Patent classifications
E02D5/12
SHEET PILE BULKHEAD SYSTEMS AND METHODS
A system that includes a plurality of front faces configured to be arranged end-to-end in a series. Adjacent front faces are connected together by a different X-shaped or X-wye connector that facilitates installation of reinforcement tail walls. At least one tail wall is connected to each connector. A redundant reinforcing tail wall may be constructed and attached to one of the connectors to provide alternative load path(s).
Method for forming a pile wall in ground and a corresponding pile wall
A method for forming a drilled pile wall in ground using a drilling device having a reamer and flushing with a medium to remove drilling waste during drilling, and non-rotating pipe piles equipped with interlocks. A vertical 1 hole is drilled while simultaneously placing a pipe pile in the drill hole. At least one subsequent vertical hole is drilled hole in the ground side by side with the drill hole while simultaneously placing a subsequent pipe pile in the subsequent drill hole while the interlocks of the subsequent pipe pile interlock with interlocks of the pipe pile to guide the subsequent pipe pile into the drill hole. Reinforcements are installed in the drill holes, concrete is cast into each pipe pile to form a concrete pile, and at least some of the pipe piles are lifted at least partly out of the drill hole after the concrete has been cast, but before the concrete has bonded rigid to form a unified watertight pile wall. The invention also relates to a pile wall.
Method for forming a pile wall in ground and a corresponding pile wall
A method for forming a drilled pile wall in ground using a drilling device having a reamer and flushing with a medium to remove drilling waste during drilling, and non-rotating pipe piles equipped with interlocks. A vertical 1 hole is drilled while simultaneously placing a pipe pile in the drill hole. At least one subsequent vertical hole is drilled hole in the ground side by side with the drill hole while simultaneously placing a subsequent pipe pile in the subsequent drill hole while the interlocks of the subsequent pipe pile interlock with interlocks of the pipe pile to guide the subsequent pipe pile into the drill hole. Reinforcements are installed in the drill holes, concrete is cast into each pipe pile to form a concrete pile, and at least some of the pipe piles are lifted at least partly out of the drill hole after the concrete has been cast, but before the concrete has bonded rigid to form a unified watertight pile wall. The invention also relates to a pile wall.
Sheet pile bulkhead systems and methods
A system that includes a plurality of front faces configured to be arranged end-to-end in a series. Adjacent front faces are connected together by a different X-shaped or X-wye connector that facilitates installation of reinforcement tail walls. At least one tail wall is connected to each connector. A redundant reinforcing tail wall may be constructed and attached to one of the connectors to provide alternative load path(s).
Sheet pile bulkhead systems and methods
A system that includes a plurality of front faces configured to be arranged end-to-end in a series. Adjacent front faces are connected together by a different X-shaped or X-wye connector that facilitates installation of reinforcement tail walls. At least one tail wall is connected to each connector. A redundant reinforcing tail wall may be constructed and attached to one of the connectors to provide alternative load path(s).
Method of moving a component or a material to and within a level of a shaft boring system
A method of moving a component or a material to and within a level of a shaft boring system. The shaft boring system is positioned within a shaft and the method comprises lowering the component or the material inside a cage into the shaft and to a level of the shaft boring system. The method further comprises suspending the component or the material from a transport system within the level of the shaft boring system. In addition, the method comprises moving the component or the material within the level of the shaft boring system using the transport system. The component is a component of the shaft boring system and the material is a material for forming the shaft boring system.
METHOD FOR FORMING A PILE WALL IN GROUND AND A CORRESPONDING PILE WALL
A method for forming a drilled pile wall in ground using a drilling device having a reamer and flushing with a medium to remove drilling waste during drilling, and non-rotating pipe piles equipped with interlocks. A vertical 1 hole is drilled while simultaneously placing a pipe pile in the drill hole. At least one subsequent vertical hole is drilled hole in the ground side by side with the drill hole while simultaneously placing a subsequent pipe pile in the subsequent drill hole while the interlocks of the subsequent pipe pile interlock with interlocks of the pipe pile to guide the subsequent pipe pile into the drill hole. Reinforcements are installed in the drill holes, concrete is cast into each pipe pile to form a concrete pile, and at least some of the pipe piles are lifted at least partly out of the drill hole after the concrete has been cast, but before the concrete has bonded rigid to form a unified watertight pile wall.
METHOD FOR FORMING A PILE WALL IN GROUND AND A CORRESPONDING PILE WALL
A method for forming a drilled pile wall in ground using a drilling device having a reamer and flushing with a medium to remove drilling waste during drilling, and non-rotating pipe piles equipped with interlocks. A vertical 1 hole is drilled while simultaneously placing a pipe pile in the drill hole. At least one subsequent vertical hole is drilled hole in the ground side by side with the drill hole while simultaneously placing a subsequent pipe pile in the subsequent drill hole while the interlocks of the subsequent pipe pile interlock with interlocks of the pipe pile to guide the subsequent pipe pile into the drill hole. Reinforcements are installed in the drill holes, concrete is cast into each pipe pile to form a concrete pile, and at least some of the pipe piles are lifted at least partly out of the drill hole after the concrete has been cast, but before the concrete has bonded rigid to form a unified watertight pile wall.
SHEET PILE BULKHEAD SYSTEMS AND METHODS
A system that includes a plurality of front faces configured to be arranged end-to-end in a series. Adjacent front faces are connected together by a different X-shaped or X-wye connector that facilitates installation of reinforcement tail walls. At least one tail wall is connected to each connector. A redundant reinforcing tail wall may be constructed and attached to one of the connectors to provide alternative load path(s).
SHEET PILE BULKHEAD SYSTEMS AND METHODS
A system that includes a plurality of front faces configured to be arranged end-to-end in a series. Adjacent front faces are connected together by a different X-shaped or X-wye connector that facilitates installation of reinforcement tail walls. At least one tail wall is connected to each connector. A redundant reinforcing tail wall may be constructed and attached to one of the connectors to provide alternative load path(s).