G21D3/04

Reactor shutdown system with melting gate member for segregating neutron absorbing material compartment from core
11289215 · 2022-03-29 · ·

A system for use in shutting down a nuclear reactor includes a housing that defines a region therein sealed from an ambient environment and a gate member disposed within the region in a manner such that the gate member segregates the region into a first compartment and a second compartment isolated from the first compartment. The gate member is formed from a material having a predetermined melting point. The system further includes a neutron absorbing material disposed within the first compartment and a dispersion mechanism disposed within the region. The dispersion mechanism structured to encourage the neutron absorbing material from the first compartment into the second compartment.

Nuclear reactor cooling arrangement having a stirling engine

A reactor cooling and power generation system according to the present disclosure includes a reactor vessel, a heat exchange section formed to receive heat generated from a core inside the reactor vessel, from a feedwater system through a fluid, and an electric power production section. A Stirling engine is provided to produce electric energy using the energy of the fluid whose temperature has increased while receiving the heat of the reactor. The system is formed to circulate the fluid that has received heat from the core in the heat exchange section through the electric power production section. The system operates even during a normal operation and during an accident of the nuclear power plant. The reactor cooling and power generation system accompanies a nuclear reactor vessel which includes a reactor coolant system, a feedwater system and a steam generator. A turbine produces electric power from the feed water system.

Methods for protection of nuclear reactors from thermal hydraulic/neutronic core instability

The invention relates to methods for protecting a nuclear reactor core, such as a boiling water reactor core, from fuel and cladding damage due to thermal hydraulic instability in extended operating power flow conditions and, in particular, when an extended power uprate is implemented. The methods employ existing licensed stability methodologies and incorporated minor changes, e.g., to the Average Power Range Monitor (APRM)-based trip system to preclude operation inside the stability vulnerable region of the power/flow map. The APRM-based trip system is modified to set down the APRM flow-biased scram line when core flow is less than a predetermined core flow to prevent the core from entering an unstable region of operation.

Methods for protection of nuclear reactors from thermal hydraulic/neutronic core instability

The invention relates to methods for protecting a nuclear reactor core, such as a boiling water reactor core, from fuel and cladding damage due to thermal hydraulic instability in extended operating power flow conditions and, in particular, when an extended power uprate is implemented. The methods employ existing licensed stability methodologies and incorporated minor changes, e.g., to the Average Power Range Monitor (APRM)-based trip system to preclude operation inside the stability vulnerable region of the power/flow map. The APRM-based trip system is modified to set down the APRM flow-biased scram line when core flow is less than a predetermined core flow to prevent the core from entering an unstable region of operation.

Apparatus and method for evaluating reliability of nuclear power plant operator

In an apparatus for evaluating reliability of a nuclear power plant operator, an expected task finishing time for each task of the operator is calculated based on input data for reliability evaluation of the operator to determine a task completion time for each task of the operator based on the calculated expected task finishing time and the input data. An initial time for the tasks is determined based on the input data and the task completion time for a current task. A total execution time of the operator is calculated based on the determined task completion time and initial time. An available time allowed for the operator to complete the tasks is calculated based on a predetermined allowed time and the determined initial time. A task failure probability is obtained from the difference between the calculated total execution time and the calculated available time based on probability distribution information.

Method and system for bringing a nuclear power plant into a safe state after extreme effect

The method and system for bringing a nuclear power plant to a safe state after extreme effect reduce the temperature of the coolant after extreme effect. The system includes inlet and outlet pipelines, a steam generator, a storage tank and a heat exchanger, a separation tank above the steam generator and connected by two pipelines to a storage tank, a pump, a control unit. The method involves filling the system with coolant, feeding the coolant from the steam generator through the inlet pipeline and the storage tank to the heat exchanger, and feeding the coolant through the outlet pipeline back to the steam generator, wherein the pump is turned on for feeding the coolant and subsequent operation of the system. The first air valve is used to maintain pressure in the system, ensuring the absence of boiling of the coolant.

Systems and methods for real-time data processing and for emergency planning

Systems and methods are described herein for real-time data processing and for emergency planning. Scenario test data may be collected in real-time based on monitoring local or regional data to ascertain any anomaly phenomenon that may indicate an imminent danger or of concern. A computer-implemented method may include filtering a plurality of different test scenarios to identify a sub-set of test scenarios from the plurality of different test scenarios that may have similar behavior characteristics. A sub-set of test scenarios is provided to a trained neural network to identify one or more sub-set of test scenarios. The one or more identified sub-set of test scenarios may correspond to one or more anomaly test scenarios from the sub-set of test scenarios that is most likely to lead to an undesirable outcome. The neural network may be one of: a conventional neural network and a modular neural network.

Systems and methods for real-time data processing and for emergency planning

Systems and methods are described herein for real-time data processing and for emergency planning. Scenario test data may be collected in real-time based on monitoring local or regional data to ascertain any anomaly phenomenon that may indicate an imminent danger or of concern. A computer-implemented method may include filtering a plurality of different test scenarios to identify a sub-set of test scenarios from the plurality of different test scenarios that may have similar behavior characteristics. A sub-set of test scenarios is provided to a trained neural network to identify one or more sub-set of test scenarios. The one or more identified sub-set of test scenarios may correspond to one or more anomaly test scenarios from the sub-set of test scenarios that is most likely to lead to an undesirable outcome. The neural network may be one of: a conventional neural network and a modular neural network.

Independent process signal control and monitoring system for a nuclear reactor containment vessel
11145426 · 2021-10-12 · ·

A process signal control and monitoring system, includes: a signal processing device which is installed on an outside of a nuclear reactor containment vessel, an internal electrical power source, an analog-digital conversion part, an internal communication part which transmits the digital signal to the signal processing device, an internal repeater, and an external repeater which transmits the received signal to a communication satellite. When electric power supply from the signal processing device is disconnected, the internal electrical power source supplies electric power which is charged in the rechargeable battery, to the analog-digital conversion part and the internal communication part; and the internal communication part judges whether communication with the signal processing device is continued or disconnected; and when the communication is judged to be continued, the internal communication part continues transmitting the digital signal to the signal processing device.

Independent process signal control and monitoring system for a nuclear reactor containment vessel
11145426 · 2021-10-12 · ·

A process signal control and monitoring system, includes: a signal processing device which is installed on an outside of a nuclear reactor containment vessel, an internal electrical power source, an analog-digital conversion part, an internal communication part which transmits the digital signal to the signal processing device, an internal repeater, and an external repeater which transmits the received signal to a communication satellite. When electric power supply from the signal processing device is disconnected, the internal electrical power source supplies electric power which is charged in the rechargeable battery, to the analog-digital conversion part and the internal communication part; and the internal communication part judges whether communication with the signal processing device is continued or disconnected; and when the communication is judged to be continued, the internal communication part continues transmitting the digital signal to the signal processing device.