E21B33/0355

Systems and methods for initiating an emergency disconnect sequence

Systems and methods for initiating an emergency disconnect sequence (EDS) are provided. In an aspect, a disconnection system is provided and configured to initiate the EDS, and includes a controller including a processor and a memory operably coupled to the processor. The controller receives, from a set of motion reference units (MRU(s)) operably coupled to a flexible joint, position data generated by the set of motion references units and associated with the joint when the joint is operably coupled to and disposed between a drilling riser and a lower marine riser package (LMRP). The controller determines, based on the position data, an angular offset of the joint. The controller sends, to a subsea control pod disposed at or adjacent to the LMRP, a trigger signal in response to determining that the angular offset exceeds a predetermined threshold, such that the subsea control pod initiates the EDS.

Systems and processes for subsea managed pressure operations

Systems and processes for subsea marine managed pressure operations. One system includes a modified riser joint configured to fluidly connect inline with one or more riser joints. The modified riser joint and the one or more riser joints are connected to form a riser connecting a floating vessel with a wellhead. The system further includes a subsea pressure management sub-system configured to be operatively and fluidly connected to the modified riser joint at a subsea location.

A Subsea Deployable Installation and Workover Control System Skid and Method of Installation Thereof
20220389794 · 2022-12-08 ·

The invention relates to a subsea deployable installation and workover control system (IWOCS) skid (1) for connection to a subsea component (2), the skid (1) comprising: a wireless communication unit (3) for communication with a wireless communication unit (4) at a topside installation (10); a control system (69) for data storage and/or data filtering and transferring the filtered data to the wireless communication unit (3) and receiving data from the wireless communication unit (3); a self-contained fluid system comprising a fluid supply tank (5, 8), the fluid system being configured to be connected to a fluid connection on the subsea component such as to provide fluid to the subsea component (2); an electric power source (7) for supplying electric power to the communication unit (3) and the control system (69). It is further described a method of performing installation or workover operation(s) on a subsea component using an installation workover control system (IWOCS) skid.

BARRIER ARRANGEMENT IN WELLHEAD ASSEMBLY

A subsea wellhead assembly having an arrangement of primary well barriers provided in equipment that is located within the well and/or the wellhead housing is provided. The subsea wellhead assembly may include a tubing hanger positioned in or below a wellhead housing coupled to a subsea well, a tree cap fluidly coupled to the tubing hanger and disposed atop the wellhead housing, and a pair of master production valves configured to be selectively actuated from an open position to a closed position to shut in the subsea well, each of the pair of master production valves located within or below the wellhead housing.

CONTROL SYSTEM FOR A WELL CONTROL DEVICE
20220381111 · 2022-12-01 ·

A control system automatically operates a subsea well control device on detecting that a load in an Intervention Riser System (IRS) coupled to the subsea well control device has reached a threshold. The control system has a first control unit to detect that the load in the IRS has reached the threshold and a second control unit triggering actuation of the subsea well control device. The first control unit is in communication with the second control unit and issues an activation command to the second control unit to cause it to trigger actuation of the subsea well control device. The first control unit automatically issues the activation command to the second control unit upon detecting that the load in the IRS has reached the threshold, to trigger actuation of the subsea well control device prior to structural failure of an IRS.

Flow induced vibration reduction

A method and apparatus are disclosed for reducing flow induced vibration in at least one subsea structure. The method comprises the steps of, via at least one subsea acoustic sensor (190), detecting at least one characteristic associated with acoustic energy in sea water proximate to the sensor (190), responsive to the detected characteristic, varying at least one operational parameter of a fluid flowing along a fluid flow pathway associated with a pipe member (160).

CONTROL SYSTEM FOR A WELL CONTROL DEVICE
20220372831 · 2022-11-24 ·

A control system for automatically operating a well control device located in a subsea blow-out preventer (BOP), has a first control unit and a second control unit. The first control unit is connected to the second control unit and issues an activation command to the second control unit to cause it to trigger actuation of the well control device, and the first control unit is configured to automatically issue the activation command to the second control unit on detecting issue of the signal indicative of a requirement to trigger actuation of the subsea BOP shear mechanism.

Hybrid hydraulic accumulator
11506226 · 2022-11-22 ·

An exemplary hybrid accumulator includes a piston slidably disposed in a cylinder and separating a reservoir from a pressure chamber, in use, a hydraulic fluid disposed in the reservoir and a spring disposed in the pressure chamber to act on the piston and pre-charge the hydraulic fluid to a first pressure, and a heating element in communication with the pressure chamber to increase pressure in the pressure chamber when the heating element is initiated.

AUTONOMOUS BLOWOUT PREVENTER

A BOP system is provided with sensors distributed along a length of a subsea blowout preventer to monitor objects within a blowout preventer and measure critical parameters. A subsea computer is programmed to detect a speed and direction of an object within the BOP. The computer is programmed to detect movement of an object that is not produced by the drilling rig.

Wellhead systems and methods

A wellhead system includes a wellhead including a position sensor disposed in an inner surface of the wellhead, and a wellhead component to be installed in the wellhead, the wellhead component including a position indicator disposed in an outer surface of the wellhead component, wherein the position sensor is configured to transmit a position signal in response to the wellhead component entering into a predetermined aligned position in the wellhead.