Test system and test method for detecting cement content of cement mixing pile body in real time

The present invention discloses a test system and a test method for detecting the cement content of cement stirring pile body in real time at a construction site. The test system specifically includes a cement slurry density measuring apparatus and a cement admixing amount calculating apparatus. The method includes measuring the density of the cement slurry in the cement slurry tank, measuring the cement soil density and inputting measured values to calculate the cement content. The cement slurry density and the cement soil density can be detected in real time, so that the admixing amount of the cement can be detected in real time during the foundation reinforcing process of the underground engineering, convenience and rapidness are achieved, the time period is short, a supervision effect is good, and cheating on workmanship and materials can be effectively avoided.

System, method, and apparatus for permeation grouting
10106943 · 2018-10-23 · ·

An apparatus for remediation of soil includes a drum for storing chemical-permeation grout and a pump for pumping the chemical-permeation grout at a low pressure into a manchette delivery tube while the manchette delivery tube is inserted into the soil. There is a valve for controlling the low pressure and a meter for metering an amount of the chemical-permeation grout that is delivered into the soil.

System, method, and apparatus for permeation grouting
10106943 · 2018-10-23 · ·

An apparatus for remediation of soil includes a drum for storing chemical-permeation grout and a pump for pumping the chemical-permeation grout at a low pressure into a manchette delivery tube while the manchette delivery tube is inserted into the soil. There is a valve for controlling the low pressure and a meter for metering an amount of the chemical-permeation grout that is delivered into the soil.

Method for manufacturing an element comprising a grout activation cycle
20240318396 · 2024-09-26 ·

A method for manufacturing an element in a ground comprising a drilling step during which a grout comprising a first composition is introduced and after the drilling step, at least one grout activation cycle is performed during which at least part of the grout is pumped; a second composition configured to activate the grout by reacting with the first composition in order to initiate the hardening of said grout is added to the pumped grout; then the activated grout is introduced into the excavation; and after said at least one grout activation cycle, the activated grout is allowed to harden in order to form the element in the ground.

Water intake pipeline structure passing through soft foundation embankment below flood level and construction method

The present invention discloses a water intake pipeline structure passing through a soft foundation embankment below a flood level and a construction method. The water intake pipeline structure comprises: pipelines, a gate valve well, a concrete pipe bed, a high-pressure jet grouting pile continuous wall, cement deep mixing piles, geogrids, backfilling clay, a clay bound macadam and concrete key walls. After the embankment is broken and excavated to reach a pipeline embankment-passing design elevation, the cement deep mixing piles are fully disposed in a plum blossom type, and the high-pressure jet grouting pile continuous wall is disposed under the gate valve well. A plain concrete cushion layer, the gate valve well, the concrete key walls and the concrete pipe bed are poured, the water intake pipelines are installed, and the pipelines behind the gate valve well are wrapped with concrete. The geogrids are placed during clay backfilling, and layered soil filling is performed. An embankment top is restored by using the clay bound macadam. The gate valve well is provided with a gate valve, and an operating lever is connected onto the gate valve. The present invention further discloses the construction method of the water intake pipeline structure designed to pass through the soft foundation embankment below the flood level. The present invention can eliminate differential settlement of an embankment-passing section, cut off seepage channels in contact positions of the pipelines and the embankment body, and improve the anti-skid stability of an embankment slope, and meanwhile it is novel in structure and convenient to implement.

Water intake pipeline structure passing through soft foundation embankment below flood level and construction method

The present invention discloses a water intake pipeline structure passing through a soft foundation embankment below a flood level and a construction method. The water intake pipeline structure comprises: pipelines, a gate valve well, a concrete pipe bed, a high-pressure jet grouting pile continuous wall, cement deep mixing piles, geogrids, backfilling clay, a clay bound macadam and concrete key walls. After the embankment is broken and excavated to reach a pipeline embankment-passing design elevation, the cement deep mixing piles are fully disposed in a plum blossom type, and the high-pressure jet grouting pile continuous wall is disposed under the gate valve well. A plain concrete cushion layer, the gate valve well, the concrete key walls and the concrete pipe bed are poured, the water intake pipelines are installed, and the pipelines behind the gate valve well are wrapped with concrete. The geogrids are placed during clay backfilling, and layered soil filling is performed. An embankment top is restored by using the clay bound macadam. The gate valve well is provided with a gate valve, and an operating lever is connected onto the gate valve. The present invention further discloses the construction method of the water intake pipeline structure designed to pass through the soft foundation embankment below the flood level. The present invention can eliminate differential settlement of an embankment-passing section, cut off seepage channels in contact positions of the pipelines and the embankment body, and improve the anti-skid stability of an embankment slope, and meanwhile it is novel in structure and convenient to implement.

JET GROUTING METHOD, GROUND IMPROVEMENT BODY, AND GROUND IMPROVEMENT STRUCTURE
20180238011 · 2018-08-23 ·

A jet grouting method is capable of reducing an unnecessary portion (redundant portion) exceeding an effective wall thickness without narrowing a construction pitch, and capable of allowing easy mechanical control. A ground improvement structure including a plurality of ground improvement bodies is constructed through use of the jet grouting method. Each of the ground improvement bodies is constructed so as to have a sectional shape formed by a combination of different kinds of fan shapes having different radiuses. The sectional shape of the ground improvement body is a combination of at least two kinds of fan shapes. One of the kinds of the fan shapes corresponds to a fan shape with a smaller radius, and the other corresponds to a fan shape with a larger radius. The sectional shape of the improvement body has a minimum diameter portion formed of the fan shapes with the smallest radius and a maximum diameter portion formed of the fan shapes with the largest radius. When designing the ground improvement body, a central angle is determined from a fan shape having the smallest radius with respect to the effective wall thickness. When constructing the ground improvement body, a diameter thereof is controlled by stepwisely changing a rotation speed of the injection rod. At that time, a soil breaking achieved by an improving material injected at high pressure is monitored so as to check the diameter of the ground improvement body and the effective thickness thereof.

JET GROUTING METHOD, GROUND IMPROVEMENT BODY, AND GROUND IMPROVEMENT STRUCTURE
20180238011 · 2018-08-23 ·

A jet grouting method is capable of reducing an unnecessary portion (redundant portion) exceeding an effective wall thickness without narrowing a construction pitch, and capable of allowing easy mechanical control. A ground improvement structure including a plurality of ground improvement bodies is constructed through use of the jet grouting method. Each of the ground improvement bodies is constructed so as to have a sectional shape formed by a combination of different kinds of fan shapes having different radiuses. The sectional shape of the ground improvement body is a combination of at least two kinds of fan shapes. One of the kinds of the fan shapes corresponds to a fan shape with a smaller radius, and the other corresponds to a fan shape with a larger radius. The sectional shape of the improvement body has a minimum diameter portion formed of the fan shapes with the smallest radius and a maximum diameter portion formed of the fan shapes with the largest radius. When designing the ground improvement body, a central angle is determined from a fan shape having the smallest radius with respect to the effective wall thickness. When constructing the ground improvement body, a diameter thereof is controlled by stepwisely changing a rotation speed of the injection rod. At that time, a soil breaking achieved by an improving material injected at high pressure is monitored so as to check the diameter of the ground improvement body and the effective thickness thereof.

Process and assembly for determining the radius of a ground element which can be produced by jet grouting
10053831 · 2018-08-21 · ·

The invention relates to a method for determining the radius of a pile in the ground that can be produced by means of a jet-grouting process, comprising the steps of: introducing at least one level-measuring stick into the ground; sinking a jet-grouting tool (3) down to a defined distance from the level-measuring stick (4), the distance being less than a maximum range R of the grouting jet; pulling the jet-grouting tool (3) while performing a rotating or swivelling motion with the grouting jet activated, thereby producing vibrations as the grouting jet passes the level-measuring stick (4); and recording a signal representative of the vibrations at the at least one level-measuring stick (4) by means of a sensor (5) that is fastened to the level-measuring stick (4). The invention also relates to a corresponding arrangement (2) for determining the radius of a pile in the ground that can be produced by means of a jet-grouting process.

Process and assembly for determining the radius of a ground element which can be produced by jet grouting
10053831 · 2018-08-21 · ·

The invention relates to a method for determining the radius of a pile in the ground that can be produced by means of a jet-grouting process, comprising the steps of: introducing at least one level-measuring stick into the ground; sinking a jet-grouting tool (3) down to a defined distance from the level-measuring stick (4), the distance being less than a maximum range R of the grouting jet; pulling the jet-grouting tool (3) while performing a rotating or swivelling motion with the grouting jet activated, thereby producing vibrations as the grouting jet passes the level-measuring stick (4); and recording a signal representative of the vibrations at the at least one level-measuring stick (4) by means of a sensor (5) that is fastened to the level-measuring stick (4). The invention also relates to a corresponding arrangement (2) for determining the radius of a pile in the ground that can be produced by means of a jet-grouting process.