E02D2300/002

Drilling apparatus and PHC pipe cased pile, and method of drilling with PHC pipe cased pile

Provided is a drilling apparatus, comprising a PHC pipe cased pile having a drilling section for containing fluid and a hammer element arranged inside the cavity of the PHC pipe cased pile which moves along the drilling direction till the bottom of the drilling section. As the hammer element moves along the drilling direction till the bottom of the drilling section, a localized hydraulic force will be induced in the fluid contained in the drilling section of the PHC pipe cased pile by a sharp rise in the fluid pressure in addition to the impact force directly acted on the rock and soil by the hammer element. Under action of the hydraulic force and the impact force, the surrounding soft rock stratum could be crushed and the rock stratum with higher strength is left intact, that is, the drilling apparatus proceeds until harder rock. At this point, concrete casting will bond with the harder rock, resulting in a better bearing capacity of the PHC pipe cased pile foundation.

CEMENTITIOUS SLURRIES, METHODS, AND ASSEMBLIES FOR ELECTRICALLY GROUNDING AND CORROSION-PROTECTING A METALLIC STRUCTURE

A method for electrically grounding and corrosion-protecting a metallic structure includes combining a cementitious powder with water to form a cementitious slurry, applying the cementitious slurry to at least a section of the metallic structure, and curing the cementitious slurry to form a water impermeable and electrically conductive cementitious surround on the section. The cementitious powder includes a cement and a particulate carbonaceous material. The cementitious powder is combined with the water in a ratio of less than or equal to about 2.5 US gallons of water per 55 lb of cementitious powder.

FOUNDATION PIER SYSTEM AND METHOD
20170314225 · 2017-11-02 ·

A concentrically loaded foundation pier system which includes several concentrically stacked steel pipes filled with concrete. The entire pier is installed centrally beneath the footing of the structure. Shims are placed between the top-most pier element and a pier cap which prevents shifting when the soil expands and contracts. The final structure is end-loaded and pressed to the bedrock or other load-bearing strata. An alternative embodiment includes a temporary lifting assembly which can be fastened about the structural pier without need for bolts or other fasteners.

RETAINING WALL SYSTEM, METHOD OF SUPPORTING SAME, AND KIT FOR USE IN CONSTRUCTING SAME

A method is for supporting a retaining wall that includes a number of wall blocks positioned to retain material against a rear side of the plurality of wall blocks. The method includes attaching the rear side of at least one of the wall blocks to at least one ground-stabilizing base body supporting the wall blocks. Kits and systems are also disclosed.

Removable ground anchor body using rotation

Provided is a removable ground anchor body using a rotation wherein when a pc strand or a deformed steel bar is rotated, a screw bar is interlock-rotated to raise an operation member and sequentially raise a body and a wedge from the pc strand or the deformed steel bar thereby to release the connection state.

SEAWALL CONSTRUCTION USING CONCRETE FORMS
20220049451 · 2022-02-17 · ·

A method for constructing a seawall section includes coupling an end of a substantially-waterproof barrier member to a footing. A concrete form is mounted to the footing such that a top end of the form is higher than an exposed upper surface of the footing. The concrete form defines at least part of a fill volume. Another end of the barrier member is coupled to the concrete form such that the barrier member extends over a side of the concrete form opposite the fill volume. Concrete is then poured into the fill volume and cured to form the seawall section. Prior to the curing, a body of water at the footing may be higher than the upper surface of the footing. However, the barrier member prevents water from entering the fill volume through the concrete form.

STRUCTURAL SUPPORT AND STABILIZATION ASSEMBLIES AND METHODS FOR INSTALLING SAME
20220042273 · 2022-02-10 ·

A pier assembly for supporting a structure has a vertically oriented central axis and includes a plurality of horizontally spaced apart elongate members disposed in the ground and arranged about the central axis. Each elongate members directly contacts the ground. Each elongate member has a length-to-width ratio greater than 10.0.

PANEL PRODUCTION KITS, METHODS, AND SYSTEMS
20170247891 · 2017-08-31 ·

A method of forming a concrete panel that includes forming a concrete base with a plurality of holes, where the plurality of holes are distributed proximate to a perimeter of a casting surface of the concrete base, and securing casting rails along the casting surface of the concrete base to form a concrete panel form with a closed perimeter. The casting rails are secured using a plurality of anchors through the plurality of holes in the concrete base to couple the casting rails to the concrete base. A reinforcement device and/or an attachment device is introduced within the concrete panel form, and concrete is poured into the concrete panel form. After the poured concrete has solidified into a concrete panel, the concrete panel is removed.

Passive Grout Seal
20170241095 · 2017-08-24 ·

A passive annular grout seal assembly is disclosed for sealing an annular opening between a driven pile and a skirt pile sleeve for an offshore platform. The annular seals are located at the bottom of the pile sleeves near sea floor and automatically activated when piles are inserted and driven through the pile sleeves without any active operational procedure during offshore piling. The seal configuration fully utilizes the seal height, the grout column height and the density difference between grout and sea water to produce enhanced sealing capacity against the column of grout above.

Concrete seawall with precast components
11242662 · 2022-02-08 · ·

Seawalls and methods for making seawalls are disclosed. A seawall may include a concrete footing, with a first plurality of anchorages disposed in the concrete footing. A plurality of precast concrete tee beams may include single-tee beams and/or double-tee beams. Flanges of the tee beams may be positioned to form seaward and landward faces of the wall, and stems of the tee beams may be coupled to the footing between the seaward and landward faces. A second plurality of anchorages may be disposed at tops of the stems. Elongate steel components extend through the stems, and are tensioned between the first plurality of anchorages and the second plurality of anchorages. Interior fill may be disposed between the seaward and landward faces. One or more wave deflectors may be disposed above the tee beams.