E04B2001/2688

Hydraulic expandable connector
11643804 · 2023-05-09 · ·

A hydraulic expandable connector for taking up a slack in a tie rod in a hold-down system includes an inner cylindrical body disposed within an outer cylindrical body; a first actuation spring operably attached to the inner cylindrical body and the outer cylindrical body to urge relative motion between the inner cylindrical body and the outer cylindrical body such that the connector expands axially to take up the slack; a first chamber and a second chamber disposed between an outer wall surface of the inner cylindrical body and an inner wall surface of the outer cylindrical body; a first passageway communicating between the first chamber and the second chamber; and a valve operably disposed in the first passageway in an open position when the connector expands and a closed position when the connector is subjected to an axial load.

REINFORCED BUILDING WALL
20220243458 · 2022-08-04 ·

A reinforced building wall comprises a foundation; an anchor rod extending from the foundation; a first stud wall disposed above the foundation, the first stud wall including a first bottom plate and a first top place; a second stud wall disposed above the first stud wall, the second stud wall including a second bottom plate and a second top plate; the first tie rod including first and second threaded end portions, the first end portion is operably connected to the anchor rod; a second tie rod including third and fourth threaded end portions, the third end portion is operably connected to the second end portion of the first tie rod; the second tie rod including an outer end portion operably attached to the second stud wall; an intermediate portion of the first tie rod is unthreaded and comprises at least about 75% of the length of the first tie rod; and an intermediate portion of the second tie rod is unthreaded and comprises at least about 75% of the length of the second tie rod.

Reinforced building wall
11268273 · 2022-03-08 · ·

A reinforced building wall comprises a foundation; an anchor rod extending from the foundation; a first stud wall disposed above the foundation, the first stud wall including a first bottom plate and a first top place; a second stud wall disposed above the first stud wall, the second stud wall including a second bottom plate and a second top plate; the first tie rod including first and second threaded end portions, the first end portion is operably connected to the anchor rod; a second tie rod including third and fourth threaded end portions, the third end portion is operably connected to the second end portion of the first tie rod; the second tie rod including an outer end portion operably attached to the second stud wall; an intermediate portion of the first tie rod is unthreaded and comprises at least about 75% of the length of the first tie rod; and an intermediate portion of the second tie rod is unthreaded and comprises at least about 75% of the length of the second tie rod.

Hold down system and building using the same
11136754 · 2021-10-05 · ·

A fastener assembly comprises a first cylindrical member disposed within a second cylindrical member. One of the first and second cylindrical members is movable relative to the other in a first direction. The other one of the first and second cylindrical members is locked relative to the one in a second direction opposite to the first direction. A spring is operably attached to the first and second cylindrical members to urge one of the first and second cylindrical members in the first direction. A removable member is operably associated with the first and second cylindrical members to prevent one of the first and second cylindrical members from moving in the first direction prior to removing the removable member. The removable member is configured to be pulled out to allow one of the first and second cylindrical members to move in the first direction.

HYDRAULIC EXPANDABLE CONNECTOR
20210395998 · 2021-12-23 ·

A hydraulic expandable connector for taking up a slack in a tie rod in a hold-down system includes an inner cylindrical body disposed within an outer cylindrical body; a first actuation spring operably attached to the inner cylindrical body and the outer cylindrical body to urge relative motion between the inner cylindrical body and the outer cylindrical body such that the connector expands axially to take up the slack; a first chamber and a second chamber disposed between an outer wall surface of the inner cylindrical body and an inner wall surface of the outer cylindrical body; a first passageway communicating between the first chamber and the second chamber; and a valve operably disposed in the first passageway in an open position when the connector expands and a closed position when the connector is subjected to an axial load.

HYDRAULIC EXPANDABLE CONNECTOR
20210395999 · 2021-12-23 ·

A hydraulic expandable connector for taking up a slack in a tie rod in a hold-down system includes an inner cylindrical body disposed within an outer cylindrical body; a first actuation spring operably attached to the inner cylindrical body and the outer cylindrical body to urge relative motion between the inner cylindrical body and the outer cylindrical body such that the connector expands axially to take up the slack; a first chamber and a second chamber disposed between an outer wall surface of the inner cylindrical body and an inner wall surface of the outer cylindrical body; a first passageway communicating between the first chamber and the second chamber; and a valve operably disposed in the first passageway in an open position when the connector expands and a closed position when the connector is subjected to an axial load.

REINFORCED STUD-FRAMED WALL
20210148107 · 2021-05-20 ·

A reinforced stud-framed wall, including a bottom plate; first and second vertical studs; a member supported on the bottom plate, the member having a compression strength greater than a compression strength of the bottom plate; the first vertical stud having a bottom end supported on the member with a first contact area, whereby a load on the first contact area is spread over a first area on the bottom plate larger than the first contact area; and the second vertical stud having a bottom end supported on the member with a second contact area, whereby a load on the second contact area is spread over a second area on the bottom plate larger than the second contact area.

FASTENERS AND SPRINGS FOR BUILDING WALL REINFORCEMENT
20230407620 · 2023-12-21 ·

A building wall includes a stud wall with a horizontal wall member; a tie rod operably anchored in a foundation, the tie rod extending through the wall member; a first fastener and a second fastener attached to the tie rod, the first fastener and the second fastener being slidable down the tie rod, first fastener being operably disposed on the wall member and lockable to the tie rod in an upward direction to resist uplift forces from the stud wall, and the second fastener being disposed above the first fastener resist the spring; and a spring operably operating on the first fastener and the second fastener to urge the first fastener downwardly toward the wall member, the second fastener being disposed above the first fastener and lockable to the tie rod in the upward direction to restrain the spring.

HOLD DOWN SYSTEM WITH DISTRIBUTED LOADING FOR BUILDING WALLS
20210002889 · 2021-01-07 ·

A hold down system for a building wall comprises a first rigid member and a second rigid member, the second rigid member being vertically spaced apart from the first rigid member, the first rigid member is supported on a horizontal member of a stud wall, the first and second rigid members including first and second openings, respectively; a tie-rod with a lower end portion for being anchored to an anchorage, the tie-rod extending transversely through the first and second openings, the tie-rod dividing the first and second rigid members into a first lateral section on one side of the tie-rod and a second lateral section on a diametrically opposite side of the tie-rod; first support and second support disposed between the first and second rigid members, the first support being disposed in the first lateral section, the second support being disposed in the second lateral section, the tie-rod extending through the first and second rigid members outside of the first support or the second support; and a nut threaded to the tie-rod, the nut exerting pressure on the second rigid member to place the tie rod under tension loading, the tension loading is transferred by the second rigid member to the first and second supports to subject the first and second supports to compression loading, thereby causing the first rigid member to press on the horizontal member of the stud wall via the first and second lateral sections of the first rigid member, thus distributing the compression loading.

Reinforced stud-framed wall
10870978 · 2020-12-22 · ·

A reinforced stud-framed wall, including a bottom plate; first and second vertical studs; a member supported on the bottom plate, the member having a compression strength greater than a compression strength of the bottom plate; the first vertical stud having a bottom end supported on the member with a first contact area, whereby a load on the first contact area is spread over a first area on the bottom plate larger than the first contact area; and the second vertical stud having a bottom end supported on the member with a second contact area, whereby a load on the second contact area is spread over a second area on the bottom plate larger than the second contact area.