E21D9/128

LOADING ARM ASSEMBLY AND METHOD OF USE
20190390549 · 2019-12-26 ·

A loading arm assembly for directing material removed by a mining machining having a cutting head and a conveyor assembly includes a loading arm assembly that includes a loading arm and a spacer connector. The loading arm is configured to be removably attachable to the spacer connector and the spacer connector is configured to be removably attachable to a gear box or other driving mechanism of the mining machine. A centering cap assembly can also be used to assist in centering the loading arm-spacer connector combination, the centering cap assembly being removably attachable to the gear box.

Projectile drilling system

Systems for drilling or tunneling include an assembly for accelerating a projectile through a first conduit into a region of geologic material, which generates debris. The debris may be reduced in size by moving the debris to a crushing device located in a second conduit using a conveying device, such as an auger. The reduced-size debris is then moved toward the surface using fluid movement. A third conduit may be used to provide and remove material from the bottom of the first conduit to control pressure at the end of the conduit to prevent ingress of material into the first conduit. Water jets or other types of devices may be used to cut or deform a perimeter of a region of geologic material before the projectile is accelerated to control the shape of the borehole and the manner in which debris is broken from the geologic material.

Tunneling and mining method using pre-conditioned hole pattern

Systems for forming or extending a tunnel or shaft within geologic material may include a ram accelerator assembly for accelerating one or more projectiles into geologic material to weaken a region of the geologic material. The projectile(s) pre-condition the geologic material, such as by forming one or more holes in a central region of the material or to define a perimeter of the region to be displaced. A cutting tool or subsequent projectile impacts may then be used to remove the weakened material. The voids formed by the first projectile(s) cause compressive forces from subsequent impacts or cutting operations to be converted to tension forces that more efficiently break geologic material, which may fall into the voids created by the first projectile(s). The voids created by the projectile impacts may also control the material that is removed and the shape of a resulting section of the tunnel or shaft.

Projectile augmented boring system
12049825 · 2024-07-30 · ·

Systems for forming or extending a tunnel or shaft within a working surface may include a ram accelerator assembly for accelerating a projectile into geologic material to weaken a region of the geologic material. A cutting tool may then be used to remove the weakened material. A collection assembly may be used to move debris away from the working surface while the projectile and cutting operations are performed to enable generally continuous use of the system. The number of projectiles that are accelerated and the rate at which projectiles are used may be controlled based on characteristics of the geologic material and the rate at which created debris may be removed.

Control system for material gathering mechanism

A control system for a material gathering mechanism includes a gathering head configured to gather material from aground surface, a plurality of gathering members configured to transport the material gathered by the gathering head towards a material conveying apparatus, and a jam detection device for detecting a jam condition in movement of one or more of the plurality of gathering members and generate signals indicative of the jam condition. The control system further includes a controller communicably coupled to the plurality of gathering members and the jam detection member. The controller receives signals indicative of the jam condition from the jam detection device. The controller initiates a sequence of stopping, delaying, and restarting the gathering member on receiving the signals indicative of the jam condition.

MINING MACHINE WITH ARTICULATING BOOM AND INDEPENDENT MATERIAL HANDLING SYSTEM
20180051562 · 2018-02-22 ·

A cutting assembly for a rock excavation machine including a frame. The cutting assembly includes a boom supported on the frame and a cutting device. In some aspects, the boom includes a first portion and a second portion, and the first portion includes a first structure and a second structure slidable relative to the first structure. The second portion includes a first member pivotably coupled to the second structure, and a second member pivotably coupled to the first member. The cutting device is supported on the second member. In some aspects, a material handling device is supported independently of the boom and movable between a retracted position and an extended position independent of the boom.