Patent classifications
E04B2005/176
Cellulose-based structural flooring panel assembly
A cellulose-based structural building panel assembly includes a cross-laminated timber (CLT) core which is reinforced with one or more post-tensioned tendons stressed to a pre-selected tensioning force, following the placement as part of the panel assembly. The tendons are provided within a sleeve which is grouted with a channel formed in an underside of the core and which after post-tensioning of tendons is infilled with a binder securing the tendons in a fully bonded configuration.
Concrete shearwall and assemblies thereof, and related methods
A shearwall assembly includes a first concrete and a second concrete column and a protrusion extending from a connection end of the respective concrete columns. Each protrusion has two side surfaces and a center surface. A pair of horizontal slab panels are positioned between the respective connecting ends of the first and second concrete columns and abutting the two side surfaces of the respective protrusions. A horizontal reinforcement extends from the center surface of the respective protrusions and between the respective trusses. Concrete is poured at a volume formed between the pair of horizontal slab panels and the first and second concrete columns.
Self-Lifting Concrete Form With Platform Adapted To Accommodate Horizontal Reinforcing Steel
A forming system includes a frame and two forming walls. The two forming walls are positioned at a distance from each other to define a first vertical wall course. One forming wall is supported by the frame such that the one forming wall can be translated toward or away from the respective other forming wall. The frame can be raised to raise the two forming walls to be positioned to pour a second vertical course on top of the first vertical course. The translation of the one forming wall allows for the pouring of the first vertical course with horizontally extending rebar that extends through the one forming wall outside of the first vertical wall course, to tie in to a subsequently poured floor slab. The translation permits the vertical raising of the one forming wall, without striking the extending rebar, to pour the second vertical course on the first vertical course. A worker's platform is provided that is supported by the frame and vertically movable by raising the frame. The worker's platform is located below the one forming wall on a side of the one forming wall opposite the respective other forming wall and is rollable or pivotal to also clear the extending rebar during raising of the frame.
LIFTING AND LEVELING INSERT FOR A PRECAST CONCRETE SLAB
An insert for lifting and leveling a precast concrete slab is provided. The insert includes a sleeve that extends through the concrete slab and has two distinct threaded portions on an inner surface of the sleeve. This configuration allows a lifting bolt to be positioned into an upper end of the sleeve to lift the concrete slab, and a different-sized leveling bolt to be positioned in the sleeve to selectively elevate or raise part of the concrete slab relative to a ground surface.
Building panel connector
A connector assembly is used to secure a building panel (e.g., building panel) to a building structural element. The connector assembly can be formed of structural materials to effectively transfer load between the panel and the structural element. The connector assembly can include one or more insulating materials to reduce heat transfer between the panel and the structural element.
POST-TENSION CONCRETE LEAVE OUT SPLICING SYSTEM AND METHOD
Devices, systems, and methods for constructing post-tensioned concrete slabs in a new floor construction that has a reduced gap distance between the slabs. The devices, systems, and methods can improve project construction time by reducing the time delay in accessing the floor underneath the slabs due to safety and/or weather conditions.
Pour stop anchor apparatus and system
Apparatus are provided for a curtain wall anchor system. The curtain wall anchor assembly may include various anchor configurations. Each anchor embodiment is intended to reduce labor time and costs and eliminate extraneous steps in the construction process involving curtain walls. Each possible anchor assembly also features an optional component of attaching a concrete anchor for optimizing load paths and solving issues of bending in traditional edge angle pour stops.
Composite joist floor system
Embodiments of the present invention provide systems for connecting a flooring system to a vertical wall. In one embodiment the building structure includes a floor comprising a cementitious slab and a wall supporting at least a portion of the cementitious slab. A plurality of stand-off fasteners extend from the top of the wall into the cementitious slab and are configured to transfer forces between the cementitious slab and the wall. The stand-off fasteners comprise a lower portion and an upper stand-off portion. The lower portion is operatively coupled to the top of the wall, and the upper stand-off portion extends above the top of the wall and is encapsulated within the cementitious slab. In some embodiments, at least a portion of the lower portion is heat treated to a higher degree of hardness relative to the remainder of the stand-off screw.
Post-tension concrete leave out splicing system and method
Devices, systems, and methods for constructing post-tensioned concrete slabs in a new floor construction that has a reduced gap distance between the slabs. The devices, systems, and methods can improve project construction time by reducing the time delay in accessing the floor underneath the slabs due to safety and/or weather conditions.
Pour Stop Anchor Apparatus And System
Apparatus are provided for a curtain wall anchor system. The curtain wall anchor assembly may include various anchor configurations. Each anchor embodiment is intended to reduce labor time and costs and eliminate extraneous steps in the construction process involving curtain walls. Each possible anchor assembly also features an optional component of attaching a concrete anchor for optimizing load paths and solving issues of bending in traditional edge angle pour stops.