E04B1/3527

Frame Systems for Building Structures
20170204597 · 2017-07-20 ·

A frame system for a building structure includes beam members. Each beam member comprises two opposed, parallel flanges. A web is interposed between the flanges. Spreader members comprise two opposed, parallel side flanges, a web interposed between the side flanges and two opposed end flanges bridging the side flanges at respective terminal ends of the web. The beam members and the spreader members are configured to be fastened to each other to form a frame assembly.

METHOD AND APPARATUS FOR RAISING A STRUCTURE
20170167129 · 2017-06-15 ·

A system and method for raising a structure, or part thereof, the system comprising vertical jack members connected and disposed about a rail system attached about the periphery of the structure. The vertical jack members comprise an outer sleeve and a slidable inner portion that is driven vertically by a jack screw and drive block. Extensible diagonal cross-braces stabilize the jack members and structure being raised.

Method and apparatus for raising a structure

A system and method for raising a structure, or part thereof, the system comprising vertical jack members connected and disposed about a rail system attached about the periphery of the structure. The vertical jack members comprise an outer sleeve and a slidable inner portion that is driven vertically by a jack screw and drive block. Extensible diagonal cross-braces stabilize the jack members and structure being raised.

Building construction method and lifting device
09631379 · 2017-04-25 ·

A lifting device for lifting an upper portion of a building which comprises a roof and a method of constructing a building using such a lifting device. The lifting device includes a base plate arranged to be mounted to an edge region of a support and a lifting platform attached to an actuator and capable of vertical movement by means of the actuator. The base plate has a first portion arranged to abut a substantially horizontal face of the support and a second portion arranged to abut a substantially vertical face of the support. The actuator is adjustably mounted to the base plate such that the position of the actuator is horizontally and/or vertically adjustable relative to the base plate to ensure a plumb lift.

Modular structure for providing on-site protection
12264487 · 2025-04-01 · ·

The present invention relates to a modular assembly, a site factory, for at least partially enclosing a site during construction of a structure. The modular assembly comprising: a plurality of portal frames, each portal frame comprising two columns and a roof beam, each column and roof beam comprising a plurality of pre-assembled units; a jack-up frame for each column; at least two first rails, each of the first rails being mounted to at least one of the roof beams; at least one second rail slidably mounted to the at least two first rails; and a plurality of panels of a flexible material configured to provide a full enclosure of the site and mounted above the roof beam. The or each second rail is configured to slidably receive at least one lifting device. The pre-assembled units are configured to be connected on site, and lifted using said jack-up frames, to form the portal frames, and wherein each first rail, and the or each second rail are configured to be mounted on the portal frames on site.

MODULAR STRUCTURE FOR PROVIDING ON-SITE PROTECTION
20250290335 · 2025-09-18 · ·

The present disclosure relates to a modular assembly, a site factory, for at least partially enclosing a site during construction of a structure. The modular assembly comprising: a plurality of portal frames, each portal frame comprising two columns and a roof beam, each column and roof beam comprising a plurality of pre-assembled units; a jack-up frame for each column; at least two first rails, each of the first rails being mounted to at least one of the roof beams; at least one second rail slidably mounted to the at least two first rails; and a plurality of panels of a flexible material configured to provide a full enclosure of the site and mounted above the roof beam. The or each second rail is configured to slidably receive at least one lifting device. The pre-assembled units are configured to be connected on site, and lifted using said jack-up frames, to form the portal frames, and wherein each first rail, and the or each second rail are configured to be mounted on the portal frames on site.