E02D5/46

Intelligent construction control method, apparatus and system for mixing pile with split-grouting

The present invention provides an intelligent construction control method, apparatus, and system for splitting jet grouting mixing piles, relating to geotechnical engineering. The method includes receiving real-time perception information from a construction information self-perception system, which includes drilling depth, drilling rig output power, drill bit torque, drill rod axial force, and pore water pressure of the drill bit. This information is input into a trained machine-learning model for stratum information, establishing a nonlinear implicit correspondence relationship between the perception information and construction stratum conditions, and outputting real-time stratum state information. The real-time stratum state information is then input into a trained self-matching machine-learning model for optimal construction parameters, establishing a nonlinear implicit correspondence relationship between the stratum state information and optimal construction parameters, and outputting current optimal construction parameters. This invention enables real-time intelligent inversion of stratum information and dynamic self-optimization control of construction parameters.