E04G2011/505

Form bracket for concrete panel form

A form bracket for supporting a wall of a concrete panel form at a casting slab includes a first planar member having a lower surface configured to engage a casting slab. A second planar member is coupled with the first planar member. The second planar member has a front surface disposed perpendicular to the lower surface of the first planar member and configured to engage a wall of a concrete panel form. In some implementations, the first and second planar members have different dimensions so as to be capable of being reoriented to accommodate different sized walls. A pair of support members extend between an upper portion of the first planar member and a rear portion of the second planar member. The pair of support members are spaced apart to define a void that is configured to matably receive a second form bracket in a stacked arrangement.

Prop head assembly
11686108 · 2023-06-27 · ·

An apparatus includes a construction column configured to extend perpendicular relative to a ground surface, a construction beam assembly configured to be positioned perpendicular relative to the construction column, and a prop head assembly configured to be fixedly connected to an upper end portion of the construction column and to support the end portion of the construction beam assembly. The prop head assembly defines first and second recesses configured to selectively receive a pin of the construction beam assembly therein.

Load Bearing Components and Safety Deck of an Integrated Construction System
20220341192 · 2022-10-27 ·

Various implementations described herein are directed to a load bearing ledger fitting, a modular header beam, a perimeter safety deck, a multi-purpose bearing plate, and a mega-shore bearing plate of an integrated construction system.

CONSTRUCTION COMPONENT
20220282503 · 2022-09-08 ·

A prop head assembly is configured to be fixedly connected to a vertically-extending construction column, and also configured to support a horizontal construction beam assembly once the prop head assembly is fixedly connected to the vertically-extending construction column. The prop head assembly includes a first beam-locating feature and a second beam-locating feature. The first beam-locating feature is configured to selectively receive, at least in part, a beam-reference portion. The second beam-locating feature is also configured to receive the beam-reference portion once the beam-reference portion is inadvertently displaced away from the first beam-locating feature and from the vertically-extending construction column and toward the second beam-locating feature.

Fitting Ring
20220243486 · 2022-08-04 ·

Various implementations described herein are directed to a load bearing ledger fitting, a modular header beam, a perimeter safety deck, a multi-purpose bearing plate, and a mega-shore bearing plate of an integrated construction system.

FORM BRACKET FOR CONCRETE PANEL FORM
20220235564 · 2022-07-28 ·

A form bracket for supporting a wall of a concrete panel form at a casting slab includes a first planar member having a lower surface configured to engage a casting slab. A second planar member is coupled with the first planar member. The second planar member has a front surface disposed perpendicular to the lower surface of the first planar member and configured to engage a wall of a concrete panel form. In some implementations, the first and second planar members have different dimensions so as to be capable of being reoriented to accommodate different sized walls. A pair of support members extend between an upper portion of the first planar member and a rear portion of the second planar member. The pair of support members are spaced apart to define a void that is configured to matably receive a second form bracket in a stacked arrangement.

PROP HEAD ASSEMBLY
20220098882 · 2022-03-31 ·

An apparatus includes a construction column configured to extend perpendicular relative to a ground surface, a construction beam assembly configured to be positioned perpendicular relative to the construction column, and a prop head assembly configured to be fixedly connected to an upper end portion of the construction column and to support the end portion of the construction beam assembly. The prop head assembly defines first and second recesses configured to selectively receive a pin of the construction beam assembly therein.

Load bearing components and safety deck of an integrated construction system
11306492 · 2022-04-19 · ·

Various implementations described herein are directed to a load bearing ledger fitting, a modular header beam, a perimeter safety deck, a multi-purpose bearing plate, and a mega-shore bearing plate of an integrated construction system.

Modular ledgers of an integrated construction system
11293194 · 2022-04-05 · ·

Various implementations described herein are directed to a modular ledger of an integrated construction system. In one implementation, the modular ledger includes a rail, having a first end and a second end. Each end of the rail is configured to receive a coupling component. The rail has a plurality of holes configured to couple to bracing components of the integrated construction system.

ADJUSTABLE BEAM

An adjustable beam may include an elongate member extending between a first end and a second end, a first connector pivotably coupled to the first end, and a second connector pivotably coupled to the second end. The first and second connectors each are configured to be releasably coupled to neighboring supporting beams and other adjustable beams.