially encompassed in a shroud. A snorkel line may extend from the shroud, the snorkel line capable of coupling with a sensor port in a tubular of the tubular string. The snorkel line may establish fluid communication between one of the sensors at least partially encompassed in the shroud and a corresponding sensor port of a tubular in the tubular string.

Port and snorkel for sensor array

An array of sensors provided on the outside of a tubular string for measuring a property within the tubular string. The array of sensors may include a plurality of connected sensors, wherein at least one of the plurality of connected sensors is at least partially encompassed in a shroud. A snorkel line may extend from the shroud, the snorkel line capable of coupling with a sensor port in a tubular of the tubular string. The snorkel line may establish fluid communication between one of the sensors at least partially encompassed in the shroud and a corresponding sensor port of a tubular in the tubular string.

Methods for well construction and completion

There is provided a method for well construction comprising the steps of: a first phase of the well construction, in which a bottom hole assembly, BHA, with a first drill is used for drilling, and a conductor casing is lowered into the well and cemented; a second phase of the well construction, in which a second drill is used for drilling, wherein a production adapter base, PAB, is installed in parallel with lowering a blowout preventer, BOP; and a third phase of the well construction in which a third drill is used for drilling, for the steps of landing and geonavigation inside a reservoir.