F05B2240/915

CRANE BASKET

A device (1) for enabling access to a rotor blade (2) of a wind turbine is described, said device (1) comprising a frame (3) having connecting means (4) located at an upper region of said frame (3) and being structured in the range to be connected to a hoisting device. Such a device should be of simple construction, which is easy to control. To this end said frame (3) is in form of a triangle, said connecting means (4) being located in a region of an edge of said triangle.

Method and means for mounting wind turbines upon a column
20180066633 · 2018-03-08 ·

A variable level, relatively mobile wind power system consists of small, personal use wind turbines mounted upon an axis without need for a concrete mounting platform. As needed, the axis may be brought to the desired level upon a column and retracted to the ground for servicing. The entire wind power system can also be easily transferred to a different location.

Containerized mobile wind power generation apparatus
12180927 · 2024-12-31 · ·

A linear-motion guiding device is disposed on the wall of the container. The wind turbine includes, at the lower end of the support column, a support-column lower end member capable of being fixed to the linear-motion guiding device. A slider of the linear-motion guiding device is provided with a guide member, and a bolt is inserted through a bolt insertion hole in the support-column lower end member and is screwed into a threaded hole in the guide member. The apparatus includes an attachment guide part including a stepped bolt and a flanged step part, the attachment guide part being configured to guide the support-column lower end member to a position and an attitude in which the bolt insertion hole in the support-column lower end member is aligned with the threaded hole in the guide member when the support-column lower end member is not fixed to the slider.

Arrangement for a surface area adjustment of a reciprocating wing system in a wave energy recovery system
09752551 · 2017-09-05 · ·

This invention relates to an arrangement for a surface area adjustment of a reciprocating wing system in a wave energy recovery system where the wave energy recovery system comprises at least a body, a set of wings fastened to a support means that is hinged at its lower ends onto the body to make a reciprocating motion in response to kinetic energy of waves or tidal currents, and a power-take-off means. The arrangement comprises at least adjustment means capable to adjust the total effective surface area of the wings.

Dynamic turbine system
09631503 · 2017-04-25 · ·

Disclosed is a dynamic turbine, capable of altering the sweep area in a large interval by moving a first fixing structure, a second fixing structure and blades to and from an essential same plane along an axis of rotation of the turbine.

Wind turbine defense to escape high wind events

Embodiments of the invention provide a number of passive and active defense designs and methods that enable a wind turbine to escape high wind events. The disclosure includes descriptions of multiple designs and methods for lowering the elevated portion of a wind turbine. Other embodiments of the invention concern ways to connect the elevated portion of a wind turbine to the tower. Numerous counterweight systems are also disclosed which enable the lowering of the elevated portion of the wind turbine.

APPARATUS FOR GENERATING ELECTRICITY FROM A TIDAL OR OCEAN CURRENT WATER FLOW
20170089321 · 2017-03-30 ·

Apparatus (2) for generating electricity from a tidal or ocean current water flow, which apparatus (2) comprises: a plurality of electrical generators (4) for generating electricity; and each electrical generator (4) comprises a rotor (8), a stator (10), and a housing (12); the housing (12) is a multi-sided housing constructed such that the electrical generators (4) are stably connected together; the apparatus (2) includes positioning means (20) for positioning the apparatus (2) above a waterbed (22); and the apparatus (2) includes position-adjusting means (24) for adjusting the height and/or the direction of the housing (12) such that the housing (12) is always able to be at a height and pointing in a direction for receiving maximum flow of water through the housing (12), and thereby to enable the apparatus (2) to generate a maximum amount of electricity from the water flow.

WIND POWER INSTALLATION AND METHOD FOR ADJUSTING THE ROTOR ROTATION AXIS
20170074246 · 2017-03-16 · ·

A wind power installation with a rotor which has two or more rotor blades and which is rotatably bearing-supported for rotation around a rotor rotation axis. The rotor is connected to a generator for generating electrical power. The rotor and the generator form a part of a turbine which is received by a turbine carrier. The turbine carrier is rotatably arranged at a supporting structure. The turbine is movably mounted in the turbine carrier via a bearing device so that the spatial position of the turbine in the turbine carrier can be modified. A pivoting range of the turbine corresponding to a pivoting range of the rotor rotation axis includes a first angle range and a second angle range relative to a reference plane, and the entire pivoting range is at least 120.

Adjustable platform for installing wind turbine generator

An adjustable platform for installing a wind turbine generator comprises an adjustable platform shell, the adjustable platform shell is installed on a hull, pile legs are connected vertically in the adjustable platform shell in a sliding way, a plurality of adjusting jacks are arranged on the pile legs, an electric plug-in component is arranged in the adjustable platform shell and used for fitting with the adjusting jacks. The fitting of electric plug-in component with the adjusting jacks of the pile legs replaces the bolted connection between the installation platform and the pile legs, and the electric power is used to replace the manual operation, solving the technical problems in the prior art that bolted connection is required between the installation platform and the pile legs, bolts are required to be removed manually before the pile legs sink, and the labor cost is greatly consumed.