F24T2010/56

Method of deploying a heat exchanger pipe
11639814 · 2023-05-02 · ·

A new system for and a method of deploying a heat exchanger pipe. A bore hole is drilled from an access ditch location to a terminal ditch location using a piloted drill head powered via an umbilical attached to the piloted drill head. A casing is attached to the piloted drill head and disposed about the umbilical into the bore hole from the access ditch location to the terminal ditch location. At the terminal ditch location, the piloted drill head is removed from the casing and the umbilical and a heat exchanger pipe is attached to the umbilical. The umbilical is withdrawn from within the casing deployed in the bore hole to pull the heat exchanger pipe into the casing. The casing is then withdrawn from the bore hole leaving the heat exchanger pipe in the bore hole.

GEOTHERMAL HEAT EXTRACTOR
20230194127 · 2023-06-22 ·

A geothermal heat extractor includes a heat transfer fluid and a heat transfer fluid supply conduit. The heat transfer fluid is maintained in the supply conduit in a liquid state at a pressure above its saturation pressure. The geothermal heat extractor further includes a heat transfer fluid return conduit, a geothermal heat source coupled thereto, at least one flow control valve configured to control the flow of the heat transfer fluid from the supply conduit to the return conduit, and an external load coupled to the return conduit. As the heat transfer fluid is provided to the return conduit in the liquid state, the heat transfer fluid vaporizes in the return conduit by heat supplied to the return conduit from the geothermal heat source. The vaporized heat transfer fluid is supplied from the return conduit to the external load.

GEOTHERMAL POWER PLANT SYSTEM
20230184465 · 2023-06-15 ·

Provided is a geothermal power plant system configured to generate power by treating heat source water, including: a cyclone solid-liquid separation unit configured to separate solid substances inside the heat source water from the heat source water; and a heat exchanging unit configured to perform heat exchange on the heat source water from the cyclone solid-liquid separation unit. The geothermal power plant system may include a gas-liquid separation unit configured to separate gaseous substances from heat source water supplied to the cyclone solid-liquid separation unit.

Well completion converting a hydrocarbon production well into a geothermal well

A well completion to convert a hydrocarbon production well into a geothermal well includes flow tubes to transport a working fluid through the well and a heat exchanger at a downhole location coupled to the flow tubes to exchange heat of the formation at the downhole location with the working fluid. A heat exchange fluid surrounds the heat exchanger at the downhole location to be heated by the formation at the downhole location. The heat exchanger heats the working fluid to a state in which the working fluid rises to the surface. At the surface, a power plant uses the heated working fluid to generate work. The working fluid is then cooled and returned to the downhole location to repeat the work generation cycle.

DATA CENTER GEOTHERMAL COOLING
20170293330 · 2017-10-12 · ·

A geothermal system is disclosed for cooling a plurality of computer processing devices which includes a first heat exchanger in thermal communication with a plurality of computer processing devices, wherein the first heat exchanger includes a heat absorbing fluid structured to receive heat from the plurality of computer processing devices. The geothermal system further includes a chiller in selective flow communication with the first heat exchanger, wherein the chiller is structured to selectively receive at least a portion of the heat absorbing fluid. The geothermal system further includes a geothermal field structured to exchange heat in the heat absorbing fluid with a geological heat sink.

Multi-fluid renewable geo-energy systems and methods

A geo-energy production method for extracting thermal energy from a reservoir formation. A production well extracts brine from the reservoir formation. A plurality of working fluid injection (“WFI”) wells may be arranged proximate to the production well to at least partially circumscribe the production well. A plurality of brine production (“BP”) wells may be arranged in a vicinity of the WFI wells to at least partially circumscribe the WFI wells. A working fluid is injected into the WFI wells to help drive a flow of the brine up through the production and BP wells, together with at least a portion of the injected working fluid. Parasitic-load time-shifting and to storing of excess solar thermal energy may also be performed.

GEOTHERMAL HEAT UTILIZATION SYSTEM AND OPERATION METHOD FOR GEOTHERMAL HEAT UTILIZATION SYSTEM

The geothermal heat utilization system is capable of supplying underground water of an upper aquifer from the first upper opening to the second upper opening via the first pipe, and capable of supplying underground water of a lower aquifer from the second lower opening to the first lower opening via the second pipe. Further, the geothermal heat utilization system is configured to pump hot water and at the same time, pump cold water.

Geothermal heat mining system
11428441 · 2022-08-30 · ·

A geothermal heat mining system can operate within a single primary borehole in a geothermal reservoir. A primary fluid loop can include a cold working fluid line leading into the primary borehole and a hot working fluid line coming out of the primary borehole. A secondary fluid loop can be located down the primary borehole, where the secondary fluid loop is in thermal contact with the geothermal reservoir and is entirely subsurface. A downhole heat mining device can control a rate of heat transfer from the secondary fluid loop to the primary fluid loop by selectively controlling fluid flow through the primary fluid loop, the secondary fluid loop, or both.

Enhanced geothermal systems and methods

The present invention relates to systems and methods of intelligently extracting heat from geothermal reservoirs. One geothermal well system includes at least one injection well extending to a subterranean formation and configured to inject a working fluid into the subterranean formation to generate a heated working fluid. At least one production well extends to the subterranean formation and produces the heated working fluid from the subterranean formation. A production zone defines a plurality of production sub-zones within the subterranean formation and provides fluid communication between the at least one injection well and the at least one production well. Each production sub-zone is selectively accessed in order to extract heated working fluid therefrom and thereby provide a steady supply of heated working fluid to the surface.

Scale suppression apparatus, geothermal power generation system using the same, and scale suppression method

A scale suppression apparatus capable of suppressing in a low-priced manner the generation of silica-based scale and calcium-based scale in the influent water containing at least a silica component and a calcium component, a geothermal power generation system using the same, and a scale suppression method are provided. The scale suppression apparatus includes a chelating agent and alkaline agent addition unit injecting liquid containing a chelating agent and an alkaline agent into a pipe arrangement through which influent water such as geothermal water or the like flows, and a controller controlling a pump and a valve of the chelating agent and alkaline agent addition unit. The controller controls the injection of the chelating agent and the alkaline agent and stops of the injection based on the signal output from a scale detection unit for detecting a precipitation state of the scale.