E02D5/38

Anchor Assembly
20230392337 · 2023-12-07 ·

Anchor assembly for arrangement in seabed comprising a main tube provided with foldable wings movably arranged in recesses of the main tube by being hinged in upper end of the recesses, which wings in initial position is aligned with outer surface of the main tube, where the foldable wings are provided with a centered curved main support element extending in a plane perpendicular to inner surface of the wing and wherein rear part of the main support element is provided with a notch, constriction or recess determining the number of degrees the wing is to exhibit in relation to the main tube in deployed state.

Deformation-compliant rigid inclusions with embedded structural reinforcements

Soil inclusions (30) comprising an elongated, cured cementitious columnar body (72) are located within the soil (32) and include a tubular perforate structural reinforcement (56a, 56b) embedded within the body (72), with portions of the body exuded through the perforations (57) of the structural reinforcement (56a, 56b). The inclusions (30) are formed by driving a tubular mandrel (44) through vibratory means into the soil (32), with a flexible, tubular, perforate reinforcement (56a, 56b) about the exterior surface of the mandrel (44). When the mandrel (44) is fully driven, it is withdrawn, and simultaneously cementitious material (70) is injected into the mandrel (44). The material (70) exudes through the perforations (57) to complete the inclusion (30), which is deformation compliant. The inclusions may be installed in vertical or non-vertical orientations.

Deformation-compliant rigid inclusions with embedded structural reinforcements

Soil inclusions (30) comprising an elongated, cured cementitious columnar body (72) are located within the soil (32) and include a tubular perforate structural reinforcement (56a, 56b) embedded within the body (72), with portions of the body exuded through the perforations (57) of the structural reinforcement (56a, 56b). The inclusions (30) are formed by driving a tubular mandrel (44) through vibratory means into the soil (32), with a flexible, tubular, perforate reinforcement (56a, 56b) about the exterior surface of the mandrel (44). When the mandrel (44) is fully driven, it is withdrawn, and simultaneously cementitious material (70) is injected into the mandrel (44). The material (70) exudes through the perforations (57) to complete the inclusion (30), which is deformation compliant. The inclusions may be installed in vertical or non-vertical orientations.

Pile installation system

The invention relates to a pile installation system for providing a pile in the ground, comprising; an elongate pile installation tool for forming a bore hole and having a distal end, an end member for coupling to the distal end of the pile installation tool, and an electromagnetic device for releasable magnetically coupling the end member to the pile installation tool.

Pile installation system

The invention relates to a pile installation system for providing a pile in the ground, comprising; an elongate pile installation tool for forming a bore hole and having a distal end, an end member for coupling to the distal end of the pile installation tool, and an electromagnetic device for releasable magnetically coupling the end member to the pile installation tool.

Method and apparatus for forming cemented ground support columns
11085163 · 2021-08-10 · ·

A method and apparatus for forming cemented ground support columns is disclosed. Namely, driving mandrels are provided for the efficient construction of incrementally enlarged diameter support columns. For example, the driving mandrel includes a feed tube that has a top portion and an expansion head portion. The expansion head portion further includes an expansion (or compaction) chamber and a flexible tubular egress port. Further, construction methods are provided of using the driving mandrels for the efficient construction of incrementally enlarged diameter support columns.

CONSTRUCTION METHOD FOR POURING CONCRETE IN KARST CAVE

The present application discloses a construction method for pouring concrete in a karst cave. Concrete streaming is pumped into a hollow passage of a drill stem, then opens the one-way openable sealing cover with a pre-tensioned spring on a reaming drill bit and enters the karst cave to complete pouring of the concrete. When the karst cave is relatively low, low-slump plain concrete mixed with quick-setting agents is injected through a drilling rig and the hollow drill stem to form a concrete pier; when the karst cave is relatively high, the hollow drill stem is sleeved into a thin-walled steel shell, and the thin-walled steel shell is synchronously sunk into the drilled hole while drilling, enters the karst cave and is socketed into a stable rock stratum, then concrete is pumped into the thin-walled steel shell from the bottom of the pile, and finally, a reinforcement cage is inserted to form a cast-in-place pile. Compared with the existing karst cave treatment methods, the construction method according to the present application can greatly reduce the consumption of materials, improve the mechanization of construction, simplify the construction process, shorten the construction period and reduce the engineering cost, and the cast-in-place pile with thin-walled steel shell, formed when the karst cave is relatively high, can further improve the bearing capacity of the foundation.

CONSTRUCTION METHOD FOR POURING CONCRETE IN KARST CAVE

The present application discloses a construction method for pouring concrete in a karst cave. Concrete streaming is pumped into a hollow passage of a drill stem, then opens the one-way openable sealing cover with a pre-tensioned spring on a reaming drill bit and enters the karst cave to complete pouring of the concrete. When the karst cave is relatively low, low-slump plain concrete mixed with quick-setting agents is injected through a drilling rig and the hollow drill stem to form a concrete pier; when the karst cave is relatively high, the hollow drill stem is sleeved into a thin-walled steel shell, and the thin-walled steel shell is synchronously sunk into the drilled hole while drilling, enters the karst cave and is socketed into a stable rock stratum, then concrete is pumped into the thin-walled steel shell from the bottom of the pile, and finally, a reinforcement cage is inserted to form a cast-in-place pile. Compared with the existing karst cave treatment methods, the construction method according to the present application can greatly reduce the consumption of materials, improve the mechanization of construction, simplify the construction process, shorten the construction period and reduce the engineering cost, and the cast-in-place pile with thin-walled steel shell, formed when the karst cave is relatively high, can further improve the bearing capacity of the foundation.

SOIL-DISPLACEMENT DRILL, METHOD FOR CONVERTING A SOIL-DISPLACEMENT DRILL AND METHOD FOR FORMING A FOUNDATION PILE
20210189676 · 2021-06-24 ·

Soil-displacement drill (1) for soil-displacing drilling in a surface (10) in order to form a foundation pile (2), comprising a drill pipe (3), a drill head (4) at an end of the drill pipe (3) with several flap leaves (5) which are pivotable between a closed position for closing off the end of the drill pipe (3) and an open position for making this end freely accessible and one or several closing elements (6) to keep these flap leaves (5) in their closed position and prevent pivoting of the flap leaves (5) which are configured to fail during drilling into the surface (10) in such a way that these closing elements (6) do not impede pivoting of the flap leaves (5). In addition, the present invention relates to an assembly of a drill head (4) and one or several closing elements (6) for such a soil-displacement drill (1), a method for soil-displacing drilling and a method for converting a soil-displacement drill (1) to form such a soil-displacement drill (1).

Trough plate for constructing locked polymer anti-seepage wall and construction method of locked polymer anti-seepage wall

A trough plate for constructing a locked polymer anti-seepage wall includes a plate body, a guide tube, a grouting pipe and an anti-blocking head. A construction method of the locked polymer anti-seepage wall includes the steps of positioning an N.sup.th trough plate and then pressing the N.sup.th trough plate into ground, wherein N is a natural number larger than and equal to 1; engaging an (N+1).sup.th trough plate with the N.sup.th trough plate, and then pressing the (N+1).sup.th trough plate into the ground; connecting a grouting pipe of the N.sup.th trough plate with a grouting machine, pulling out the N.sup.th trough plate, and simultaneously grouting through the grouting pipe of the N.sup.th trough plate by the grouting machine; and repeating the steps (B) and (C) till the locked polymer anti-seepage wall is completed, wherein the steps (B) and (C) are repeated every time, N is automatically increased by 1.